Spreading Indirects. Spreading the Indirect Costs over the BOQ. This Candy facility allows you to manage the spread of Indirect Costs over bill items in a controlled manner.

Download Presentation

Spreading Indirects

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Spreading indirects

Spreading Indirects


Spreading indirects

Spreading the Indirect Costs over the BOQ

This Candy facility allows you to manage the spread of Indirect Costs over bill items in a controlled manner.

What has to be spread and where it is spread is set-up by the User early in the bid process and can be thoroughly tested beforehand. At finalisation the Indirects can be re-spread at the last minute with confidence.


Spreading indirects

How the Spreading works

There are a variety of ways to organise the spreading of the Indirects - this is controlled through named “Procedures”.

Each Procedure has one or many Indirect items assigned to it, the percentage of money contributed by these items and the target bill items over which they are to be spread.

The Procedures have no effect until the Indirect Spreading calculation is invoked by the User.


Spreading indirects

Where the Spreading goes

The Indirect spread amounts are recorded against each bill item.

This Spread amount is divided by the quantity to calculate a “Spread rate”. The Spread rate is added to the bill item’s Gross rate and stored as its Selling rate.

The User elects to use either the Bill or Final quantity to derive the Spread rate.


Spreading indirects

Types of Indirect Spreading

  • Three types of spreading are used:

    • Specific

    • Trade related

    • Balance

  • During the spreading calculation, the Specific and Trade related spreads are done first. Any amounts remaining against Indirect items are then spread proportionally over the entire bill, except for items that have been marked as “blocked” or have zero rates.


Spreading indirects

1. Specific Spreading

The Specific spreader takes the total amount of the Indirects allocated to a Procedure, modifies it by the percentage specified and spreads this amount over the target bill items in proportion to each bill item’s Gross amount.

Blocking a bill item does not stop it from receiving a Specific spread – these ignore a bill item’s Blocked status. Blocking is explained below.


Spreading indirects

2. Trade Related Spreading

The Trade Related spreader takes the total amount allocated to the Procedure, modifies it by the percentage specified and spreads it over all the target bill items of the specified Trade in proportion to each bill item’s Gross amount.

Blocking a bill item prevents it from receiving a Trade Related spread.


Spreading indirects

3. Spreading the Balance

After the Specific and Trade Related spreading, any unallocated Indirect amounts are spread over all the bill items in proportion to their Gross amounts – this Balance spread ensures that the entire Indirects are spread over the bill.

Blocked bill items are skipped in the Balance spreading process.


Spreading indirects

Blocking bill items

Any bill item can be marked as “blocked” and will only accept Specific spreads. Typically, PC sums would be blocked.

Items with zero quantity are not handled by the Indirects spreading process (a quantity is essential for calculating the Spread rate).

The spreading process will be aborted unless every zero quantity bill items has been Blocked by the User. The rates for these items is the responsibility of the User and he must enter the Selling rates manually.


Spreading indirects

Zero rated items

Zero rated items can be included in the Indirect spreading under the following conditions:

They cannot be included in a procedure with any rated items

If multiple zero rated items are in a procedure, the spread is divided equally, ie: two items get half each, three items get a third each, etc.

Zero rated bill items are ignored in the Balance spreading.


Spreading indirects

Other points….

Negative rated bill items become less negative by spreading.

The Price codes must be unique – this is because the Selling rates are manipulated for individual bill items.

The bill items and the Indirects must be marked-up prior to spreading.

If any Indirect item are found to be contributing more than 100% of their Gross amounts the spreading is aborted and a list of offending Indirect items is displayed.


Spreading indirects

Spreading Indirect Costs

The Indirect Costs

The Indirect Costs are accessed from the Estimating Document manager1.

Any of these documents can be used to select the IDC items to spread over the bill2.

1

2

2


Spreading indirects

Spreading Indirect Costs

The Indirect Costs

The Candy Indirect Cost are used to calculate overheads for an estimate and distribute these over time1.

The cost of each item is calculated using Price code worksheets as for bill items.

This is actually the intersection of the Candy pricing mechanisms and a SitePlan program. Items in the Indirects can be time related (red bars), fixed costs spread over time (blue bars).

1

2


Spreading indirects

Spreading Indirect Costs

The IDC Spreading documents

There are three primary documents used to manage the spreading of Indirect Cost items over the bill1 – these will be used in the following example.

1

2


Spreading indirects

Spreading Indirect Costs

Setting up procedures

Named procedures1 are created which spread groups of Indirect items over groups of bill items.

Each procedure has a list of source Indirect items2 and the percentage of their value to be spread3. The procedure must also have a list of bill items over which to spread the amount4.

