An ASSRC (Acc. Sys. Safety Review Com.) meeting was held on Sept. 24, 2013

An ASSRC (Acc. Sys. Safety Review Com.) meeting was held on Sept. 24, 2013  I have gone around and talked … everybody (with due date  Dec. 15) has made or can make a statement now except the window calculation :

afram
Download Presentation

An ASSRC (Acc. Sys. Safety Review Com.) meeting was held on Sept. 24, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. An ASSRC (Acc. Sys. Safety Review Com.) meeting was held on Sept. 24, 2013 •  I have gone around and talked … everybody (with due date  Dec. 15) has made or can make a statement now except the window calculation : • Perform beam particle analysis for full beam intensity, and luminosity. (Kin Yip, Due 12/15/13) • Calculate stress yield due to temperature rise on window at full beam intensity and beam spot size. (J. Tuozzolo, actually C. Pai, Due 1/30/14  12/15/13) • Estimate the time to remove beam from the machine when a NMC trips to determine if the time delay is adequate for machine protection. (A. Drees, Due 12/15/13)  we’ve been using it … • Estimate operational down time and effect to RHIC vacuum, if a vacuum loss occurs in the Roman Pot.(M. Mapes, Due 12/15/13)  a week • Determine effect upon Be beam pipe in STAR with a catastrophic vacuum loss in the Roman Pot. (W. Meng, Due 12/15/13)  no impact • Review NMC vs BLM operation or the use of both. Investigate electronic noise issues with NMCs to prevent inadvertent beam aborts. (D. Gassner, Due prior to Run 15). • Review/ update Operation Procedure OPM (TPL 09-09) for PP2PP operations. (P. Ingrassia, due prior to Run 15).

More Related