slide1
Download
Skip this Video
Download Presentation
Technical Co-operation Challenges OVERVIEW

Loading in 2 Seconds...

play fullscreen
1 / 13

Technical Co-operation Challenges - PowerPoint PPT Presentation


  • 410 Views
  • Uploaded on

Technical Co-operation Challenges OVERVIEW SESSION 1: Assistance requirements of States CNS/ATM and ICAO Technical Co-operation Presentations by States SESSION 2: ICAO Objectives Implementation Mechanism Presentations by partner Conclusion and recommendation

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Technical Co-operation Challenges' - albert


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
technical co operation challenges overview
Technical Co-operation Challenges OVERVIEW
  • SESSION 1:
  • Assistance requirements of States
  • CNS/ATM and ICAO Technical Co-operation
  • Presentations by States
  • SESSION 2:
  • ICAO Objectives Implementation Mechanism
  • Presentations by partner
  • Conclusion and recommendation
icao technical co operation
ICAO Technical Co-operation
  • Complements ICAO standardization & guidance
  • Since 1952
  • Assistance to more than 100 States
  • Program volume US$ 1 Billion, 100 projects per year
  • Across civil aviation sector
  • Complete project cycle
  • Non-profit, neutral, objective, participatory
  • Accountable, audited, transparent
icao technical co operation mandate for cns atm
ICAO Technical Co-operationMandate for CNS/ATM

“… ICAO shall co-ordinate and monitor the implementation of the CNS/ATM systems on a global basis…

Towards this end, ICAO shall play its central role in

co-ordinating technical co-operation arrangements for CNS/ATM systems implementation. …

ICAO shall facilitate the provision of assistance to States with regard to the technical, financial, managerial, legal and co-operative aspects of implementation.”

(Council Decision 141/13 of 1994)

assistance requirements of states
Assistance Requirements of States
  • Needs assessment and project development
  • Donor mobilization and financing arrangements
  • Familiarization and specialized training
  • Transition planning, cost-benefit and recovery analyses
  • Systems planning and specification
  • Equipment procurement
  • Human resource planning and development
icao technical co operation cns atm
ICAO Technical Co-operationCNS/ATM
  • Global needs assessment surveys
  • Global Plan
  • Transition planning
  • Familiarization and training
  • Equipment procurement
  • Financing arrangements
icao technical co operation experts
ICAO Technical Co-operationExperts
  • Over 2600 individual experts from around the world
  • More than 100 registered consulting companies
  • Advisers/consultants, Operational Assistance
  • Virtually all aviation aspects covered
  • OJT for national counterparts
icao technical co operation training
ICAO Technical Co-operationTraining
  • Basic, advanced, refresher: classroom, OJT, factory
  • Workshops, seminars, international fellowship training
  • Establishment of over 70 training institutes
  • TRAINAIR
    • standardized training development methodology, ensuring compatibility of training courses with SARPs
    • training resource sharing system for cost-effective utilization of training material
    • international, co-operative network of CATIs
icao technical co operation cns atm training
ICAO Technical Co-operationCNS/ATM Training
  • Asia/Pacific: 27 in-country and 3 Inter-country familiarization seminars for 40 States/1000 participants
  • Latin America: 4 seminars for 23 States/300 participants
  • Europe/Middle East: 3 seminars on WGS-84
  • Africa: involvement in 1 sub-regional economics seminar
  • specialized training courses, such as on GPS Procedures Design, GNSS Implementation etc.
icao technical co operation procurement

ICAO Technical Co-operation Procurement

Chief, ICAO Procurement Services

Mr Arnold Schwatschko

icao technical co operation cns atm equipment
ICAO Technical Co-operation CNS/ATM Equipment
  • ICAO can effect procurement of ground systems, such as ATC consoles and terminals for CNS applications, such as:
    • Automatic Dependent Surveillance (ADS) equipment
    • Controller/Pilot Data Link Communications (CPDLC) systems
    • Local Area Augmentation
    • GNSS
    • SSR with/without Mode-S and associated Data Link systems
    • VHF Digital Data Link
icao technical co operation procurement12
ICAO Technical Co-operation Procurement
  • ICAO provides procurement services, including
    • identification/definition of equipment needs
    • development of specifications and tender documents
    • call for international, regional or national tenders
    • evaluation of bids
    • contract award and management
    • factory and site acceptance
    • commissioning of systems
cns atm technical co operation

CNS/ATM Technical Co-operation

India

Mr H. V. Sudarshan

DGCA Chile

Mr Luis A. Rossi

IPV Brazil

Mr Eno Siewerdt

ad