802 11 march 2013 closing reports
This presentation is the property of its rightful owner.
Sponsored Links
1 / 101

802.11 March 2013 Closing Reports PowerPoint PPT Presentation


  • 162 Views
  • Uploaded on
  • Presentation posted in: General

802.11 March 2013 Closing Reports. Authors:. Date: 2013-03-22. Abstract. This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the March 2013 closing plenary meeting. Attendance Summary. Attendance Histogram (Thu). Type of Groups. Groups.

Download Presentation

802.11 March 2013 Closing Reports

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


802 11 march 2013 closing reports

802.11 March 2013 Closing Reports

Authors:

Date: 2013-03-22

Adrian Stephens, Intel Corporation


Abstract

Abstract

  • This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the March 2013 closing plenary meeting.

Adrian Stephens, Intel Corporation


Attendance summary

Attendance Summary

Adrian Stephens, Intel Corporation


Attendance histogram thu

Attendance Histogram (Thu)

Adrian Stephens, Intel Corporation


Type of groups

Type of Groups

Adrian Stephens, Intel Corporation


Groups

Groups

Adrian Stephens, Intel Corporation


802 11 wg editor s meeting mar 13

802.11 WG Editor’s Meeting (Mar ‘13)

Authors:

Date: 2013-03-10

Adrian Stephens, Intel Corporation

from slide 1/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)


Volunteer editor contacts

March 2013

Volunteer Editor Contacts

  • TGmc – Adrian Stephens – [email protected]

  • TGac – Robert Stacey – [email protected]

  • TGaf – Peter Ecclesine – [email protected]

  • TGah – Minyoung Park – [email protected]

  • TGai – Lee Armstrong– [email protected], Ping FANG [email protected]

  • TGaq – Dan Gal – [email protected]

  • Editors Emeritus:

    • TGaa – Alex Ashley – [email protected]

    • TGad – Carlos Cordeiro – [email protected]

    • TGae – Henry Ptasinski – [email protected]

Adrian Stephens, Intel Corporation

from slide 2/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)


802 11 style guide

802.11 Style Guide

  • See 11-09-1034-07-0000-wg11-style-guide.doc

    • We updated 802.11 WG Style Guide based on 2012 IEEE Standards Style Manual and consistency changes in final publication of the 802.11 standard

  • Editor’s responsibility includes checking the 2012 IEEE Standards Style Manual when creating or updating drafts. https://development.standards.ieee.org/myproject/Public/mytools/draft/styleman.pdf

  • Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual

  • Note that the Style Guide evolves with our practice

Adrian Stephens, Intel Corporation

from slide 3/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)


Editor amendment ordering

Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers!

Editor Amendment Ordering

  • Data as of Mar 2013

  • See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm

Adrian Stephens, Intel Corporation

from slide 4/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)


Draft development snapshot

Draft Development Snapshot

March 2013

Mar 2013

Most current doc shaded green.

Changes from last report shown in red.

Slide 11

Adrian Stephens, Intel Corporation

from slide 5/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)


Mib style visio and frame practices

MIB style, Visio and Frame practices

  • I’m going to suggest going forward we use a single style with appropriately set tabs,  and use leadingTabs to distinguish the syntax and description parts. (Adrian Stephens Feb 9, 2010)

  •  Keep embedded figures using visio as long as possible

    • Near the end of sponsor ballot,  turn these all into .wmf (windows meta file) format files (you can do this from visio using “save as”).   Keep separate files for the .vsd source and the .wmf file that is linked to from frame.

  • Frame templates for 11aa, 11ac, 11af

  • Text version of MIB is available (2012, ae2012, aa2012, ad2012)

Adrian Stephens, Intel Corporation

from slide 6/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)


March 2013 publicity

March 2013 Publicity

Authors:

Date: 2013-03-21

Adrian Stephens, Intel Corporation

from slide 1/2 of 11-13/0386r0 by Stephen McCann, RIM


802 11 march 2013 closing reports

  • HEW Press Release

    • Draft press release regarding the creation of a new High Efficiency WLAN (HEW) study group, based on the WNG SC presentations from Tuesday evening.

  • Mentor Copy

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0385-00-0000-high-efficiency-wlan-press-release.doc

Adrian Stephens, Intel Corporation

from slide 2/2 of 11-13/0386r0 by Stephen McCann, RIM


Closing report

Closing Report

Authors:

Date: 2013-03-22

Adrian Stephens, Intel Corporation

from slide 1/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)


Abstract1

Abstract

Closing report for WNG SC for March 2013, Orlando, Florida, USA

Adrian Stephens, Intel Corporation

from slide 2/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)


802 11 march 2013 closing reports

  • Presentations at March 2013 meeting

    • Agenda: https://mentor.ieee.org/802.11/dcn/13/11-13-0340-02-0wng-agenda-for-march-2013.ppt

  • Tuesday AM1 session

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0323-02-00ai-tgai-experimental-test-report-of-fils.pptx – Hiroshi MANO

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0314-00-0wng-on-future-enhancements-to-802-11-technology.pptx - JuhoPIRSKANEN

  • Tuesday PM3 (evening) session

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0313-00-0wng-usage-models-for-next-generation-wi-fi.pptx - Osama Aboul-Magd

