Urgent Maintenance Dredging

Project Sites. Urgent Maintenance Dredging. PROPOSED DISPOSAL SITES. PROPOSED DISPOSAL SITE . B2. C4. C2. D1. A2. D5. A1. D3. C3. C1. B3. B1. B4. A3. D4. A4. C5. National Importance. D2. DG Cipta Karya Sites. Tanjungan:

aelwen
Download Presentation

Urgent Maintenance Dredging

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Sites Urgent Maintenance Dredging PROPOSED DISPOSAL SITES PROPOSED DISPOSAL SITE B2 C4 C2 D1 A2 D5 A1 D3 C3 C1 B3 B1 B4 A3 D4 A4 C5 National Importance D2

  2. DG Cipta Karya Sites Tanjungan: Proposed widening. Industrial and residential extensive impact. Final design not yet prepared Kamal: Proposed widening. Extensive impact. In-depth PAP socio-economic six month study initiated by DGCK Housing to begin in May 2008. Design described in DKI 3-9 Lower Angke: Dredging only. Prior sheet piling prevents encroachment. No PAPs. Temporary removal of ferry structures Cideng-Thamrin: No encroachment evident. Temporary impact may result if embankments are repaired. Final design not yet presented

  3. KAMAL

  4. DG Cipta Karya Sites Kamal: Proposed widening. Extensive impact. In-depth PAP socio-economic six month study initiated by DGCK Housing to begin in May 2008. Design described in DKI 3-9

  5. TANJUNGAN

  6. DG Cipta Karya Sites Tanjungan: Proposed widening. Industrial and residential extensive impact. Final design not yet prepared

  7. LOWER ANGKE

  8. DG Cipta Karya Sites Lower Angke: Dredging only. Prior sheet piling prevents encroachment. No PAPs. Temporary removal of ferry structures

  9. CIDENG THAMRIN

  10. DG Cipta Karya Sites Cideng-Thamrin: No encroachment evident. Temporary impact may result if embankments are repaired. Final design not yet presented

  11. DG Water Resources Sites Sunter: No resettlement impacts. Housing encroaches on the banks around the Taruna Bridge/Pasar Pulo Gadung. Will not be affected by dredging. Plans for embankment work is not known West Banjir Canal: Wide canal. No resettlement impacts Cakung: 2 separate communities (Madura inland, Bugis fishing community at the Cakung mouth). Extensive resettlement impact depending on engineering design and dredging requirements. Separate LARAPs will be required for the 2 communities Cengkareng: Wide canal. No resettlement impacts

  12. CENGKARENG

  13. DG Water Resources Sites Cengkareng: Wide canal. No resettlement impacts

  14. DG Water Resources Sites West Banjir Canal: Wide canal. No resettlement impacts

  15. SUNTER

  16. DG Water Resources Sites Sunter: No resettlement impacts. Housing encroaches on the banks around the Taruna Bridge/Pasar Pulo Gadung. Will not be affected by dredging. Plans for embankment work is not known

  17. CAKUNG DRAIN

  18. CAKUNG FISHING COMMUNITY

  19. DG Water Resources Sites Cakung: 2 separate communities (Madura inland, Bugis fishing community at the Cakung mouth). Extensive resettlement impact depending on engineering design and dredging requirements. Separate LARAPs will be required for the 2 communities

  20. DKI Sites Ciliwung-Gunung Sahari: No encroachment evident in site visits Pakin-Kali Besar: Channel walls are generally hard surface (concrete, bricks). No encroachment Sentiong-Sunter: No encroachment issues if the site visit covered the Project area Diversion Grogol-Secretaris-Angke: The section between the Lower Angke and the Secretaris is nasty (mud embankments, garbage, small housing section). Possible resettlement impact (±30 hh) depending on engineering design Krukut: Channel walls are generally hard surface (concrete, bricks). No encroachment

  21. DIVERSION GROGOL-SEKRETARIS-ANGKE

  22. DKI Sites Diversion Grogol-Secretaris-Angke: The section between the Lower Angke and the Secretaris is nasty (mud embankments, garbage, small housing section). Possible resettlement impact (±30 hh) depending on engineering design

  23. DKI Sites Pakin-Kali Besar: Channel walls are generally hard surface (concrete, bricks). No encroachment

  24. DKI Sites Ciliwung-Gunung Sahari: No encroachment evident in site visits

  25. DKI Sites Krukut: Channel walls are generally hard surface (concrete, bricks). No encroachment

  26. SENTIONG-SUNTER

  27. DKI Sites Sentiong-Sunter: No encroachment issues if the site visit covered the Project area

  28. DKI Sites (Waduks) Waduk North Sunter: No encroachment which will affect planned dredging. No relocation will be required Waduk Pluit: The Pluit reservoir (80ha)was built about 20 years ago. DKI estimates there are now 10,000hh living on the reservoir embankment. The JUFMP planned dredging should not impact this population. No relocation will be required Pluit East Sunter North Sunter Waduk East Sunter III: No encroachment which will affect planned dredging. No relocation will be required South Sunter Waduk South Sunter: No encroachment which will affect planned dredging. No relocation will be required Melati Waduk Melati: No encroachment which will affect planned dredging. No relocation will be required

