Download
1 / 40

Hon. Administrator - PowerPoint PPT Presentation


  • 88 Views
  • Uploaded on

Organizational Chart of Electricity Department of UT of D&NH. Hon. Administrator. Secretary (Power). I/c E.E.(L& V) Shri B.P.Patel. I/c E.E.(Dist) Shri H.M.Patel. I/c E.E.(Trans) Shri B.R.Tamboli. Ministerial staff. I/c D.E.(Trans). H.C. I/c D.E.(V&L). Comm.Acct. J E 1 No.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Hon. Administrator' - amela-blevins


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Organizational Chart of Electricity Department of UT of D&NH

Hon. Administrator

Secretary (Power)

I/c E.E.(L& V)

Shri B.P.Patel

I/c E.E.(Dist)

Shri H.M.Patel

I/c E.E.(Trans)

Shri B.R.Tamboli

Ministerial

staff

I/c

D.E.(Trans)

H.C

I/c D.E.(V&L)

Comm.Acct

J E 1 No

J E 2 No

I/c

D.E(comm)

I/c

D.E.(NZ-I)/II

I/c

D.E.(SZ/ASW)

I/c

D.E.(Proj)

J E 5 Nos

J E 2 Nos

J E 1 No


BASIC FACTS

  • 100% electrification of all the villages.

  • 09 Sub-stations of 66/11 KV

  • 02 Sub-stations of 220/66 KV.

  • Industrial Load (HT/LT) - 97%.

3



Category wise consumption 2011 12
Category Wise Consumption ( 2011-12 )

Unit Sold Percentage (%)

Domestic 56.22 1.326

Commercial 27.81 o.656

Ind(LT) 152.19 3.59

Ind(HT) 3990.2 94.17

Agri & Poultry 3.0 0.0708

P.L 5.12 0.12

Temp Supply 2.6 0.061

4237.16 100%




CTU

&

GETCO

66kV

Ambheti 220kV

Vapi 66kV

Bhilad

DNH

Direction of

Power Flow

Direction of

Power Flow

Drawl of 570-620 MW

Industrial Load

Industrial Load

8


Interconnected Lines of GETCO and DNH after commissioning of

400 KV Vapi (PGCIL) Sub-station.

66kV S/C

Via-IV Phase

Vapi-Dadra Line

66kV

Sub-station

Dadra-DNH

220kV

Sub-station

Vapi-GETCO

50 MW

400kV

Sub-station

Vapi-Ambheti

PGCIL

(CTU Point)

220kV Vapi-Kharadpada CTU Line

Kharadpada-Dadra 66 KV Line

127 MW

220kV

Sub-station

Kharadpada

-DNH

220kV

Sub-station

Bhilad-GETCO

127 MW

220kV D/C Line

From Ambheti

66 KV s/s

Khanvel

66KV D/C line

66 KV s/s

Rakholi

220kV

Vapi (PGCIL)-Khadoli

D/C Line

66kV

Sub-station

Athal-DNH

66kV

Sub-station

Masat-DNH

66 KV s/s

Khadoli

66KV D/C

line

66KV line

66KV T/C

line

66kV

Sub-station

Silli-DNH

66kV D/C

Bhilad-Silvassa Line

220kV

Sub-station

Khadoli-DNH

66kV

Sub-station

Silvassa-DNH

40 MW

40 MW

9


220/66kV Sub-station

Vapi, GEB

400/220kV Sub-station

PGCIL,Vapi

66/11kV Sub-station

Dadra (85 MVA)

Proposed LILO

Arrangement of

220kV Ambheti-Khadoli line

530 A

Proposed 66/11kV,

2x15MVA

S/s Waghdhara

220kV Tarapur-Navsari Tr. line

Proposed 66/11kV,

2x15MVA

S/s Piparia

Proposed 220/66kV,

S/s Waghchhipa

Stand by

120 A

66/11kV Sub-station

Silli (30 MVA)

430 A

430 A

395 A (Wolf)

66/11kV Sub-station

Amli (65 MVA)

Proposed 66/11kV,

2x20MVA

S/s Athal

220/66kV Sub

-station

Bhilad

359 A on both ckt.

66/11kV Sub-station

Masat (50 MVA)

595 A

220/66kV Sub

-station

Kharadpada

(350 MVA)

560 A

290 A

66/11kV Sub-station

Rakholi (55 MVA)

340 A

References

220/66kV S/s

220kV line

66/11kV S/s

66kV Line (Panther)

Proposed 220kV line

Proposed 66kV line

Proposed 220/66kV S/s

400/220kV S/s

66kV proposed S/s

560 A

Proposed 220kV D/C line (Moose)

66/11kV Sub-station

Khadoli (70 MVA)

60 A

220/66kV

S/s Khadoli

66/11kV Sub-station

Khanvel (30 MVA)

Proposed 66/11kV,

2x15MVA

S/s Kala

10


Transmission Network

  • 220 KV– 4 circuits from Ambheti (PGCIL) to Kharadpada and Khadoli.

  • 66 KV – 5 circuits

    • 2 Circuits from 220/66 KV Bhilad Sub-station (GETCO) to 66/11 KV Amli Sub-station (DNH).