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0343-00-0wng-operator-oriented-wi-fi.pptx – LIU Dapeng

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0309-00-0wng-next-gen-wlan.pptx – Ron PORAT

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0287-03-0wng-beyond-802-11ac-a-very-high-capacity-wlan.pptx - Yasuhiko INOUE

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0331-05-0wng-high-efficiency-wifi.ppt – Laurent CARIOU

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0339-10-0wng-high-efficiency-wlan-straw-poll.ppt - Laurent CARIOU

Adrian Stephens, Intel Corporation

from slide 3/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)


802 11 march 2013 closing reports

  • Straw poll during PM3 to indicate support for creation of a “High Efficiency WLAN” study group

    • Vote was (Y/N/A): 128/1/27

  • Attendance

    • AM1: ~126

    • PM3: ~165

  • Minutes

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0352-00-0wng-wng-meeting-minutes-orlando-mar2013.doc

  • Plans for May 2013

    • One 2-hour session

Adrian Stephens, Intel Corporation

from slide 4/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)


Arc closing report

ARC Closing Report

Authors:

Date: 2013-03-20

Adrian Stephens, Intel Corporation

from slide 1/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.


Abstract2

Abstract

This document is the closing report for ARC SC,

March 2013, Orlando meeting

Adrian Stephens, Intel Corporation

from slide 2/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.


Work completed

Work Completed

  • IETF/802 coordination

    • Reviewed RFC 4441 update. Trying to balance between redundant with CBPs versus enough information here.

    • Still open for comments – please get comments to Dorothy Stanley

    • Also, Operations Area working group has gotten submissions on CAPWAP, and will be considering.

  • Brief update on General Links (GLK SC) and 802.1 bridging discussions

    • Most presentations will be in Thursday AM1 joint session

    • Looks like changes are needed in 802.1AC, which will need a PAR

  • 802 Overview and Architecture Draft 1.6 sponsor ballot

    • Ballot deadline extended to Mar 22. Some comments addressed this week, more on telecons.

    • Reviewed 802.11 section (Annex B.2) and comments submitted. Noted that PLCP/PMD split is being removed from 802.11, so need to describe potential changes in our architecture pictures

Adrian Stephens, Intel Corporation

from slide 3/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.


Work completed cont

Work Completed (cont)

  • Architecture of APs/DS/Portals, and 802.1 concepts

    • Reviewed submission: https://mentor.ieee.org/802.11/dcn/13/11-13-0115-03-0arc-considerations-on-ap-architectural-models.doc

    • Agreed 802.11 Figure 5-1 (MAC data plane architecture) has issues and confusing parts. Started work toward a proposed replacement.

    • Need to get clarification on all (architectural) interface points within 802.11 specification – all MAC-SAPs (are there more than one?), etc.

      Minutes are in 11-13/0367r0

      Teleconferences:

    • None expected, if needed, will schedule with 10 days notice

Adrian Stephens, Intel Corporation

from slide 4/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.


March 2013 goals

March 2013 Goals

  • One meeting slot planned:

    • Continue discussion on architectural model for AP (and DS and Portal) and where MAC-SAP interface(s) appear, and how this relates to the 802.1 concepts

    • 802 O&A sponsor ballot, as appropriate

    • IETF/802 RFC 4441, as appropriate

Adrian Stephens, Intel Corporation

from slide 5/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.


Ieee 802 jtc1 sc closing report mar13

IEEE 802 JTC1 SC closing report (Mar13)

Authors:

Date: 2013-3-22

Adrian Stephens, Intel Corporation

from slide 1/15 of 11-13/0383r0 by Andrew Myles, Cisco


Abstract3

Abstract

Closing report for IEEE 802 JTC1 SCfor March13 in Orlando

Adrian Stephens, Intel Corporation

from slide 2/15 of 11-13/0383r0 by Andrew Myles, Cisco


Jtc1 sc focused on reporting on status updates prep ing for next sc6 meeting

JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting

  • Reviewed latest liaisons to SC6

    • 802.11ac D5.0 liaised

    • Responses to comments on 802.11-2012 liaised

  • Reviewed status of PSDO activity

    • Pre-ballots in SC6 on 802.1X & 802.1AE passed

      • 5 month ballot delayed until comments resolved

      • 11-13-336r5 on 802.1X, 11-13- 337r4 on 802.1AE will be considered by EC

    • Pre-ballots in SC6 on 802.11aa/ad/ae are still open

      • Close on 7 April

    • 802.3 WG will submit 802.3-2012 under PSDO

    • 802.1 WG will submit 802.1AS, 802.1AB, 802.1AR under PSDO

Adrian Stephens, Intel Corporation

from slide 3/15 of 11-13/0383r0 by Andrew Myles, Cisco


Jtc1 sc focused on reporting on status updates prep ing for next sc6 meeting1

JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting

  • Reviewed status of various China NB proposals in SC6

    • No known changes to status for :

      • WAPI

      • TEPA-AC

      • TLSec

      • TAAA

    • IETF are now tracking TISec and may send representative to next SC6 meeting

    • Nufrontwill present on EUHT and coexistence with 802.11 in March in Hawaii; possibly in SC?