  29. WADUK PLUIT

  30. DKI Sites (Waduks) Waduk Pluit: The Pluit reservoir (80ha)was built about 20 years ago. DKI estimates there are now 10,000hh living on the reservoir embankment. The JUFMP planned dredging should not impact this population. No relocation will be required Pluit

  31. WADUK MELATI

  32. DKI Sites (Waduks) Melati Waduk Melati: No encroachment which will affect planned dredging. No relocation will be required

  33. DKI Sites (Waduks) Waduk North Sunter: No encroachment which will affect planned dredging. No relocation will be required East Sunter North Sunter Waduk East Sunter III: No encroachment which will affect planned dredging. No relocation will be required South Sunter Waduk South Sunter: No encroachment which will affect planned dredging. No relocation will be required

  34. DKI Sites (Disposal Areas) Muara Kali Adem: The proposed disposal site is sea based, located along the coast and out into the sea between a fishing harbour breakwater and a small river – the Kali Adem Pluit:The site is in the tidal zone. Mangroves and fishponds/fishpond sheds (± 6) are found on the site which is walled off from the inland areas by a cement block wall. Outside the walls can be seen a large power plant complex, as well as residential areas Rorotan:There are 2 sites at Rorotan. Rorotan 1 is private sector land requesting fill to deal with flooding problems. Rorotan 2 is a large solid waste dumpsite currently in use Pluit Karang: The site is located under the tollroad, and is covered with banana trees. Approx 30 structures, small gardens and extensive fishponds are found on the site Taman BMW: This site (32ha)of flat land surrounding an old railway bed is sandwiched between the highway and a small lake Kamal Muara: The site is located in an industrial area where a large section of land is currently being filled with loads of earth, concrete, etc. The site is reported previously to have been swampy. There are 2 good size fishponds in the foreground but these are said to be outside of the Project site Kapuk Muara:The site is located in a gated community, surrounded on the outskirts by upper middle income housing and middle income new rukos. The assumption is that fill has been requested by the private sector owners of the land Rorotan: This site is a large currently utilized solid waste dump located directly on a main road

  35. DISPOSAL SITE KAMAL MUARA

  36. DKI Sites (Disposal Areas) Kamal Muara: The site is located in an industrial area where a large section of land is currently being filled with loads of earth, concrete, etc. The site is reported previously to have been swampy. There are 2 good size fishponds in the foreground but these are said to be outside of the Project site

  37. DISPOSAL SITE KAPUK MUARA

  38. DKI Sites (Disposal Areas) Kapuk Muara:The site is located in a gated community, surrounded on the outskirts by upper middle income housing and middle income new rukos. The assumption is that fill has been requested by the private sector owners of the land

  39. DISPOSAL SITE PLUIT KARANG

  40. DKI Sites (Disposal Areas) Pluit Karang: The site is located under the tollroad, and is covered with banana trees. Approx 30 structures, small gardens and extensive fishponds are found on the site

  41. DISPOSAL SITE MUARA KALI ADEM

  42. DKI Sites (Disposal Areas) Muara Kali Adem: The proposed disposal site is sea based, located along the coast and out into the sea between a fishing harbour breakwater and a small river – the Kali Adem

  43. DISPOSAL SITE PLUIT

  44. DKI Sites (Disposal Areas) Pluit:The site is in the tidal zone. Mangroves and fishponds/fishpond sheds (± 6) are found on the site which is walled off from the inland areas by a cement block wall. Outside the walls can be seen a large power plant complex, as well as residential areas

  45. DISPOSAL SITE BMW

  46. DKI Sites (Disposal Areas) Taman BMW: This site (32ha)of flat land surrounding an old railway bed is sandwiched between the highway and a small lake

  47. DISPOSAL SITE ROROTAN

  48. DKI Sites (Disposal Areas) Rorotan:There are 2 sites at Rorotan. Rorotan 1 is private sector land requesting fill to deal with flooding problems. Rorotan 2 is a large solid waste dumpsite currently in use

  49. DISPOSAL SITE CAKUNG

  50. DKI Sites (Disposal Areas) Rorotan: This site is a large currently utilized solid waste dump located directly on a main road