    • One Circuit from 220/66 KV Bhilad Sub-station (GETCO) to 66/11 KV Masat Sub-station (DNH).

    • 2 circuit from 66/11 KV Vapi IV-Phase Sub-station (GETCO) to 66/11 KV Dadra Sub-station (DNH).




Details of existing 66/11 KV Sub-stations of lines from Getco.

Electricity Department

14


66 kv bulk consumers
66 KV Bulk Consumers lines from Getco.

  • Consumers : 30 Nos.

  • Contract Demand : 410 MVA


Distribution Network lines from Getco.

66kV Lines

16


Present scenario of power availability and drawl
Present scenario of power availability and Drawl lines from Getco.

  • Allocation of central sector power (peak) :- 640 MW

  • (Off-peak) :- 542 MW

  • Allocation of power from Bhilai Power Plant :- 100 MW

  • Unallocated power from Bhilai whenever :- 64 MW

    available and requisite.

  • Total Connected load :- 1070 MW

  • Peak Demand of power :- 620 MW

  • Average drawl of Power :- 550-620 MW

  • Daily scheduled availability of power :- 550-700 MW

    from Grid

17




Short term power purchase from tata power
Short Term Power Purchase from TATA Power lines from Getco.

  • 70 MW Since October 2011

  • @ ` 3.95 per Unit

  • Effective rate after rebate ` 3.86 per Unit

  • Required to be renewed w.e.f. 15.09.2012




Future Power Arrangement lines from Getco.

The Administration is in a process to procure 200 MW power on Long-Term Basis through bidding.

The Administration is also having membership with Indian Energy Exchange for procurement of power by bidding process in case of emergency i.e. on day ahead bidding basis.


Power Drawl lines from Getco.

(Figures in MUs)

25


Allocation and Expenditure during the 11 lines from Getco.th plan period

(` in Crore)

26


On going Projects/Future Projects lines from Getco.

220/66KV Transmission Division ( ` in crore)


On going Projects/Future lines from Getco.Projects

66/11KV Distribution Division ( ` in Crore )



JERC lines from Getco.

  • Commission started its functioning for all Union Territories and Goa State since September,2008 & having its office at Gurgaon, Haryana.

  • The first tariff order of ED-DNH issued by the Commission on 1st November,2010 for the year 2010-11.

  • The second tariff order of ED-DNH issued by the Commission on 13th September,2011 for the year 2011-12

  • The third tariff order of ED-DNH issued by the Commission on 09.08.2012 for the year 2012-13 along with re-determination of tariff order FY 2011-12 as per the order of Hon’ble APTEL.


Tariff structure
Tariff Structure lines from Getco.


Tariff structure1
Tariff Structure lines from Getco.


Tariff structure2
Tariff Structure lines from Getco.


Tariff structure3
Tariff Structure lines from Getco.


Dnh power distribution corporation ltd
DNH Power Distribution Corporation Ltd lines from Getco.

  • NOC from MHA :- 29th Sept 2011

  • NOC from MOP :- 29th Feb 2012

  • Incorporation of the company :- 13th July 2012

  • 1st board meeting :- 24th Aug 2012

  • Grant in Aid :- ` 70 crore

  • Share capital :- ` 40 crore

  • Chairman :_Hon’ble Administrator

  • Managing Director :- Gyanesh Bharti, Secretary (Power)

  • Director :- Smt.Alaka Divan (MD OIDC)

  • Further Actions Required:

  • Transfer notification to be finalized and to be implemented by 01.10.2012

  • To Prepare logo of the corporation, transfer of assests and employees


As per the JERC regulation in 2009 the CGRF of UT of DNH has started its functioning from 25.08.2011

Chairman:-ShriLal Singh (Retd)

Member:-Shri T.D. Davda (Retd)

JERC appointed member: ShriM.C.Gandhi(Retd)

Office Address:-Electricity Department, Amli, Silvassa

CGRF

36


Open access
Open Access has started its functioning from 25.08.2011

  • As per the JERC open access Regulations 2009, the ED-DNH has notified Short term and Long term procedures.

  • At present there is no any open access customer

  • ED-DNH is in a process to formulate open access charges like transmission /wheeling charges, losses charges, cross sub cidy etc

  • Ministry of Power has directed that the consumers of 1 MW and above demand are deemed to be open access customer and are not under the preview of regulatory regime as per the opinion given by the Ministry of Law and Justice.


Status of computerization at present
Status of Computerization at present has started its functioning from 25.08.2011

  • RACE billing software implemented.

  • On line (AMR) reading of bills for 29 bulk 66 KV Consumers.

  • 150 HT Consumers are also installed AMR.

  • Any Time Payment machine (ATP) installed.

  • 8 Post Offices are designated as collection centre.

  • Tender for GIS mapping and Energy Audit for 11 KV feeders is under finalization.


Future programme for computerization
Future Programme for Computerization has started its functioning from 25.08.2011

  • All HT Consumers to be installed with AMR by Oct,2012.

  • LT Consumers to be installed with AMR by March,2013.

  • Website is ready, security audit is going on, to be launched in 2 months.

  • Integrated solutions for electricity networking.

  • After computerization of integrated solutions , SMART GRID can be implemented.


Thank You has started its functioning from 25.08.2011

40