Adrian Stephens, Intel Corporation

from slide 4/15 of 11-13/0383r0 by Andrew Myles, Cisco


Jtc1 sc focused on reporting on status updates prep ing for next sc6 meeting2

JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting

  • Prepared for next SC6 meeting in June in Korea

    • Reviewed agenda

    • Empowered Bruce Kraemer as HoD

    • Completed contribution process for SC6 NBs to “participate” in development & maintenance of 802 standards

      • 11-13-1454r8 will be will be considered by EC

      • Also discussed in 802.1 WG & 802.3 WG

    • Discussed a Swiss NB “explanatory report” on the SC6 resolutions from Graz

      • Further discussion and any action will occur in Hawaii

    • Discussed a response to Swiss NB comparison of 802.1X and TEPA-AC

      • Will be completed in Hawaii

Adrian Stephens, Intel Corporation

from slide 5/15 of 11-13/0383r0 by Andrew Myles, Cisco


Jtc1 sc have plans for may 13 in hawaii focused on prep for sc6 meeting

JTC1 SC have plans for May 13 in Hawaii focused on prep for SC6 meeting

  • Review status of liaisons to SC6

  • Review status of pre-ballots/ballots in SC6

    • 802.11aa/ad/ae, 802.1X/AE/AS/AB/AR, 802.3

  • Prepare for SC6 meeting in June

    • Review final agenda

    • Consider response to Swiss NB “explanatory report”

    • Complete response comparison of 802.1X &TEPA-AC

    • Update table of status of IEEE 802 contributed ISO/IEC documents

    • Develop status information about 802.1/3/11 for SC6

    • Liaise with IETF on TISec

  • Possibly host Nufront presentation on EUHT

Adrian Stephens, Intel Corporation

from slide 6/15 of 11-13/0383r0 by Andrew Myles, Cisco


Motions for ec

Motions for EC

Adrian Stephens, Intel Corporation

from slide 7/15 of 11-13/0383r0 by Andrew Myles, Cisco


The sc recommends empowerment of the ieee 802 hod to the next sc6 meeting

March 2013

The SC recommends empowerment of the IEEE 802 HoD to the next SC6 meeting

  • Motion from IEEE 802 JTC1 SC

    • The IEEE 802 JTC1 SC recommends that Bruce Kraemer be appointed as HoD of the IEEE 802 delegation to the SC6 meeting in June 2013 and be authorised to:

      • Appoint the IEEE 802 delegation

      • Approve any necessary submissions

      • Call any necessary preparation teleconferences

    • Result: 8/0/1

      • Abstain was Bruce Kraemer

Adrian Stephens, Intel Corporation

from slide 8/15 of 11-13/0383r0 by Mar 2013


The sc recommends empowerment of the ieee 802 hod to the next sc6 meeting1

March 2013

The SC recommends empowerment of the IEEE 802 HoD to the next SC6 meeting

  • Motion for consideration by IEEE 802 EC

    • The IEEE 802 SC appoints Bruce Kraemer as HoD of the IEEE 802 delegation to the SC6 meeting in June 2013 and authorises Mr Kraemer to:

      • Appoint the IEEE 802 delegation

      • Approve any necessary submissions

      • Call any necessary preparation teleconferences

    • Moved:

    • Seconded:

    • Result:

Adrian Stephens, Intel Corporation

from slide 9/15 of 11-13/0383r0 by Mar 2013


The sc recommends a response to sc6 s requests for collaboration

March 2013

The SC recommends a response to SC6’s requests for collaboration

  • Motion from IEEE 802 JTC1 SC

    • The IEEE 802 JTC1 SC recommends that 11-13-1454r8 be approved as a response to the ISO/IEC JTC1/SC6 requests that IEEE 802:

      • Establish a mechanism that allows SC6 NBs to contribute to the revision process in IEEE 802.1/3/11

      • Exchange information with SC6 about new work items that are within the scope of SC6 and the respective IEEE 802 WG for information and potential coordination

    • Result: 9/0/0

Adrian Stephens, Intel Corporation

from slide 10/15 of 11-13/0383r0 by Mar 2013


The sc recommends a response to sc6 s requests for collaboration1

March 2013

The SC recommends a response to SC6’s requests for collaboration

  • Motion for consideration by IEEE 802 EC

    • The IEEE 802 EC approves 11-13-1454r8 as a response to the ISO/IEC JTC1/SC6 requests that IEEE 802:

      • Establish a mechanism that allows SC6 NBs to contribute to the revision process in IEEE 802.1/3/11

      • Exchange information with SC6 about new work items that are within the scope of SC6 and the respective IEEE 802 WG for information and potential coordination

    • Moved:

    • Seconded:

    • Result:

Adrian Stephens, Intel Corporation

from slide 11/15 of 11-13/0383r0 by Mar 2013


The sc recommends approving the responses related to the 802 1x pre ballot

March 2013

The SC recommends approving the responses related to the 802.1X pre-ballot

  • Motion from IEEE 802 JTC1 SC

    • The IEEE 802 JTC1 SC recommends that the responses in 11-13-336r5to the comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1X under the PSDO process be approved and liaised to ISO/IEC JTC1/SC6

