Bingay Metallurgical Coal Project 滨盖冶金煤项目. Centermount Coal Ltd. 加拿大中山焦煤有限公 司 Office Suite 1385 1095 West Pender St. Vancouver BC V6H 2N7 Tel : 604-568-3388 Vancouver , Canada 温哥华,加拿 大 Oct . 2013 年 10 月. Project Location 项目位置.

Download Presentation

Bingay Metallurgical Coal Project 滨盖冶金煤项目

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Bingay metallurgical coal project

Bingay Metallurgical Coal Project滨盖冶金煤项目

CentermountCoal Ltd.

加拿大中山焦煤有限公司

Office Suite 1385

1095 West Pender St.

Vancouver BC V6H 2N7

Tel: 604-568-3388

Vancouver, Canada

温哥华,加拿大

Oct. 2013年10月


Project location

Project Location 项目位置

  • The Bingay Main Asset is located in the southeast corner of B.C., in the East Kootenay portion of the Rocky Mountain coal field, covering 11.57 sq. km. The Asset is adjacent to Teck Coal’s Fording River Operation, which produces 8 million tonnes of coking coal annually, and is located within the “Coal Enhanced Resource Development Zone” incorporated into the south Rocky Mountain Land Use Plan.

  • 滨盖主区位于英属哥伦比亚省东南角,落基山脉煤田的East Kootenay 区域。该矿床靠近Teck Coal 的Fording River 矿作业区,年产焦煤800 万吨;同时位于落基山脉南部土地利用规划中的“强化煤炭资源开发区”内。

Chetwynd

Cinnabar Peak

朱沙峰

Prince Rupert

加拿大铁路

Prince George

亚伯达省

Bingay Creek

滨盖小溪

太平洋

加拿大太平洋铁路

温哥华

美国


Map of bingay areas main a b and c bingay a b c

Map of Bingay Areas Main, A, B, and CBingay 主区,A,B,C区地图

  • Bingay Main license 100% owned by Center mount

  • 中山焦煤有限公司拥有100%的滨 盖主区

  • BingayABC licences 100% owned by Centerpoint

  • 中央资源有限公司拥有100%的滨盖ABC

  • Notice of work of Bingay ABC obtained

  • 拥有滨盖ABC工作许可

  • All licenses are current

  • 所有的权证都是有效的

  • (Centerpoint is the holding company of Centermount

  • (中央公司为中山公司的控股公司)

Bingay A Area 7.50km2 滨盖A区 面积7.5平方公里Coal License Number: 执照号:418200

A

Bingay Main 滨盖伊主区

Coal License Number:

执照号:374190 414014

415139 417302

Area 11.57km2面积11.57平方公里

MAIN

主区

  • BingayB Area 6.75km2

  • 滨盖B区 面积6.75平方公里

  • Coal License Number:

  • 执照号:418201

Teck

Fording

B

C

  • Bingay C Area 15km2

  • 滨盖C区 面积15平方公里

  • Coal License Number:

  • 执照号:418202


Bingay main property

Bingay Main Property

滨盖主区

Fording coal

operations

Figure 1: Map showing Bingay Main coal license location

图1:滨盖主区煤田许可证位置图


Bingay main property1

BingayMain Property 滨盖主区

Coal seam No. 10

10号煤层


Bingay main property2

BingayMain Property 滨盖主区


Infrastructure and transportation consideration

交通及基础设施完善Infrastructure and Transportation Consideration

  • Road :Existing major forest service roadway in place, standard upgrading to be completed during project construction

    公路 : 当地已有为林区提供服务的公路干道,在本项目施工过程

    中将完成对公路的标准升级改造

  • Rail & Port: Close to Canadian Pacific Railway which has the capacity for

    Bingay .Port facilities (Westshore, Neptune) are expected to provide

    capacity by 2016 to handle the mine production.

