Netc n7 status update to aim frb roy hoyt netc n74 leslie lucas slc lso jake aplanalp aim pgm mgr
Download
1 / 17

15-17 Feb 11 - PowerPoint PPT Presentation


  • 160 Views
  • Uploaded on

NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr. 15-17 Feb 11. Overview. NAVEDTRA 130B, 131B, 135C, NAVEDTRA drafts - 132, 137, 139 NAVEDTRA 136 (ILE) re-write status & effect on AIM/CPM

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' 15-17 Feb 11' - anana


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Netc n7 status update to aim frb roy hoyt netc n74 leslie lucas slc lso jake aplanalp aim pgm mgr
NETC N7 Status Update to AIM FRBRoy Hoyt, NETC N74Leslie Lucas, SLC LSOJake Aplanalp, AIM Pgm Mgr

15-17 Feb 11


Overview
Overview

  • NAVEDTRA 130B, 131B, 135C,

  • NAVEDTRA drafts - 132, 137, 139

  • NAVEDTRA 136 (ILE) re-write status & effect on AIM/CPM

  • AIM/CPM status support of JDTA w/ participating Center updates

  • AIM/CPM status support of OCCSTD capture/validation

  • NETC/OPNAV N15 integration of NETC domain/acquisition community business processes

  • AIM/CPM integration status w/ Perception

  • FEA/BCA capability plans for CPM

  • PPP Repository status

  • SLC e-library project overview


NAVEDTRA 130B, 131B, and 135C Status

  • 130B

  • 131B (signed Nov 10)

  • 135C


NAVEDTRA 132, 137, 139 Status

  • 132 (Assessment)

  • 137 (JDTA)

  • 139 (FEA)


NAVEDTRA 136 (ILE) Re-write

  • Current status

    • Promulgated by NETC in Nov 10

    • 136A in work to address user community feedback and extend/refine ILE learning content business rules

  • AIM/CPM impact

    • JDTA Tab - Rename “Skills Hierarchy” Report “Job Duty Task Analysis” Report

    • Project Tab - Rename “Performance Requirements” branch of Projects to “CTTL”

    • Project Tab – Rename “COI with ISD Considerations” report to “IMDP”

    • Projects Tab- Rename “ISD Considerations” link on C/M/L/S to “IMDP/Learning Strategy Elements”


AIM/CPM Support of JDTA and Participating Center Updates

  • CPM Rel 4.0 operational Jan 10 / Rel 5.0 to be delivered Mar 11 – (Numerous minor updates have been made since Rel 4.0)

  • JDTA NETCINST 1510.4 promulgated 24 Feb 10 / NAVEDTRA 137 in development

  • Center projects:

    • CPPD/CSFE: Curriculum Developer

    • SLC/CSCS: IT Rating

    • CID: Information Professional

    • NETC N72/Carley: ‘A’ School re-engineering

    • PMS 420/NAWCTSD: LCS mission pkg JDTA


AIM/CPM Support of OCCSTD Capture/Validation

  • NETC N74 coordination with NAVMAC

  • CPM JDTA tab being adapted for OCCSTDS tab specific requirements

    • Part of CPM Rel 5.0

  • AIM team working with NAVMAC and NETPDTC on OCCSTDS data interface with Perception LAS for fleet validation of preliminary OCCSTDS


Integration of NETC Domain/Acquisition Community Business Processes

  • SPAWAR and NAVSSES Philadelphia working JDTA projects in CPM

  • Other?


AIM Interface with Perception LAS Processes

  • Support for NETC N51 assessment program as well as for NAVMAC OCCSTDS fleet validation process

  • Working with NETC, NAVMAC, and QuestionMark for implementation via Perception API

  • Participants:

    • NAVMAC and NETC N51 as SMEs

    • NETPDTC as Navy technical agent for Perception

    • AIM team on Web service data output from AIM I, AIM II, and LO Module


FEA/BCA Capability Plans for CPM Processes

  • FEA – NETCINST 1500.6 (NAVEDTRA 139)

  • BCA – NETCINST 1510.3

  • Business processes integrated into NAVEDTRA 136

  • AIM team supporting business process definition

    • initial design of CPM support for FEA/BCA as part of Rel 5.0 development

    • implementation in future release


PPP Repository Status Processes

  • AIM team supporting NETC N74 (Leslie Desenburg) in operation of the PPP repository hosted on fedsun at NAWCTSD

  • Coordinating with NETPDTC for eventual transition to NETC enterprise data center


SLC e-Library Project Overview Processes

  • Goal: Provide site access to electronic library

    • Validated mission, functions, tasks of Librarians

    • Developed business rules for access, inventory control , and user requests

    • Identified publications available electronically to support CINs

    • Defined functional requirements for e-library layout

    • Planned for hosting and deployment

  • Project lead: Beth Wigfield (SLC N6)


Questions? Processes


Backup Slides Processes


NAVEDTRA 132 Navy School Testing Program Management Manual Processes

  • Current re-write status

    • NETC N74 staff finalizing draft update

  • AIM/CPM impact


  • AIM/CPM impact continued Processes

    • Proposed condensing skill and knowledge proficiency levels to three levels each. This differs from KSATRs. Skill proficiency is based on Alexander Romiszowski’s taxonomy of Imitation, Practice, and Habit. Knowledge is based on Bloom’s Taxonomy (Cognitive Domain)(1) knowledge and comprehension; (2) application and analysis; and (3) synthesis and evaluation.

    • CPM data to be utilized in test design/recommendations (performance, frequency, criticality, etc.)

    • “ . . . establishes the requirement that curriculum developers use the empirical data gathered in NETC’s Course Development and Revision End-to-End Process, so that they are fully informed about the nature of the work, the relationship of the learning objectives to the work, and the Navy’s training expectations based upon validated Fleet requirements” – NAVEDTRA 132


NAVEDTRA 137 [JDTA] Processes

  • Current status

    • NETC N74 staff finalizing draft

  • Intended application

  • AIM/CPM impact


ad