Entergy Louisiana, LLC (North) Proposed Transmission Reliability Projects. ELL-North Transmission Reliability Projects. Northwest LA / South AR voltage support (Sarepta). NW Louisiana/South Arkansas Voltage Support Plan. Scenario:

Download Presentation

Entergy Louisiana, LLC (North) Proposed Transmission Reliability Projects

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Entergy louisiana llc north proposed transmission reliability projects

Entergy Louisiana, LLC (North)Proposed TransmissionReliability Projects


Entergy louisiana llc north proposed transmission reliability projects

ELL-North Transmission Reliability Projects

Northwest LA / South AR voltage support (Sarepta)


Nw louisiana south arkansas voltage support plan

NW Louisiana/South Arkansas Voltage Support Plan

Scenario:

  • The following single contingencies will result in low voltages to occur in the southwestern corner of the EAI service territory:

    • Loss of the Magnolia East - McNeil line segment

    • Loss of the Magnolia Steel - Magnolia East line segment

    • Loss of the Magnolia Steel - Kerlin S.S. line segment

  • Additionally the contingency outage of any of the following lines:

    • 115 kV line from Carroll to RingGold

    • 115 kV line from Truss to Vienna

    • 115 kV line from Vienna to MT. Olive

    • 115 kV line from SpringHill to Taylor

    • 115 kV line from Haynesville to Emerson

    • 115 kV line from Danville to Jonesboro

  • The low voltage concerns propagate into north Louisiana (Lucky substation).

  • Capacitor bank additions alone do not provide sufficient improvement to this region.

  • The transmission grid performance can be improved by providing a new EHV source to the area.

    Proposed Solution:

  • Build a new 345 - 115 kV station at Sarepta by tapping the El Dorado to Longwood 345kV line

  • Install a 21.6 MVAR capacitor bank at Emerson.

  • Install a 32.4 MVAR cap bank at Lucky

  • Install a 32.4MVAR cap bank at Vienna

  • Proposed In-Service Date: 2011

    Estimated Cost: $26 MM


Entergy louisiana llc north proposed transmission reliability projects

Emerson/ Sarepta Area

Emerson: 21.6 MVAr Capacitor Bank

Sarepta: Build 345 - 115kV substation; Tap El Dorado-Longwood line


Entergy louisiana llc north proposed transmission reliability projects

Cap Bank Installation


Identified target areas 2012 and beyond

Identified Target Areas 2012 and Beyond

Complete 230 kV loop around W. Monroe Area

Sterlington to Bastrop fix

Red Gum Area 115kV Voltage Improvement Plan

Grambling–Winnfield Reenergize 230 kV Line

115kV System Improvement Around Delhi

Plantation & Red Gum115 kV Line Trap Upgrades