    • Result: 9/0/0

Adrian Stephens, Intel Corporation

from slide 12/15 of 11-13/0383r0 by Mar 2013


The sc recommends approving the responses related to the 802 1x pre ballot1

March 2013

The SC recommends approving the responses related to the 802.1X pre-ballot

  • Motion for consideration by IEEE 802 EC

    • The IEEE 802 EC approves the responses in 11-13-336r5to the comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1X approves their liaising to ISO/IEC JTC1/SC6

    • Moved:

    • Seconded:

    • Result:

Adrian Stephens, Intel Corporation

from slide 13/15 of 11-13/0383r0 by Mar 2013


The sc recommends approving the responses related to the 802 1ae pre ballot

March 2013

The SC recommends approving the responses related to the 802.1AE pre-ballot

  • Motion from IEEE 802 JTC1 SC

    • The IEEE 802 JTC1 SC recommends that the responses in 11-13-337r4 to the comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1AE under the PSDO process be approved and liaised to ISO/IEC JTC1/SC6

    • Result: 9/0/0

Adrian Stephens, Intel Corporation

from slide 14/15 of 11-13/0383r0 by Mar 2013


The sc recommends approving the responses related to the 802 1ae pre ballot1

March 2013

The SC recommends approving the responses related to the 802.1AE pre-ballot

  • Motion for consideration by IEEE 802 EC

    • The IEEE 802 EC approves the responses in 11-13-337r4to the comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1AE approves their liaising to ISO/IEC JTC1/SC6

    • Moved:

    • Seconded:

    • Result:

Adrian Stephens, Intel Corporation

from slide 15/15 of 11-13/0383r0 by Mar 2013


Ieee 802 11 regulatory sc orlando closing report

IEEE 802.11 Regulatory SCOrlando Closing Report

Date: 2013-03-22

Authors:

Adrian Stephens, Intel Corporation

from slide 1/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry


Abstract4

Abstract

This presentation is the closing report for the March 2013 IEEE 802.11 Regulatory Standing Committee meeting in Orlando.

Adrian Stephens, Intel Corporation

from slide 2/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry


Agenda

Agenda

  • The regulatory summaries

  • Action items and issues

  • WP5A liaison from IEEE 802 on 5 GHz

  • The NPRM FCC 13-22

  • Transmit beamforming antenna gain presentations

  • Adjourn

Adrian Stephens, Intel Corporation

from slide 3/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry


Accomplishments

Accomplishments

  • Approved Vancouver meeting and teleconference minutes

  • Heard regulatory update summaries for North America, the EU and Asia

  • Approved a liaison to ITU-R WP5A on expansion of the 5 GHz spectrum

  • Heard two presentations on transmit beamforming antenna gain (relating to a TCB test document for multiple antennas)

  • Developed and approved a framework document for the development of Comments for NPRM FCC 13-22 (proceeding 13-49)

  • Planned for teleconferences

    • Thursdays, at 12:30ET for 90 minutes (starting April 4th)

Adrian Stephens, Intel Corporation

from slide 4/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry


Teleconferences

Teleconferences

  • Weekly on Thursdays, 12:30 to 14:00 ET

    • Starting April 4th

Adrian Stephens, Intel Corporation

from slide 5/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry


References

References

  • NPRM FCC 12-118

  • NPRM FCC 12-148

  • NPRM FCC 13-22

  • FCC request for comment on WRC-15

  • FCC authorization of TVWS databases nationwide

  • Early draft of EN301 598 (v0.0.16)

  • Technical feasibility of IMT in the bands above 6 GHz

  • RECOMMENDATION ITU-R F.1763

  • RECOMMENDATION ITU-R M.1651

  • WP5A liaison re M.1651

  • IEEE 802.11 liaison to ITU-R WP5A on expansion of the 5 GHz band

  • Industry outline for NPRM FCC 13-22 response

  • NPRM FCC 13-22 Dissected

  • FCC 13-22 Comment Framework

  • Transmit Beamforming Antenna Gain

  • Beamfoming Array Gain to Intended and Unintended Users

Adrian Stephens, Intel Corporation

from slide 6/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry


Ieee 802 11mc closing report for march 2013

IEEE 802.11mc Closing Report forMarch 2013

Authors:

Date: 2013-03-21

Adrian Stephens, Intel Corporation

from slide 1/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)


Abstract5

Abstract

This document contains the TGmc closing report for March 2013.

