Building Permit Contractor Round Table. 8744 Government Drive New Port Richey, Florida Wednesday – June 12, 2013 2:00 pm to 4:00 pm. Statistics. March April May Applications 2188 2201 2529 Permits 2435 2874 3053 NB1 61 83 57 N2B 63 84 92. Online Permits.

afra
Download Presentation

Building Permit Contractor Round Table

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Building Permit Contractor Round Table 8744 Government Drive New Port Richey, Florida Wednesday – June 12, 2013 2:00 pm to 4:00 pm

  2. Statistics MarchAprilMay Applications 2188 2201 2529 Permits 2435 2874 3053 • NB1 61 83 57 • N2B 63 84 92

  3. Online Permits MarchAprilMay 22 Air Conditioning Change outs 243 483 440 • Re Roofs 4 5 5 • Ground Settlement40 75 26 • Water Heaters 48 42 35 • Electrical 17 8 34

  4. Statistics Single Family Homes Issued

  5. Turn Around Time As of May 29, 2013 • Residential Site Review working on applications submitted May 16, 2013 (eight working days). • Plan Review working on applications submitted May 8, 2013 (fourteen working days).

  6. Number of Inspections Performed MarchAprilMay • Structural 4446 4619 3149 • Electrical 1214 1130 930 • Mechanical 1188 1356 1097 • Plumbing 1228 1301 1018

  7. Number of Inspectors MarchApril May • Structural 8 8 8 plus (one Vacant) • Electrical 5 5 5 • Mechanical 5 5 5 • Plumbing 3 3 3

  8. Over Time May 2013 HoursCost • Permitting109.25 $ 1,695.99 • Plan Review 69.00 $ 2,216.72 • Inspections35.50$ 1,039.59 • Total 213.75 $ 4,952.30

  9. Inspections Continued March

  10. Inspections Continued April

  11. Inspections Continued May

  12. Roll Overs MarchAprilMay • Structural 655 621 283 • Electrical 96 3353 • Mechanical 10 12511 • Plumbing 27 5948

  13. Model Center Industry providing a suggested work flow for review and discussion

  14. Accela Industry providing a copy of suggested or desired programming from other jurisdictions

  15. Utilities Utility fee payment issues

  16. TUG (temporary underground power) Services

  17. Eaton Cutler-Hammer MB48B200BTS 200 amp meter/panel.

  18. Siemens 660020 Outdoor Main Breaker Meter-Panel Combo 200A 20-40 Circuit 2 Install receptacles for construction below panel and include a conduit into the garage for the future house panel

  19. Square D QC816F200C 200 amp combo panel and meter. 8 space breaker and feed thru lugs. 3

  20. TUG Service Impacts • Adds inspections and associated costs to a residential permit. • All impact and mobility fees paid before power release. • Power Company must approve (At this time TECO is not accepting TUG services). • Longer hook up time from the Power Company than conventional temp power services. • ZERO TOLERANCE to any non-code compliant installations. • No energizing any circuits other than receptacles outside until after successfully passing final electric. • No TUG service installed until dry-in.

  21. Building Construction Services Calendar Information will be available within the Calendar on the web site. http://www.pascocountyfl.net/

  22. Flood Map Modernization FMM Flyer 2013 06 08.pdf Updated_Watershed Studies.pdf

  23. Future Topics Desired discussion topics for future meetings.

  24. Next meeting is scheduled for July 10, 2013 at 8731 Citizens Drive, West Pasco Government Basement Training Room

  25. Thank you for your attendance.