1 / 8

31 October – 2 September 2011 Young-Youn Park

KMA report. 31 October – 2 September 2011 Young-Youn Park Numerical Model Development Division, Korea Meteorological Administration. KMA global ensemble: Changes. TIGGE data. TIGGE data Old EPS data: 16 Jan 2008 ~ 30 Nov 2010 No data since 1 Dec 2010

ailis
Download Presentation

31 October – 2 September 2011 Young-Youn Park

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KMA report 31 October – 2 September 2011 Young-Youn Park Numerical Model Development Division, Korea Meteorological Administration

  2. KMA global ensemble: Changes

  3. TIGGE data • TIGGE data • Old EPS data: 16 Jan 2008 ~ 30 Nov2010 • No data since 1 Dec 2010 • because of network problem(too slow to ftp the new ensemble data ~ 64GB/day) • Tried two way: • To enhance N/W speed to ECMWF  recently succeed (80min/32GB)  under test • To send data to NCAR using LDM  difficulty in setting LDM • Changes in TIGGE data • Resolution: (Operation 0.5625deg, TIGGE 1.25 deg)  (0.5625, 0.375 deg) • Size: old 10GB/day  new 64GB/day(later 84GB/day) • Parameter • 8 P levels * 5 par + gph at 50 hPa(OK)  4 pars (no q) • 1 pt level (320K) * 1 par (pv) (X) OK • 2 pv level * 3 parameter (X) pt (no u, v) • Single level * 28 parameter (6 parameters)19 pars

  4. Other data • Cyclone data: ftp://cxml:cxml@210.107.255.35 • Not working after 30 Dec 2010 • Security issue with IT team • Will resume later … • Model description(metadata): ready to update • KMA’s verification statistics report(to LC on EPS verification): • Deterministic score: 200901- (NH), 201103-(TR, SH) • CRPS: under checking if KMA use the same method as instructed • Reliability table parameters: 200901- (NH), 201103-(TR, SH), T850, Z500, PMSL only

  5. Trim obstore Varobs obstore Trimmed obstore OPS background OPS(24M) Previous cycle (-12 hours) Global 4DVar N512L70(25km) varobs ETKF background ETKF analysis IC Perturbations OPS background ETKF background UM Forecast N320L70M24(40km) Next cycle (+12 hours) KMA EPS Flow chart

  6. Summer 2009 (.5.23-6.25) : Z500 OP vs MOGREPS(40km, 90km) NH RMSE MO(40km50L) SPREAD MO(90km38L) OPER SH

  7. RMSE MO(40km50L) SPREAD MO(90km38L) OPER Summer 2009 (.5.23-6.25) : T850, MSLP OP vs MOGREPS(40km, 90km) T850 MSLP

  8. May 2011: 40km L50 vs L70

More Related