Adrian Stephens, Intel Corporation

from slide 2/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)


Status comment resolution

Status: comment resolution

  • Continued processing comments received in the recent Initial Letter Ballot

    • 801 comments (713 LB, 88 remaining 2012 Call for comments)

    • Approved resolutions to approximately 350 comments

Adrian Stephens, Intel Corporation

from slide 3/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)


Tgmc plan of record

TGmc Plan of Record

20 July 2012 – 12 Sept 2012 – Call for Comment/Input

29-30 Aug 2012 – NesCom, SASB PAR Approval

Sept 2012 – Begin to process input

Sept 2012 – 11aa, 11ae integration

Jan – First WG Letter ballot - without 11ad

Dec 2012 – March/May 2013 – 11ad integration – May/July ballot on D2.0

Dec 2013 – March 2014 – 11ac integration

Feb 2014 – Mandatory Draft Review

Feb-March 2014 – Form Sponsor Pool (45 days)

April/May 2014 – Initial Sponsor Ballot

TBD – integration of additional completed amendments (e.g. 11af)

Nov 2014 – WG/EC Final Approval

March 2015 – RevCom/SASB Approval

Slide 48

Adrian Stephens, Intel Corporation

from slide 4/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)


Teleconferences1

Teleconferences

  • Conference Calls 10am Eastern (2 hours)

    • April 5, 12, 19, 26 (Friday)

Adrian Stephens, Intel Corporation

from slide 5/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)


Next steps

Next Steps

  • Continued Comment Resolution

  • Recirculation Letter ballot (expect July)

Adrian Stephens, Intel Corporation

from slide 6/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)


Tgac march 2013 closing report

TGac March 2013 Closing Report

Authors:

Date: 2013-03-20

Adrian Stephens, Intel Corporation

from slide 1/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)


Abstract6

Abstract

This document is the closing report for the TGac for the March 2013 session.

Adrian Stephens, Intel Corporation

from slide 2/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)


Work completed1

Work Completed

  • Approved resolutions to comments received on draft D5.0 (LB 191).

    • Comment spreadsheet is available at: https://mentor.ieee.org/802.11/dcn/13/11-13-0199-03-00ac-lb191-comments-tgac-d5-0.xls

  • A motion passed to start a 15-day recirculation ballot on draft D5.0.

  • Reviewed and approved the report to the IEEE 802 EC requesting conditional approval for Sponsor ballot.

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0320-01-00ac-p802-11ac-report-to-ec-on-conditional-approval-to-go-to-sponsor-ballot.pptx

Adrian Stephens, Intel Corporation

from slide 3/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)


Next ad hoc meeting

Next Ad Hoc Meeting

  • None scheduled for May 2013.

  • A motion passed to authorize an ad hoc meeting in July 2013, somewhere in Europe.

Adrian Stephens, Intel Corporation

from slide 4/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)


May 2013 goals

May 2013 Goals

  • Start working on Sponsor Ballot comment resolution

Adrian Stephens, Intel Corporation

from slide 5/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)


Conference call times

Conference Call Times

  • Previously Approved

    • March 28 - 20:00 - 22:00 ET

    • April 4 - 10:00 - 12:00 ET

    • Not needed since the dates coincide with ballots

  • May 09 – 20:00 – 22:00 ET

  • May 23 - 10:00 – 12:00 ET

  • May 30 - 20:00 – 22:00 ET

Adrian Stephens, Intel Corporation

from slide 6/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)


Tgaf orlando closing report

TGaf Orlando Closing Report

Date: 2013-03-22

Authors:

Adrian Stephens, Intel Corporation

from slide 1/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry


Abstract7

Abstract

This presentation is the closing report for the 19th face-to-face meeting of IEEE 802.11 TGaf, taking place the week of January 14th, 2013 at the IEEE 802 Wireless Interim in Vancouver.

Adrian Stephens, Intel Corporation

from slide 2/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry


Plan for the week

Plan for the Week

  • Approve meeting and teleconference minutes

  • Regulatory update

  • Review the results of LB192

  • Review of the progress since January

  • Editorial review; spreadsheet 11-12/1017r35

  • Review and Approve all comment resolution submissions

  • Update the draft and comment resolution spreadsheet with approved changes, and request a recirculation letter ballot

  • Plan for May meeting and teleconferences

Adrian Stephens, Intel Corporation

from slide 3/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry


Tgaf accomplishments

TGaf Accomplishments

  • Reviewed the comment spreadsheet and resolved all of the remaining comments from LB192

  • Requested the Editor to prepare D4.0 and the asked WG to start a recirculation letter ballot

  • Planned for May meeting, and weekly teleconferences

    • Tuesdays at 21:00 ET for 2 hours

Adrian Stephens, Intel Corporation

from slide 4/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry


Plan for may

Plan for May

  • Approve Orlando and Teleconference minutes

  • Review and resolve comments from the recirculation letter ballot on Draft 4.0

  • Ask the WG for a recirculation letter ballot

  • Prepare PAR extension request

  • Plan for July and Teleconferences, and begin the process of starting the first TGaf Sponsor ballot

Adrian Stephens, Intel Corporation

from slide 5/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry


Tgaf timeline affirmed march 2013

TGaf Timeline – Affirmed March 2013

  • Initial Working Group Letter Ballot: January 2011

  • Second Working Group Letter Ballot: July 2012

  • Recirculation Letter Ballot: January 2013

  • Form Sponsor Ballot Pool: June 2013

  • Initial Sponsor Ballot: July 2013

  • Recirculate Sponsor Ballot: November 2013

  • Final WG/EC Approval: March 2014

  • RevCom/Standards Board Approval: June 2014

Adrian Stephens, Intel Corporation

from slide 6/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry


Teleconferences2

Teleconferences

  • Weekly on Tuesdays through May 28th

    • Until recirc is complete, calls will be used for regulatory updates as required

  • Time: 21:00 ET for up to 2 hours

Adrian Stephens, Intel Corporation

from slide 7/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry


Motion

Motion

  • Having approved comment resolutions for all of the comments received from LB192 on TGaf D3.0 as contained in document 11-12/1017r37

  • Instruct the editor to prepare Draft 4.0 incorporating these resolutions and,

  • Approve a 15 day Working Group Recirculation Ballot, asking the question “Should P802.11af D3.0 be forwarded to Sponsor Ballot?”