The above amount is spread over the destination bill items in proportion to their Gross Amounts.

1

3

4

2

2


Spreading indirects

Spreading Indirect Costs

Setting up Procedures

Step 1: Make a Procedure by entering a descriptive name1.

Step 2: Select the Indirect items and drag them onto the Procedure2.

Step 3: Enter the percentage of the Indirect amounts to be spread by this Procedure3.

2

1

3

2

2


Spreading indirects

Spreading Indirect Costs

Define the Destination items

Step 4: Select the destination bill item(s) over which the Procedure’s Indirect items are to be spread. Drag these onto the Procedure1.

So what we have specified here is that 70% of the value of five Indirect items is to be spread over the one bill item.

This is termed a “specific” spread – one or more Indirect items targeted at one or more specific bill items.

1

2

2


Spreading indirects

Spreading Indirect Costs

View from the Indirects

Each Indirect item records the spread by keeping the name of the Procedure and the percentage of its amount that is contributed to the spread1.

The Indirect items have no knowledge about the destination of the spread – only the Procedure knows this.

1

2


Spreading indirects

Spreading Indirect Costs

View from the bill

The bill items record the contributing Procedures and amounts1.

In addition, the bill items record the type of spread used by a procedure2 – Specific, Trade and/or Balance. In this case the procedure was a Specific spread and is shown in the Specific spread column3.

3

1

1

2

2


Spreading indirects

Spreading Indirect Costs

Another Procedure

This example is made up of the running cost of the Batch plant1.

1

2


Spreading indirects

Spreading Indirect Costs

Trade Related spread

To spread the Batch plant procedure over the concrete items we select only the Concrete trade the bill items as the targets1.

1

2


Spreading indirects

Spreading Indirect Costs

Trade Related spread

The Concrete trade is marked as the destination for this spread1.

1

2


Spreading indirects

Spreading Indirect Costs

View from the Indirects

Again, each Indirect item records the spread by keeping the name of the Procedure and the percentage of its amount that it contributes to the spread1.

1

2


Spreading indirects

Spreading Indirect Costs

Trade Related spread

The batch plant running costs have been spread over all the concrete items in the bill - some bill items are shown here in the circle1. Note how they are displayed in the Trade spread column.

1

2


Spreading indirects

Spreading Indirect Costs

Spreading the balance

After the Specific and Trade related spreads have been done, any remaining amounts will be spread over the entire bill (except for Blocked items).

This Balancing spread is proportional to the spread already allocated to each item and displayed in the Balance column1.

1

2


Spreading indirects

Spreading Indirect Costs

1

2

3

4

The Spread splits

The Indirect spreads are displayed split into the three columns of Specific, Trade and Balance with a Total.

2


Spreading indirects

Spreading Indirect Costs

Calculating the Selling rate

The Gross amount1 and the Total Spread amount2 for each bill item are added to make a new Selling amount3. This amount is converted to the Selling rate by dividing by the Bill quantity.

Note: Any bill item receiving Indirect spread will have its Selling rate changed in the process. Items that are Blocked and have no Specific spread will be unchanged.

3

1

2

2


Spreading indirects

Spreading Indirect Costs

Blocking bill items

There are situations where particular bill items should not receive any Indirect spread. For example, PC sum items.

In this example, if we didn’t want the Wood float finish item to accept any burden from the Batch plant running costs, it could be marked as Blocked1.

This will prevent the Blocked item from Indirect spread from any Trade or Balancing spreads. However, Specific spreads would be accepted by a Blocked item. This allows you to put a specific amount against particular items.

2


Spreading indirects

Spreading Indirect Costs

Blocking bill items

Blocked items are marked with the word Blocked1.

Note how the Selling rate is the same as the Gross rate in Blocked items2.

The Procedure allocated to a Blocked item should be blank - displayed erroneously here.

2

2

1

2


Spreading indirects

Spreading Indirect Costs

Exceptions: Zero Quantity

Items with zero quantity are never included in the Indirects spread and must be marked as Blocked1.

Any zero quantity item that is not blocked will stop the spreading process and will be included in a list of items that must be dealt with.

1

2


Spreading indirects

Spreading Indirect Costs

Exceptions: Zero Rate

Items with a zero Rate will accept Specific spread but are automatically ignored by Trade and Balancing spreads.

If more than one zero rate item is in the target list of a procedure, the spread will be divided evenly amongst them For example, if there are three items they will each get one third of the spread amount.

If a zero rated item is mixed in with items with rates the spread will stop – zero rated items may not occupy a procedure which also has rated items.

1

2


Spreading indirects

Title

Use superscript numbers1 to refer to.

The End