Modeling and Predictive Control Strategies in Buildings with Mixed-Mode Cooling

Modeling and Predictive Control Strategies in Buildings with Mixed-Mode Cooling. Jianjun Hu, Panagiota Karava School of Civil Engineering (Architectural Engineering Group) Purdue University. Background - Mixed-Mode Cooling. Hybrid approach for space conditioning;

albin
Download Presentation

Modeling and Predictive Control Strategies in Buildings with Mixed-Mode Cooling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Modeling and Predictive Control Strategies in Buildings with Mixed-Mode Cooling Jianjun Hu, PanagiotaKarava School of Civil Engineering (Architectural Engineering Group) Purdue University

  2. Background - Mixed-Mode Cooling • Hybrid approach for space conditioning; • Combination of natural ventilation, driven by wind orthermal buoyancy forces, and mechanical systems; • “Intelligent” controls to optimize mode switching • minimize building energy use and maintain occupant thermal comfort.

  3. Background - Mixed-Mode Strategies When outdoor conditions are appropriate: • Corridor inlet grilles and atria connecting grilles open; • Atrium mechanical air supply flow rate reduced to minimum value, corridor air supply units close; • Atrium exhaust vent open; Institutional building located in Montreal - When should we open the windows ? - For how long? - Can we use MPC? Mixed-mode cooling concept (Karava et al., 2012)

  4. Background – MPC for Mixed-Mode Buildings • Modeling Complexity • Pump and fan speed, opening position (inverse model identified from measurement data)- Spindler, 2004 • Window opening schedule (rule extraction for real time application) - May-Ostendorp, 2011 • Shading percentage, air change rate (look-up table for a single zone) – Coffey, 2011 • Blind and window opening schedule (bi-linear state space model for a single zone) – Lehmann et al., 2012

  5. Objectives • Develop model-predictive control strategies for multi-zone buildings with mixed-mode cooling, high solar gains, and exposed thermal mass. • Switching modes of operation for space cooling (window schedule, fan assist, night cooling, HVAC) • Coordinated shading control

  6. MPC: Problem Formulation Offline MPC (deterministic); baseline simulation study for a mixed-mode building Linearized prediction models (state-space) Thermal Dynamic Model: Nonlinear Discrete Control Variables: Open/Close (1/0) Algorithms for discrete optimization On-line MPC (implementation, identification, uncertainty) Operable vents

  7. MPC: Dynamic Model (Thermal & Airflow Network) • Building section (9 thermal zones)

  8. MPC: Dynamic Model (Thermal & Airflow Network) • Heat balance for atrium air node • is the air exchange flow rate between zones (obtained from the airflow network model) : • pressure difference ΔP: • Solved by FDM method and Newton-Raphson Thermal model

  9. MPC: Dynamic Model (State-Space) • State-space representation: is a nonlinear term, i.e.: heat transfer due to the air exchange. A, B, C, D: coefficient matrices X: state vector U: input vector Y:Output vector obtained from the airflow network model Linear time varying (LTV-SS)

  10. MPC: Dynamic Model (State-Space) • States (X): X = [Ti , Tij , Tij,k]T • i – zone index • j – wall index • k – mass node index • Inputs (U): U = [Tout, Sij, Load]T • Tout – outside air temperature; • Sij – solar radiation on surfaces ij; • Load – heating/cooling load; • Outputs (Y):Y= [Ti , Tij , Tij,k]T • Zone air temperature; • Wall temperature; • …………

  11. MPC: Dynamic Model (LTV-SS) • Find the matrices from the heat balance equations e.g. atrium zone air node:

  12. MPC: Control Variable, Cost Function, and Constraints • Control variable:operation schedule • Cost function: • Min: • where: E is the energy consumption; IOt is vector of binary (open/close) decisions for the motorized envelope openings • Constraints: • Operative temperature within comfort range (23-27.6 °C, which corresponds to PPD of 10%) during occupancy hours; • Use minimal amount of energy: cooling/heating (set point during occupancy hours 8:00-18:00 is 21-23 ˚C, during unoccupied hours is 13-30 °C); • Dew point temperature should be lower than 13.5 °C (ASHRAE 90.1); • Wind speed should be lower than 7.5 m/s.

  13. MPC: Optimization (PSO) • “Offline” deterministic MPC: Assume future predictions are exact • Planning horizon: 20:00 -- 19:00, decide operation status during each hour. • find optimal sequence from 224options; Wetter (2011)

  14. MPC: Optimization (Progressive Refinement) • Multi-level optimization • Decide operation status for each two hours at night (20:00-5:00); • Use simple rules (based on off-line MPC)

  15. Simulation Study • Assumptions: • Local controllers were ideal such that all feedback controllers follow set-points exactly; • Internal heat gains (occupancy, lighting) were not considered; • An idealized mechanical cooling system with a COP value of 3.5 was modeled. • TMW3 data (Montreal) • Cases: • Baseline: mechanical cooling with night set back • Heuristic: Tamb∈ [15℃, 25℃], Tdew≤ 13.5 ℃, Wspeed< 7.5 m/s • MPC

  16. Results: Operation Schedule (Heuristic & MPC) • Hours during which vents are open are illustrated by cells with grey background • Heuristic strategy leads to higher risk of over-cooling during early morning (Day 1, Day 4, and Day 5);

  17. Results: Energy Consumption & Operative Temperature (FDM & LTV-SS) 1.3 °C -3.0 °C Comfort Acceptability reduced from 80% to 60%

  18. Results: MPC with PSO and Progressive Refinement (ProRe) • Similar energy consumption and operative temperature; • Much faster calculation with ProRe; 3 Days 3 Hours

  19. Results: MPC with PSO and Progressive Refinement (ProRe) • Fine-tune rules in Progressive Refinement method for different climate (LA)

  20. Conclusions • For the simulation period considered in the present study, mixed-mode cooling strategies (MPC and heuristic) effectively reduced building energy consumption. • The heuristic strategy can lead to a mean operative temperature deviation up to 0.7 °C, which may decrease the comfort acceptability from 80% to 60%. The predictive control strategy maintained the operative temperature in desired range. • The linear time-variant state-space model can predict the thermal dynamics of the mixed-mode building with good accuracy. • The progressive refinement optimization method can find similar optimal decisions with the PSO algorithm but with significantly lower computational effort.

  21. Acknowledgement • This work is funded by the Purdue Research Foundation and the Energy Efficient Buildings Hub, an energy innovation HUB sponsored by the Department of Energy under Award Number DEEE0004261. • In kind support is provided from Kawneer/Alcoa, FFI Inc., and Automated Logic Corporation