  • Moved by Rich Kennedy on behalf of TGaf

  • Second:

  • Discussion?

  • Results:

  • TGaf vote:

  • Moved: Al Petrick Seconded: Tevfik Yucek Result: 14-0-0

Adrian Stephens, Intel Corporation

from slide 8/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry


Ieee 802 11ah closing report for march 2013

IEEE 802.11ah Closing Report forMarch 2013

Authors:

Date: 2013-3-20

Adrian Stephens, Intel Corporation

from slide 1/5 of 11-13/0359r0 by David Halasz


Activity in tgah

Activity in TGah

  • Work continued on specification framework

    • Update to the spec framework adopted

    • 11-11-1137-14-00ah-specification-framework-for-tgah.docx

  • Timeline move out two months

    • Draft text not available beyond 12/1257. Hence internal task group letter ballot move out to May of 2013.

Adrian Stephens, Intel Corporation

from slide 2/5 of 11-13/0359r0 by David Halasz


Going forward

Going forward

  • Wrap up on specification framework

  • Move forward with draft text.

  • Start internal task group letter ballot

Adrian Stephens, Intel Corporation

from slide 3/5 of 11-13/0359r0 by David Halasz


Teleconference

Teleconference

  • May 8 at 10 AM ET 1 hour

    • Prepare for May face-to-face meeting

Adrian Stephens, Intel Corporation

from slide 4/5 of 11-13/0359r0 by David Halasz


Timeline move out two months

Timeline – Move out two months

  • Current

    • Internal Task Group Ballot : May 2013

    • Initial Letter Ballot : September 2013

    • Initial Sponsor Ballot : March 2015

    • EC Approval : January 2016

    • Revcom Approval : March 2016

Adrian Stephens, Intel Corporation

from slide 5/5 of 11-13/0359r0 by David Halasz


Ieee 802 11tgai closing report

March 2013

IEEE 802.11TGaiClosing Report

Date: 2013-3-21

Authors:

Adrian Stephens, Intel Corporation

from slide 1/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)


Abstract8

March 2013

Abstract

This presentation is the closing report for the Orlando meeting of the IEEE 802.11 TGai.

Adrian Stephens, Intel Corporation

from slide 2/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)


Ieee 802 11 fils tgai orland march 2013

March 2013

IEEE 802.11 FILS TGai – Orland March 2013

  • Goals for the Meeting:

    • Approve minutes of past meeting and teleconference

    • Comment resolution to volunteer review comments

    • Approve final technical contribution

    • Move to forward TGai call for comment

    • Joint meeting with TGaq

    • Approve Timeline

    • Approve Teleconference schedule

    • Approve Plan for May

Adrian Stephens, Intel Corporation

from slide 3/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)


Accomplishments tgai 1 2

March 2013

Accomplishments TGai 1/2

  • Review and approve January 2013 Vancouver Session Minutes

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0182-01-00ai-january-2013-vancouver-session-minutes.doc

  • Review and approve January-March Teleconference Minutes

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0191-04-00ai-january-march-teleconference-minutes.doc

Adrian Stephens, Intel Corporation

from slide 4/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)


Accomplishments tgai 2 2

March 2013

Accomplishments TGai 2/2

  • 8 regular slots and 1 Joint adhoc with TGaq were held.

  • Experimental-test-report-of-FILS was reported on adhoc.

  • 63 unsolved open technical before this session.

  • All comments were resolved.

  • 21 Technical motions ( 20 passed/ 1 failed)

  • Instructed editor to prepare draft 0.5 and incorporating these resolutions and, approve 20 day peer review starting on/or after April 8th , 2013 to assist with producing an improved draft for working LB.

Adrian Stephens, Intel Corporation

from slide 5/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)


Plan for may1

March 2013

Plan for May

  • Goals for the Meeting:

    • Approve minutes of past meeting and teleconference

    • Comment resolution of Task Group review of TGai draft.

    • Approve Timeline

    • Approve Teleconference schedule

    • Approve Plan for July

Adrian Stephens, Intel Corporation

from slide 6/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)


Time line of tgai no change

March 2013

Time line of TGai(no change)

PAR Approved, Modified, or Extended 2010-12-08

  • WG Letter Ballots Initial / RecircJul 13/ Nov13

  • Form Sponsor Ballot Pool / Reform Mar14

  • MEC DoneMar 14

  • IEEE-SA Sponsor Ballots Initial / Recirc Jul14/ Sep14

  • Final 802.11 WG Approval Nov14

  • final or Conditional 802 EC Approval Nov14

  • RevCom & Standards Board Final or Continuous Process Approval Feb15

  • ANSI ApprovedN/A

Adrian Stephens, Intel Corporation

from slide 7/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)


Teleconference schedule

March 2013

Teleconference Schedule

  • Motion:

    • Approve the following schedule of weekly teleconferences.

