Team _ - Jan 18 2005. Project Goal. The Goal The goal of our project is to create a working and user friendly simulation of the AODVS system The secondary goal is to improve upon the existing system by adding timeouts on SID packets (intrusion detection). Design Revisions.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Team _ - Jan 18 2005' - alain


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Project goal
Project Goal

  • The Goal

    • The goal of our project is to create a working and user friendly simulation of the AODVS system

    • The secondary goal is to improve upon the existing system by adding timeouts on SID packets (intrusion detection)


Design revisions
Design Revisions

  • Through discussions both with the professor and amongst the group the design has changed in several ways

    • Nodes will be told when to move, but not where to move, by the Monitor class

    • Our thoughts on the visualization of network traffic have changed more than once, and may change again


Design revisions cont
Design Revisions (cont)

  • The Monitor class has had more things moved and added to it for coordination between the various layers of our program

  • External lookup tables for node and packet types have been added

  • “Big Picture” remains the same as in original designs


Risk analysis
Risk Analysis

  • Timing

    • Movement handled by coordinating through the Monitor and not leaving it up to the nodes

  • Cryptography

    • Pushed off until later, possibility of not getting to it

  • AODV algorithm not fully implemented or implemented incorrectly

    • Used an Internet Draft from Univ. of Calif.


Schedule
Schedule

  • This week

    • Monitor will be done

    • 50% of packets implemented and working

    • Visualization of these packets

  • Week 7

    • Other 50% of packets implemented

    • Tokens working to tell good nodes from bad

    • Authority class working to start up system


Schedule1
Schedule

  • Week 8

    • Bad nodes implemented

    • Detection system in place to detect bad routing and dropping packets

  • Week 9

    • Final testing and debugging

    • Trials to see if our improvement has worked

  • Week 10

    • Evaluation and report