1 / 26

507-D Pre Implementation Report

507-D Pre Implementation Report. Water and Sanitation for Hope Integrated Academy Mulobere, Uganda. March 24th, 2008. University of Minnesota Chapter. Introduction. Location – rural village 40 km south of Masaka, Uganda Community of 2000 where 19% of the children are orphans

Download Presentation

507-D Pre Implementation Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 507-D Pre Implementation Report Water and Sanitation for Hope Integrated Academy Mulobere, Uganda March 24th, 2008 University of Minnesota Chapter

  2. Introduction • Location – rural village 40 km south of Masaka, Uganda • Community of 2000 where 19% of the children are orphans • Partnership – Uganda Rural Fund • All volunteer 501(c)3 non profit started in 2005 to provide education and support for disadvantaged children, AIDs orphans, and marginalized communities throughout Uganda

  3. The School • Uganda Rural Fund is building the Hope Integrated Academy • This school is designed to provide young people and adults with education and technical skills as a primary school, vocational school, community library, community center; and health clinic • Currently a after school program for 200 children • Future development will provide housing for 300 AIDS orphans and teach 200 children and adults from the community for a total of 500 students.

  4. Current and Future Layout Buildings Currently On Property

  5. The Need • Nearby water sources are turbid contain bacteria and fluctuate with the season. • School must have a clean sustainable water source for both students and staff • School currently uses two pit latrines which are neither sustainable or hygienic • The school will need a more hygienic and sustainable sanitation system

  6. The solution • Rainwater harvesting to provide water for the after school students and staff • Ecological sanitation system with dry composting to provide a sustainable and hygenic solution • Assessment of possible deep well groundwater source with the expansion of the school

  7. Why Rainwater System ? • Meeting with Government water agency during assessment revealed a 20% success rate for finding groundwater with know hydrogeology. • The active shallow well near the school dries up during the dry season • A deep well would be required costing $12,000 with less than 20% success rate • School is currently only in use for after school program • Need a reliable water source • Future expansion could include a well

  8. Water Storage • Capacity for next two years – 250 after school children • Usage – 5 L/day • Size estimate 100,000 L Table 2: Tank storage calculations

  9. Storage Tanks

  10. Gutter System

  11. Gutter Attachments • Attach fascia to roof structure. • Attach gutters to fascia

  12. Primary Water Treatment • Screens on gutters for large particle removal • First Flush system at all down spouts for initial cleaning of roof surface. • Divert 7.6 L per 9.6 m2 • Using 6’ PVC pipe = 1.75 m of pipe. • During tests if floating system fails system without a plug will be used

  13. Secondary Water Treatment • Common practice in Uganda is to boil all water • Other treatments include rapid sand filtration, slow sand filtration, SODIS, porous clay filter, UV, and chlorination • Possibilities • Inline chlorination • UV treatment • Still trying to locate chlorination tablets or UV bulbs in country

  14. System overview

  15. Sanitation Ecological Dehydrating Toilets via urine-diversion

  16. System Components • Elevated masonry structure • Urine diverting toilets and urinals • Solid waste temporary collection below toilets • Solid waste long-term storage in rear • Movable collection containers • Solid waste dehydrating/reuse with addition of ash • Vent pipes for air flow • Septic tank/filter and leaching field • Rainwater collection and hand washing station • Composting education, hygiene education

  17. System Design: Solid Waste • 250 day students users, 15 live in teachers • Density of feces: 1000kg/m3 (assumed fully saturated at all times)

  18. System Design: Solid Waste Handling

  19. System Design: Liquid Waste and Waste Application Trench Sizing Calculations: 320 L = 85 gallons 85 gal * 4.2 ft2 (0.39 m2) trench bottom/gal * 0.6 (depth reduction factor) = 215 ft2 = 20 m2 215 ft2 / 3 ft wide = 72 ft long = 24 m

  20. System Design: Storage and Rain Collection • Storage Area Sizing • 1. To the storage area required, add an extra 40% for maneuvering. • 2. 43 containers * 0.3025 m2/container area = 13.0 m2 • 3. 13.0 m2 * 140% = 18.2 m2 needed for total storage area • 4. There is room for 2 containers in each collection area allowing interior storage so 3.63 m2 inside total; thus, exterior storage area must be 18.2 m2 – 3.63 m2 =14.6 m2 • 5. For school growth and safety factor, use 2 times more = 14.6 m2 x 2 m2 = 29.2 m2 • 6. Resulting storage area (dimensions: 8 m wide x 4 m deep) = 32 m2 > 29.2 m2 • (Note: Width includes roof over hand washing area) • (Note: Controlling factor collection area size was space needed to use each toilet) • Rainwater Collection • 1. Horizontal roof area = 44 m2 • 2. Seasonal collection volume = 0.5 m rain/season * 44 m2= 22 m3 volume possible • 3. Tank size = 10,000 L (polytank or Ferro cement tank) = 10 m3 (and 10000 kg) • 4. Water per person per day = 20 m3/year*1 year/365 days * 1 day/265 daily users = .21 L /day per user • 5. If have 20,000 L storage, allows 0.42 L/day per user

  21. Sanitation System Reflection • Benefits • Prevents disease • Protects environment • Minimizes Odor • Maintainable and Convenient • Returns nutrients to Earth • 250 Children, 15 Adults • Potential Concerns - Solutions • Cultural acceptance of waste reuse – Education/Provision of benefits • Misuse of diversion toilet - Education/Provision of benefits • Undesirability of handling feces - Education/Provision of benefits • Supply of Ash – Children bring from home, school provides • Overuse of system – Removable containers allow flexibility in number of users • Post-dehydrating handling options – burying, burning, agricultural use

  22. Rainwater Budget

  23. Sanitation Budget

  24. Total Budget and Future Work • Total cost = 24,900 • Assessment for future work • Groundwater well • Get hydrogeology of area complete • Secondary treatment • Locate possible UV light bulbs or chlorination tablets