ITU-D Regional Development Forum
This presentation is the property of its rightful owner.
Sponsored Links
1 / 24

Session 8 Case study on Economic impact of Broadband Implementation PowerPoint PPT Presentation


  • 131 Views
  • Uploaded on
  • Presentation posted in: General

ITU-D Regional Development Forum for the EUR and CIS Region: “NGN and Broadband, Opportunities and Challenges”. Session 8 Case study on Economic impact of Broadband Implementation. Ignat Stanev ITC, Bulgaria. Content of the presentation :. Used for the case study planning tools  

Download Presentation

Session 8 Case study on Economic impact of Broadband Implementation

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Session 8 case study on economic impact of broadband implementation

ITU-D Regional Development Forum

for the EUR and CIS Region:“NGN and Broadband, Opportunities and Challenges”

Session 8

Case study on Economic impact of Broadband Implementation

Ignat Stanev

ITC, Bulgaria


Session 8 case study on economic impact of broadband implementation

Content of the presentation :

  • Used for the case study planning tools  

  • Problem 1 – Economic Impact of Service bandwidth upgrade

    • on xDSL broadband access network

    • on FTTH broadband access network

  • Problem2 – Economic selection of broadband access technology

    • xDSL vs. FTTH for brownfield

    • FTTH vs. WiMAX for greenfield

    • xDSL vs. WiMAX for rural area


Case study tools

Case study tools

VPIsystemsOnePlan Access

  • Market definition

  • Evolution forecasting

  • Demand mapping

Technology modeling

Network design optimization

Economy analysis

LStelcom MULTIlink

MULTIlink is a complete solution for fast microwave link engineering and designing of PMP/WLL/LMDS networks.


Session 8 case study on economic impact of broadband implementation

Problem 1 – “Service upgrade”

There is a need to model the impact of upgrading the service bandwidth, the service take rate, and the service mix on the access network.

For a given market, the access network planners want to perform Bandwidth Upgrade Scenarios, Uptake Growth Scenarios, and Service Mix Scenarios

The access network plannershave to dimension the required capacity of the access nodes, to optimize the access network and to calculate related coststo upgradeit.


Session 8 case study on economic impact of broadband implementation

Problem 1 – “service upgrade” – example I

<- Normal

Upgraded

Upgraded:


Session 8 case study on economic impact of broadband implementation

Problem 1 – “service upgrade” – example I

<- Normal

Upgraded:


Session 8 case study on economic impact of broadband implementation

Problem 1 – “service upgrade” - exampleI

<- Normal

Upgraded:

Difference:


Session 8 case study on economic impact of broadband implementation

Problem 1 – “service upgrade” - exampleI

<- Normal (3 MSAN)

Upgraded: (5 MSAN)


Session 8 case study on economic impact of broadband implementation

Problem 1 – “service upgrade” – example I

Costs :

Costs difference:


Session 8 case study on economic impact of broadband implementation

Problem 1 – “service upgrade” – example II

Normal :

Upgraded:


Session 8 case study on economic impact of broadband implementation

Problem 1 – “service upgrade” – example II

<- Normal

Upgraded:


Session 8 case study on economic impact of broadband implementation

Problem 1 – “service upgrade” - exampleII

<- Normal

Difference:

Upgraded:


Session 8 case study on economic impact of broadband implementation

Problem 1 – “service upgrade” - exampleII

<- Normal

(3 OLT, 17 Splitter 1:8 , 89 Splitter 1:4)

Upgraded:

(3 OLT, 28 Splitter 1:8, 93Splitter 1:4)


Session 8 case study on economic impact of broadband implementation

Problem 1 – “service upgrade” – example II

Costs :

Costs difference:


Session 8 case study on economic impact of broadband implementation

Problem2 – Techno-economical Access Study

Aim is to investigate the techno-economical impact of various access technologies on the network for a given market

Multiple techno-economical studies are carrier out for the purpose to determine the optimum access technology for the network

Selection is done by comparison of the economical parameters for each access technology


Session 8 case study on economic impact of broadband implementation

Problem2 – selection of access technology– example I

xDSL


Session 8 case study on economic impact of broadband implementation

Problem2 – selection of access technology– example I

FTTH


Session 8 case study on economic impact of broadband implementation

Problem2 – selection of access technology– example I

xDSL vs. FTTH brownfield

FTTH

xDSL


Session 8 case study on economic impact of broadband implementation

Problem2 – selection of access technology– example II

FTTH


Session 8 case study on economic impact of broadband implementation

Problem2 – selection of access technology– example II

WiMAX


Session 8 case study on economic impact of broadband implementation

Problem2 – selection of access technology– example II

FTTH vs. WiMAX greenfield

WiMAX

FTTH


Session 8 case study on economic impact of broadband implementation

Problem2 – selection of access technology– example III

xDSL


Session 8 case study on economic impact of broadband implementation

Problem2 – selection of access technology– example III

WiMAX


Session 8 case study on economic impact of broadband implementation

Problem2 – selection of access technology– example III

xDSL vs. WiMAX rural area