Exercising disaster recovery
Download
1 / 31

Exercising Disaster Recovery - PowerPoint PPT Presentation


  • 97 Views
  • Uploaded on

Exercising Disaster Recovery .

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Exercising Disaster Recovery' - albert


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Exercising disaster recovery

Exercising Disaster Recovery

The plan is no better than the exercise program. Miami University Information Technology Services has committed to exercising and testing its disaster-recovery plan at least twice a year. Techniques for developing and evaluating tabletop and drill exercises will be presented.

Ohio Higher Education Computing Council 2006


Who is jdk
Who is JdK?

I am an IT Guy!

  • Decades of experience Systems Programming.

  • Information Technology Infrastructure Library (ITIL) Certificate of Competency

  • Certified Business Continuity Professional – Disaster Recovery Institute International. Systems Integration

  • Now pursuing PMP…

    With good relations with the business side of the university.

    [email protected]

OHECC 4/20/2006


Overview
Overview

What we want from Exercising

What we did

What we got

OHECC 4/20/2006


What does miami wants from a disaster recovery exercise
What does Miami wants from a Disaster Recovery Exercise?

Preparation

Training

Relationship building

Publicity

Evaluation

Improvement

(maybe have a little bit of fun)

OHECC 4/20/2006


What does miami wants from a disaster recovery exercise1
What does Miami wants from a Disaster Recovery Exercise?

For a Financial Services exercise:

  • Pay Payroll

  • Pay Vendors

  • Manage Cash

  • Maintain information

OHECC 4/20/2006


What we did
What We Did

Types of Exercises

Project methodology

An Example

OHECC 4/20/2006


Types of disaster recovery exercises
Types of Disaster Recovery Exercises

Walk Through

Tabletop

Drill (Operational)

OHECC 4/20/2006


Walk Through

Format: 1 hour meeting with a few staff; walk through a specific DR Procedure

Participants: facilitator and trainees

Purpose: train staff to use DR Procedures

evaluate procedures

Preparation:

  • Distribute procedure before meeting

  • Facilitator should have & understand DR procedure

OHECC 4/20/2006


Tabletop

Format: 4 hour meeting: exercise & debriefing

Talk through a specific disaster scenario

Participants: Players, Evaluators, Observers, Controllers

From multiple departments

Purpose: Preparation, Training, …

Evaluation, Improvement

Preparation:

  • Objectives

  • Scenario

  • Evaluation Criteria

  • People

OHECC 4/20/2006


Drill

Format: All day: exercise & debriefing

Work through a specific disaster scenario

Participants: Players, Evaluators, Observers, Controllers

Purpose: Preparation, Training, …

Evaluation, Improvement

Preparation:

  • Objectives

  • Scenario

  • Evaluation Criteria

  • People

OHECC 4/20/2006


Project methodology
Project methodology

Seven Step Process

  • Concept

  • Initiation

  • Requirements

  • Development

  • Validation

  • Deployment

  • Close

OHECC 4/20/2006


An example
An Example

Drill

  • MU Disaster Tolerance Architecture

  • Exercise Philosophy

  • Scenario

  • Anticipated Schedule of Events

  • Exercise Documentation

OHECC 4/20/2006



Exercise philosophy
Exercise Philosophy

  • No harm to production environments

  • Partnership between IT & Client

    • Client chaired Evaluation Team

  • 80 / 20 Rule

    • 80% of the results from 20% of everything that could be tested.

  • Start with 1 pound weights

OHECC 4/20/2006


Sample Scenario

Today is Friday, December 14th, 2005. The skies are overcast and it is snowing lightly. The current temperature is 12°F. At 8:30 a.m., the lights in Hoyt Hall flickered and went out. Within a few seconds, they came back on and went out again. All lights, workstations (with the exception of a few laptops), and other electrical devices are without power. The Machine Room’s emergency lighting and indicator lights are lit indicating servers are still powered up.

The Physical Facilities Department Operations Center was notified by telephone of an apparent failure of the Hoyt emergency generator. Within minutes the fire alarm is activated.

Bright strobe lights and the high-pitched shrill of the fire alarm filled the building. Occupants grabbed jackets, purses and laptops and began evacuating the building. Before leaving, someone called 911 to report the fire alarm. Police Dispatch received the call from Hoyt Hall at 8:37 a.m.

By 8:42 a.m. occupants of Hoyt Hall have left the building. Police and PFD staffs arrive on the scene by 8:45. A metal rod is found sticking out of the generator at 8:55. Domestic terrorism is highly suspected and the Miami University Emergency Operations Center is activated.

This is a critical day for Payroll Services. Student payroll is scheduled to be paid. In addition, Accounts Payable needs to process their regular check runs to pay vendors and refund students. Treasury Services needs to process the daily cash and investment transactions.

