1 / 9

SO AMMA-CATCH Atelier couche de surface (14-16 mars 2007)

SO AMMA-CATCH Atelier couche de surface (14-16 mars 2007) Humidité et télédétection : point sur les 3 sites. Capteurs existants: AMSR-E (2002-): 50 km, journalier Passif: 6.9 + 10.7 GHz ENVISAT/ASAR (2002-): 150m, 3 j Actif: 6.6 GHz ERS/SCAT(1993-2006): 50km, 2-8 j Actif: 5.3 GHz

aerona
Download Presentation

SO AMMA-CATCH Atelier couche de surface (14-16 mars 2007)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SO AMMA-CATCH Atelier couche de surface (14-16 mars 2007) Humidité et télédétection : point sur les 3 sites Capteurs existants: AMSR-E (2002-): 50 km, journalier Passif: 6.9 + 10.7 GHz ENVISAT/ASAR (2002-): 150m, 3 j Actif: 6.6 GHz ERS/SCAT(1993-2006): 50km, 2-8 j Actif: 5.3 GHz METOP/ASCAT (2006-): 25km, 2j Actif: 6.6 GHz TMI (1997-): 50km, journalier Passif: 10.65 GHz Capteurs futurs: SMOS (2008): 40km, 3 jours Passif: 1.4GHz Activités en cours dans AMMA sur les trois sites: Gourma: AMSR, ENVISAT/ASAR, ERS-SCAT Niger: AMSR, ENVISAT/ASAR Bénin: problème lié à la couverture végétale Intersites: - Validation SMOS en 2008-2009 (ESA+TOSCA) - ALMIP-MEB (lien AMMA-EU) - Lien SM/convection à meso-échelle (AMMA-EU)

  2. 1 - En Actif: ENVISAT/ASAR MALI (Agoufou): Baup et al 2007a et 2007b Précision d’inversion: 2.8% et 2.2% sur les 2 sites Résol: ~ 1km, 15j Niger (Kori de Diantandou): (Zribi et al 2006)

  3. 1 - En Actif: ENVISAT/ASAR Soil Moisture mapping <- Gourma: mesoscale site sept 2005 Niger Kori de Diantandou, sept 2004

  4. Simulated TB 1km 55km footprint 55km AMSR-E TB Level 3 25km product 2 - En Passif: AMSR-E NIGER: Meso scale TB simulations: ISBA + C-MEB (1km²)C-band Microwave Emission of the Biosphere (Pellarin et al., 2007, in prep)Agrégation/désagrégation Résol ~ 25km/1j -> désagrégation à 1km/1j Simulated TB 1km Simulated TB 25km-reggrided

  5. 2 - En Passif: AMSR-E - Gourma: Meso scale evaluation of NASA SM products (Gruhier et al., 2007, in prep) Évaluation sur 2005: Précision du produit AMSR NASA: 5.17% sur juillet-Septembre - Gourma: Meso scale inversion of SM products (de Rosnay et al., 2007, in prep) 2006 inversion: accuracy of SM products: 4.32 for NASA products 2.77 for CESBIO products Résol 25km 1j

  6. Mali Niger Benin 3- Intersite: SMOS cal-val 2008-2009 AMMA site de validation ESA pour SMOS (SMOS: Soil Moisture and Ocean Salinity) 2001 2005 2010 2006 2007 AMMA: soil moisture network 22stations Financement partiel du TOSCA probable

  7. 3- Intersite: ALMIP-MEB ALMIP-MEB (CESBIO-LTHE-CNRM) en 2007 Coupling ALMIP simulations to Microwave Emission Model C-MEB: simulate C-Band Brightness Temperature as seen by AMSR -> Range of BT simulated by 11 LSMs -> Validation of surface soil moisture simulated by LSMs -> Scatter C-band BT simulated by LSMs at Regional scale -> Repeat simulations at L-band (preparation SMOS) -> Estimate additional information on Soil Moisture expected to be provided by SMOS compared to AMSR

  8. 3- Intersite: lien entre humidité et convection Satellite detection of soil moisture impacts on convection at the mesoscale (Taylor et Ellis, 2006) Rapports de polarisation TMI: 13.5-13.9°N, 2.4-2.8°W SOP 2006: étude de cas Niger-Mali transect 14-16°N Température (orange) et specific humidity (red line) Vol à 250 m d’altitude le 21 Juillet 2006 Après le passage de deux systèmes convectifs le 20 juillet. (Taylor et al 2007 in prep)

  9. 4- Publications • Publié ou sous presse: Zribi et al IJRS 2006 Baup et al RSE 2007 Baup et al IEEE 2007 Taylor et Ellis GRL 2006 (AMMA-EU) • En préparation: Pellarin et al 2007 Gruhier et al 2007 de Rosnay et al 2007 Taylor et al 2007 (AMMA-EU) (Noir: publis ORE / Gris publis non ORE)

More Related