    铁路和海港 : 临近加拿大太平洋铁路,为滨盖项目提供足够运力。港口设施(西岸和海王星码头)

    于2016 年形成足够运力 满足矿区产出。


Infrastructure and transportation consideration1

交通及基础设施完善Infrastructure and Transportation Consideration

Water : Surface runoff from a nearby creek and groundwater removed from the open pit sufficient for the project development

用水 : 附近小溪的地表径流和露天开采过程中排出的地下水足够满足项目发展的需要

Power : Grid power available through a 138 kV transmission line adjacent to the Asset

电力 : 紧邻本资产有一条138 千伏的输电线路连接电网


Geological coal resource

Geological Coal Resource煤炭地质资源

Prefeasibility study report - August 2012

预可研报告 – 2012年8月

Resource defined from 资源量来自:

Excludes seams less than 0.8m and coal below 900m elevation

以上不包含小于0.8米的煤层和海拔900米以下的煤

Huge potential on Bingay A,B & C area 29.25 km2,drill holes show 32 coal seams

滨盖A、B、C面积29.25平方公里潜力巨大,钻孔表明有32个煤层


Geological coal resource1

Geological Coal Resource煤炭地质资源

每个煤层百分比

% of each

coal seam

Metallurgical Coal Tonnage Total

焦煤吨位总数 141,806,190


Plan view of bingay main deposit

Plan view of Bingay Main deposit 滨盖主区矿床平面图

Resource area under review

在研究中的资源区

N

Recent coal discovery

近期发现煤

(Norwest, 2012)


Bingay resource

Bingay – Resource 滨盖资源

1495m米

海拔

滨盖小溪

1400m米

海拔

Coal bearing layer – open pit resource

含煤层 – 露采矿资源

Open pit wall?

露天矿壁

Moose Mountain sandstone ( 39 degree dip)

穆斯山沙岩层(39度倾斜)

1100m米

海拔

South 南

Underground Resource 地下资源

not to scale 不按比例

900m米

海拔


Mine production

Mine Production 矿山生产

Open pit life 15 years

露天矿生产年限15年

Underground mining until year 20

地采20年

Raw coal strip ratio approximately 5.5:1

原煤剥采比约为 5.5:1

Target 2 Million clean tonnes per year

目标为每年200万吨精煤

Potential coal on Bingay ABC, possibility of additional open pit mine increasing production

滨盖ABC储量潜力巨大,有可能再增加露天开采的产量


Bingay metallurgical coal project

Bingay – Coal Quality 滨盖 –煤质


Bingay metallurgical coal project

Bingay – Coal Quality滨盖 –煤质


Bingay ea update jan 2013 2013 1

Bingay EA update – Jan/2013滨盖环评最新情况 – 2013年/1月

  • A draft order under section 11 of the EA issued for Bingay in January

    环评11号令草案在1月发给滨盖项目

    • Canadian Environmental Assessment Agency determined that a federal environmental assessment is required.

      加拿大环评办公室确定了本项目需要联邦级别的环境评估。

    • During the pre application stage, Centermount have consulted with First Nations and develop a public consultation plan for the approval of the project16

      在预申请阶段,中山公司已经征求原著民意见,并且制定出公众意见征询计划

      以让本项目得到批准。

    • Scope of the proposed project and the assessment, application procedure, First Nation consultation procedures and Public consultation procedures are specified

      指定了拟定项目及评估、申请程序、原住民意见和公众意见征求的范围。


Operating cost

Operating Cost 运营成本

Approximately the same as Fording Coal

约和泰克福丁煤矿相同


Teck second quarter results for 2013 2013

TeckSecond Quarter Results for 2013泰克煤田2013年上半年报表


Development timetable

Development Timetable 开发时间表

Potential Mining Start in 2016 Q2

2016年第二季度投产


Highlight

Highlight (要点)

This presentation summarises current status at Centermount Coal Ltd.(“Centermount”) Bingay Project (the “Project”). The key parameters of the Project is shown in the following table.

此材料归纳了加拿大中山焦煤有限公司的滨盖主区冶金煤项目的现状。下表是项目的主要参数。

  • Project located at high productive coal field surrounded by 5 Teck coal fieldswith well equipped infrastructure

    项目位于高产煤区,附近有泰克5个煤田,基础设施完备。

  • Open pit life 15 years,target 2 million clean tonnes per year with potential more open pit coal production.

    露天矿开发至少15年,年产200万吨精煤,并有潜力未来增加露采年产量。

  • An extensive testing has shown that Bingay coking coal with high CSR can meet the coke quality requirement of the large size Blast Furnaces.

    全面测试表明滨盖主焦煤较高的CSR值能满足大型高炉对焦炭质量的需求。

  • Based on the current coking coal price and the cost of Teck Coal, the potential net profit is $50 per tonne

    基于现有的焦煤价格以及泰克的生产成本,潜在的净利润为每吨50加元。


Centermount coal ltd

Centermount Coal Ltd.加拿大中山焦煤有限公司

Office Suite 1385

1095 West Pender St.

Vancouver BC V6H 2N7

Sept. 2013年9月

Vancouver, Canada

Tel: 604-568-3388