PFD informs the Information Technology Services’ Computing and Network Operations Center (CNOC) staff that the Hoyt machine room UPS has approximately 90 minutes of capacity. After 90 minutes the machine room will be without electrical power.

OHECC 4/20/2006


Anticipated schedule of events
Anticipated Schedule of Events

9:30 Controllers review Player’s Handbook with Players & other participants.

Assistant Drill Controller reads scenario to IT players

Failover based services continue to be available:

Approx 9:40 Deputy CIO Appoints a Disaster Recovery Coordinator (DRC)

Thereafter: DRC pursues recovery of services on “failover” equipment.

Approx 10:30 Primary site is completely powered down. No electricity & no one allowed in.

Lead Drill Controller informs Finance players that they no longer have IT services.

Approx 12:00 Recovered services made available to Finance for test transactions.

Thereafter: Finance staff pursues sample transactions

Accounts Payable

Payroll

Treasury Services

3:30 Debriefing

OHECC 4/20/2006


Exercise documentation
Exercise Documentation

Exercise Plan

Evaluation Plan

Participants’ Handbook

Memo to Participants

OHECC 4/20/2006


Exercise plan
Exercise Plan

OHECC 4/20/2006


Simulated drill infrastructure
Simulated Drill Infrastructure

OHECC 4/20/2006


Evaluation plan
Evaluation Plan

  • Exercise Objectives

    • Effective communication

    • Identify appropriate measures to restore financial services

    • Resolve technical engineering questions

    • Demonstrate the level of knowledge

    • Demonstrate the adequacy of current procedures, practices and knowledge

OHECC 4/20/2006



Participants handbook
Participants’ Handbook

OHECC 4/20/2006


Assumptions
Assumptions

  • Finance & Business Services and Information Technology Services have established emergency plans and procedures. Those documents include mitigation, response and recovery elements. They may be brought to and used at the exercise.

  • Players will respond in accordance with the existing plans, procedures and policies. In the absence of applicable plans, procedures or policies, players will be expected to apply individual and/or team initiative to satisfy response requirements.

  • + others…

OHECC 4/20/2006


Artificialities
Artificialities

  • The university’s banks are not participating in the exercise; procedures will prepare files for transmission but they will not be transferred.

  • The disaster recovery environment is a copy of the production environment, reflecting the state of the production environment approximately two days before the exercise.

  • Outage notices will not be emailed nor posted to web sites. Voice communications are tagged with “This is a disaster recovery exercise communication.”

  • The secondary computing center currently hosts neither the quick recovery database server nor the Citrix server. These machines will be moved to the secondary site when it can support them.

  • The Controller and Assistant Controller may add other artificialities during the drill; these should be documented for the After Action Report.

  • + others…

OHECC 4/20/2006


Exercise rules
Exercise Rules

Players may talk to other players during the exercise. Players should work with other players to understand procedures and strategize solutions.

In the event a player needs to talk with a non-player the player must first consult with the controller. The controller will log the request and will approve, disallow it, or provide the requested information.

Evaluators, observers and other non-players should not offer advice or comments to the players, unless directed to do so by the controller who is responsible for logging the communication.

Players should talk to the controller when they need to talk to someone for whom there is no player. For instance if bank personnel need to be called the player would talk to their controller since bank personnel are not participating in the exercise.

Follow department/university procedures when they are available. One of the goals of the exercises is to evaluate existing procedures. Another is to determine if additional procedures are needed.

Exercise voice communications and exercise emails sent out during the event should be prefixed with

THIS IS A DISASTER RECOVERY EXERCISE COMMUNICATION

Exercise voice communications and exercise emails sent out during the event should be suffixed with

THIS WAS A DISASTER RECOVERY EXERCISE COMMUNICATION, THIS IS ONLY AN EXERCISE

Production services should not be affected by exercise activities. Since banks are not participating care must be taken to make sure files are not transmitted to banks.

Exercise may be rescheduled in the event of a critical incident which requires the attention of exercise participants.

OHECC 4/20/2006



What we got
What we got

Preparation

Training

Relationship building

Publicity

Evaluation

Improvement

(maybe had a little bit of fun)

OHECC 4/20/2006


What we got1
What we got

  • Pay Payroll

  • Pay Vendors

  • Manage Cash

  • Maintain information

OHECC 4/20/2006


What we got2
What we got

  • Project to improve 2nd Site

  • Project to improve Remote Site

  • Improved procedures

  • Crisis Leadership Training

  • Positive Auditor Review

OHECC 4/20/2006


Lessons learned
Lessons Learned

  • Start with one pound weights

  • Expect creativity!

  • Expect surprises as well.

  • Project Manager wrote all documentation

OHECC 4/20/2006


Comments questions
Comments / Questions

OHECC 4/20/2006