    • Tuesdays 10:00 ET from 26th March 2013 until 21st May 2013.

    • Duration 1Hour

    • Using WEB-EX that will be provided by Task Group Chair

  • Approved by unanimous consent

Adrian Stephens, Intel Corporation

from slide 8/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)


Reference

March 2013

Reference

  • Agenda /13-0321r2

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0321-02-00ai-tgai-agenda-march-2013-orland.pptx

  • Submission list / 13-0322r3

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0322-03-00ai-tgai-submission-list-orlando.xls

  • Motions / 13-0341r1

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0341-00-00ai-tgai-motion-straw-poll-march-2013-orlando.pptx

  • TGai Draft Review Combined Comments 13-0036r14

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0036-14-00ai-tgai-draft-review-combined-comments.xls

  • Experimental-test-report-of-FILS /13-0323r2

    • https://mentor.ieee.org/802.11/dcn/13/11-13-0323-02-00ai-tgai-experimental-test-report-of-fils.pptx

Adrian Stephens, Intel Corporation

from slide 9/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)


Thanks to all who participated

March 2013

Thanks to all who participated!

Adrian Stephens, Intel Corporation

from slide 10/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)


802 11 march 2013 closing reports

TGaj March 2013 Closing Report

Date: 2013-03-21

Authors:

Adrian Stephens, Intel Corporation

from slide 1/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation


Work completed2

March 2013

Work Completed

  • Task Group documents reviewed:

    • Usage model, 12/1245r2, Jiamin Chen

  • Submissions

    • 13/292r0, Backward compatibility of 11aj with 11ad, Carlos Cordeiro

    • 13/0177r1, Proposal of RoF Extension Link Backhaul for Category 4, Hiroyo Ogawa

Adrian Stephens, Intel Corporation

from slide 2/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation


Goals for april

March 2013

Goals for April

  • Target to approve TG Usage model, Functional Requirement, Evaluation Methodology, Selection Procedure baseline document

  • Continue to develop channel model for 45GHz

Adrian Stephens, Intel Corporation

from slide 3/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation


Conference call times1

March 2013

Conference call times

  • April 18th 19:00-20:00 ET

Adrian Stephens, Intel Corporation

from slide 4/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation


Tgak march closing report

TGak March Closing Report

Authors:

  • Date:2013-03-21

Adrian Stephens, Intel Corporation

from slide 1/5 of 11-13/0374r0 by Donald Eastlake, Huawei


Abstract9

Abstract

  • Closing Report of IEEE 802.11 Task Group AK at the 802.11 Working Group Meeting, March 2013, in Orlando, Florida.

Adrian Stephens, Intel Corporation

from slide 2/5 of 11-13/0374r0 by Donald Eastlake, Huawei


Tgak closing report

TGak Closing Report

  • Accomplishments

    • Received and discussed 4 submissions (see list next page)

    • Met jointly with 802.1 Thursday morning.

    • The minutes of this TGak meeting will be in 11-13/375 and an annotated agenda is in 11-13/0273r5.

  • Teleconferences

    • TGak voted to hold 1 hour teleconferences on Mondays, April 8th, April 22nd, and May 6th, at 5pm Eastern US time joint with 802.1Qbz.

Adrian Stephens, Intel Corporation

from slide 3/5 of 11-13/0374r0 by Donald Eastlake, Huawei


Tgak closing report1

TGak Closing Report

  • Presentations

    • 11-13/0183r0, “Proposal of Preliminary Functional Requirements for 802.1Qbz-802.11ak”, Mitsuru Iwaoka (Yokogawa Electric Co.)

    • 11-13/185r1, “Problems to be solved by 802.11ak/802.1Qbz”, Donald Eastlake (Huawei Technologies)

    • 11-13/221r2, “802.11 QoS Queue Architecture and Possible 802.1bz Bridge Model”, Philippe Klein (Broadcom)

    • 11-13/0253r0, “Changes to 802.1Q required by 802.1Qbz”, Norm Finn (Cisco)

Adrian Stephens, Intel Corporation

from slide 4/5 of 11-13/0374r0 by Donald Eastlake, Huawei


Tgak closing report2

TGak Closing Report

  • May Plans

    • Develop a firm list of Problems to be solved by this effort.

    • Develop an architectural model for 802.11ak.

