Status of PS/SPD

Status of PS/SPD. SM assembly: all equipped with modules, clear bundles are installed: on 2 inner (PS+SPD) (cryo), 2 outer (SPD) (barrack), 2 outer (PS) (cryo) – reassembled, 2 middle (PS+SPD) (cryo) –to be finished this week.

alda
Download Presentation

Status of PS/SPD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of PS/SPD SM assembly: • all equipped with modules, • clear bundles are installed: • on 2 inner (PS+SPD) (cryo), 2 outer (SPD) (barrack), • 2 outer (PS) (cryo) – reassembled, 2 middle (PS+SPD) (cryo) –to be finished this week. • + 2 outer (SPD) (cryo) – are needed for completion the cryo site (next week?). Commissioning group meeting CERN

  2. LED monitoring system Monitoring system installation/tuning: • Tables for SM in horizontal position are ready • Splitter and driver boards are installed on PS inner (cryo) and 3 PS+SPD outer • Setup for LED driver tuning is ready • (screening of PMT is being improved), • PMT is calibrated ; • training of tuning was done (+on cosmic stand); • 0 tuning of drivers is started on outer SPD SM. • Problems: • some effect on simultaneous illumination of PMT pixels (base? - not understood yet) • tuning of low signals (SPD) needs better screening of PMT Commissioning group meeting CERN

  3. Tests of SM with Cosmics • 0 test was done with 4 outer SMs in December • First setup: 2 outer SPD (bar) + 2 inner SPD+PS (cryo) – test is finished few days ago • Second setup: 2 middle SPD+PS (cryo) + 2 outer PS (cryo) – will start by end of week Commissioning group meeting CERN

  4. First results with cosmic • Statistics: 212 group of 16 pads = 3392 pads • More results will be presented on Friday (Sergei, Yuri) • Preliminary: • Light yield: • inner modules ~22-24 phel/mip • middle modules ~ 26-28 phel/mip • Outer modules ~ 18-22 phel/mip (depending on clear cable length) • Reproducibility of response in detector groups of 16 ~ 5-6%, groups of 64 ~ 8% (rms) • Variation of response in read-out channels is significant: ~8% -10%, with some channels +-50% • Light cross-talk is visible between PMT pixels, lower than 5% Commissioning group meeting CERN

  5. Uniformity of pad response Commissioning group meeting CERN

  6. Tracks, cross-talk, event display Commissioning group meeting CERN