An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. 1 SAN ANTONIO RIVER IMPROVEMENTS PROJECT April 2006

    2. 2

    3. 3 City of San Antonio – Provides project funding for project amenities (i.e.. Sidewalks, Landscaping, Lighting, etc.) and recreation. San Antonio Water System is providing funding for utility relocation Bexar County – Provides project funding for flood control and river restoration elements of the project San Antonio River Authority (SARA) – Provides project administration and management U.S. Army Corps of Engineers (USACE) – Provides federal funding for river restoration and some recreational funding San Antonio River Foundation – Provides private funding to support project San Antonio River Oversight Committee – A 22 person citizens committee established in 1998 with members appointed by the City, County and SARA representing the various neighborhood and business stakeholders along the river.

    4. 4 Project Benefits

    5. 5 Project Development Process Repair the historic downtown Riverwalk from Houston to Lexington first. Radiate out from downtown going north and south at the same time.Repair the historic downtown Riverwalk from Houston to Lexington first. Radiate out from downtown going north and south at the same time.

    6. Project Schedule

    7. 7 Current Project Estimate October 2005 Presented in Million Dollars (inflated)

    8. 8

    9. 9 Eagleland Project

    10. 10 Eagleland – Cut Stone Wall

    11. 11 Eagleland - Riffle Structure

    12. 12 Eagleland – Outfall #10

    13. 13

    14. 14 Ecosystem Restoration

    15. 15 Ecosystem Restoration

    16. 16 Project Vision Historical Mission Reach at Ashley Road (looking North)

    17. 17 Project Vision Historical Mission (Southern) Reach at Loop 410 South

    18. 18 Ecosystem Restoration COMMENT: Native grasses are included only where trees cannot be planted due to hydraulic constraints.COMMENT: Native grasses are included only where trees cannot be planted due to hydraulic constraints.

    19. 19 Improved Human Habitat

    20. 20 Cultural Connections

    21. 21 Scenic Overlooks

    22. 22 Project With All Components

    23. 23 Mission Reach 30% Final Design due June 2006 SARA and USACE finalizing Project Cooperation Agreement to support completion of design and construction USACE finalizing agreement with National Parks Service for land transaction Working to secure federal funding for construction

    24. 24 Mission Reach Construction Phasing Mission Reach Segment 1: Lone Star to San Pedro Creek: Mid 2007 through Mid 2009

    25. 25 Museum Reach

    26. 26 Project Vision Museum Reach: Urban Segment Museum (Northern) Reach at Brooklyn Ave.

    27. 27 Museum Reach Urban Segment Scenario “G” Typical Channel Section

    28. 28

    29. 29

    30. 30 Museum Reach Urban Segment

    31. 31

    32. 32 Museum Reach Urban Segment Restored Steel Truss Bridge – Privately Funded

    33. 33 Museum Reach Urban Segment Grotto – Privately Funded

    34. 34

    35. 35

    36. 36 Museum Reach Urban Segment Items to be Privately Funded Sidewalks & Stairs Overlooks Landscaping Irrigation Islands Marshes Lighting Emergency Call Boxes Safe Harbor Boat Ramp Accessible Ramps Benches & Trash Cans Signage Water Features Roy Smith Bridge Art

    37. 37 Project Status Report Museum Reach To support accelerated construction schedule for the Camden to Josephine Reach, City is requesting a modified project delivery method County, City and SARA currently negotiating Interlocal Agreement SARA is working to secure required permits for the project

    38. 38 Project Status Report

    39. 39 SAN ANTONIO RIVER IMPROVEMENTS PROJECT April 2006