1 / 13

Mobile Facilities Logistics Review Group

Mobile Facilities Logistics Review Group. 2010 LRG Presented By: Lakehurst Logistics Jamie Green Code 6.7.6.2 Comm: (732) 323-1847 DSN: 624-1847. Agenda. SERD Revisions/Impact Technical Directives SEC 5824 SEB 1034 IRACs TQG Bearing ECP Fleet Input/Feedback

amable
Download Presentation

Mobile Facilities Logistics Review Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mobile Facilities Logistics Review Group 2010 LRG Presented By: Lakehurst Logistics Jamie Green Code 6.7.6.2 Comm: (732) 323-1847 DSN: 624-1847

  2. Agenda • SERD Revisions/Impact • Technical Directives • SEC 5824 • SEB 1034 • IRACs • TQG Bearing ECP • Fleet Input/Feedback • KA-18/KA-31 Configuration/Provisioning • NAVAIR 19-25-177 • Questions

  3. SERD Revisions/Impact • Revision of SERD 0008 to reflect the R-22 being superseded by the R134A ECU • Revision of SERD 0254, Robinair Recovery/Recycler Unit • Reflect quantities authorized per site. • Each MALS to receive 3 each • MALS-13 to receive 6 each

  4. Technical Directives • SEC 5824 – Upgrade to Mobile Facility ECU Cooling Cable Circuit Cable to 40 AMPS, Issue Date: 10 March 2010 • - Upgrade required to accommodate the increased current • requirement for the 1559AS400-1, R134A ECU. • - Can be installed with either the R-22 ECU, • PN 1559AS100-1 or the new R134A ECU, • PN 1559AS400-1. • - Amendment 1: Identify configurations not affected due to • sundown/offloading/survey, refurbishment or replacement.

  5. Technical Directives (cont.) • SEB 1034 - One Time Inspection of Environmental Control Unit, A/E32C-45A (Setscrew), DTG: 072155Z JAN 10(verification) • R134A ECU Impeller Fan Assembly Failure. • Potential hazard to the Fleet reported • Identified the Setscrew as the problem • Replacement Setscrew available to the Fleet through • request.

  6. Technical Directives (cont.) • IRAC 001, to Technical Manual NA 19-600-152-6-2, Periodic Maintenance Requirements Manual Mobile Facilities, Dated 1 October 2008, DTG: 111537Z MAY 09 • To provide additional method of maintenance for the • washing of Mobile Maintenance Facilities (MMF) with • Biodegradable and Non-Emulsifying Detergent.

  7. Technical Directives (cont.) • IRAC 008, to Technical Manual 19-25-177, Operation and Intermediate Maintenance with Illustrated Parts Breakdown, Dated 1 March 1995, DTG: 152121Z APR 09 • - To provide additional method for maintaining ISO • Markings on Mobile Maintenance Facilities (MMF) • and reduce Maintenance Costs associated with • replacement decals..

  8. Technical Directive (cont.) • IRAC 009, To Technical Manual 19-25-177, Operation and Immediate Maintenance Instructions with Illustrated Parts Breakdown for Mobile Facilities, Dated 30 April 2005, DTG: 041958 JAN 10 • - Installation and Security of Mobile Facility Panels during shipment.

  9. TQG Bearing ECP • The Caterpillar Pulley Group part number will change on all new engines starting with S/N: BDZ01869. - Pulley Group P/N changed from 143-7018 to 344-7484 - Bearing P/N 200-2282 replaced by P/N 307-9798 - Army is incorporating changes to the manual.

  10. Fleet Input/Feedback • TPDRs • 16 TPDRs have been validated • 3 New TPDRs are in review • QDRs • Need reports submitted

  11. Mobile Facilities Configuration Manual AG-360MF-CCD-000, 1 April 1990 • Update to the Manual • Review of Configuration to determine the path of support needed for configuration. • Utilized the KA-18/KA-31 Configuration. • Created SERDs for the two configurations. • Obtained drawings and submitted package to NAVIP for provisioning.

  12. NAVAIR 19-25-177 • Manual Update Initiative • Review/Proposed Update • Converted to a Word Document • Incorporation of TPDRs and IRACs • Awaiting Engineering Data • Estimated Completion: 12/10

  13. QUESTIONS

More Related