    • Receive and discuss technical presentations

    • Develop process and timeline for TGak

Adrian Stephens, Intel Corporation

from slide 5/5 of 11-13/0374r0 by Donald Eastlake, Huawei


Tgaq closing report

TGaq Closing Report

Authors:

Date: 2013-03-22

Adrian Stephens, Intel Corporation

from slide 1/3 of 11-13/0370r1 by Stephen McCann, RIM


Abstract10

Abstract

Closing report for TGaq (Pre-Association Discovery) for March 2013, Orlando, FL, USA

Adrian Stephens, Intel Corporation

from slide 2/3 of 11-13/0370r1 by Stephen McCann, RIM


802 11 march 2013 closing reports

  • Summary

    • Use case

      • 11-13-0125-04-00aq-use-case-analysis.docx

      • Use case collection now closed

    • Requirements and terminology documents

      • 11-13-0299-00-00aq-draft-tgaq-terminology.docx

    • Initial protocol design discussion

      • 11-13-0057-02-00aq-design-options.ppt

    • Detailed scoping discussion

    • Teleconference : Monday 22nd April 10:00 ET

  • Plans for May 2013

    • Initial technical presentations

Adrian Stephens, Intel Corporation

from slide 3/3 of 11-13/0370r1 by Stephen McCann, RIM


Rr tag 802 18 to 802 11 liaison report

RR-TAG (802.18) to 802.11 Liaison Report

Date: 2013-03-22

Authors:

Adrian Stephens, Intel Corporation

from slide 1/5 of 11-13/0376r0 by Rich Kennedy, BlackBerry


Abstract11

Abstract

This presentation is the liaison report from the RR-TAG for the March 2013 IEEE 802.11 Plenary in Orlando.

Adrian Stephens, Intel Corporation

from slide 2/5 of 11-13/0376r0 by Rich Kennedy, BlackBerry


Fcc documents reviewed and approved by the rr tag

FCC Documents Reviewed and Approved by the RR-TAG

  • There were no documents approved for submission to the FCC at this meeting.

  • The RR-TAG expects to finalize and approve comments to the FCC 5 GHz U-NII Band Rules Revision NRPM at a teleconference meeting to be held on on Friday April 19th, at 1:00 PM ET.

    • Link to NPRM: 18-13/016r0

Adrian Stephens, Intel Corporation

from slide 3/5 of 11-13/0376r0 by John Notor, Notor Research


Itu r documents from 802 16 and 802 11 reg sc reviewed and approved by the rr tag

ITU-R Documents from 802.16 and 802.11 REG SC Reviewed and Approved by the RR-TAG

  • The RR-TAG approved the following documents from 802.16 for EC review and submission to ITU-R WP 5D:

    • 18-13/034r1, Proposed LS to ITU-R WP 5D: Update toward Rec. ITU-R M.1457-12 (Meeting X Notification) Link: 18-13/034r1

    • 18-13/035r1, Proposed Cont. to ITU-R WP 5D- Update of WirelessMAN-Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+2) Link: 18-13/035r2

  • The RR-TAG approved the following document from the 802.11 Regulatory Standing Committee for EC review and submission as an IEEE 802 document to ITU-R WP 5A:

    • 18-13/038r3, IEEE 802 Input to WP5A on 5 GHz Link: 18-13/038r3

Adrian Stephens, Intel Corporation

from slide 4/5 of 11-13/0376r0 by John Notor, Notor Research


Other documents reviewed and approved by the rr tag

Other Documents Reviewed and Approved by the RR-TAG

  • The RR-TAG approved the following document from 802.16 for EC review and submission to IETF, copy to the FCC:

    • 18-13/036r0, Proposed Statement to IETF LMAP on IEEE P802.16.3 Activity Link: 18-13/036r0

  • The RR-TAG approved the following document from 802.16 for EC review and submission to the Broadband Forum, copy to the FCC:

    • 18-13/037r1 Proposed statement to BBF: Response to liaison of 8 March on Performance Measurements Architecture Link: 18-13/037r1

Adrian Stephens, Intel Corporation

from slide 5/5 of 11-13/0376r0 by John Notor, Notor Research


Liaison report for omniran ec sg

Liaison Report for OmniRAN EC SG

Authors:

Date: 2013-03-22

Adrian Stephens, Intel Corporation

from slide 1/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion


Abstract12

Abstract

This presentation contains the March 2013 IEEE 802.11 liaison report for OmniRAN EC SG.

Adrian Stephens, Intel Corporation

from slide 2/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion


Key activities

Key Activities

  • Currently focused on defining the problem statement and scope, leading to the creation of a PAR and 5C.

  • Review of feedback from presentations to IETF, IEEE 802.1, and EC.

  • Review OmniRAN use case proposals

  • Discussion with IEEE 802.21 on the scope of OmniRAN relative to the scope of IEEE 802.21

  • Liaison to 3GPP to obtain clarification on some technical aspects of SAMOG (3GPP TS 23.402)

  • Request for PAR extension.

Adrian Stephens, Intel Corporation

from slide 3/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion


Objectives for may

Objectives for May

  • Teleconferences: April 11th, May 2ndat 9am – details on OmniRAN SG website

  • Incorporate proposed use cases into an OmniRAN use case document

  • Develop PAR submission documents– Target PAR submission on Jun 15

Adrian Stephens, Intel Corporation

from slide 4/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion


References1

References

  • OmniRAN website

    • http://www.ieee802.org/OmniRANsg/

  • Document repository for OmniRAN:

    • https://mentor.ieee.org/omniran/documents

  • Link to March 2013 OmniRAN Agenda:

    • https://mentor.ieee.org/omniran/dcn/13/omniran-13-0014-03-ecsg-march-2013-orlando-agenda.pptx

Adrian Stephens, Intel Corporation

from slide 5/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion


  • Login