BLUE – DESIGN RED - EXECUTION. Duration in month. 2017. 2016. 2014. 2015. 2013. 2012. 2011. 2010. TASK NAME. 31.8.17. 1.9.10. Red Line project. 84. 21.9.11. 21.10.12. 3.10.10. Launching shafts for TBM tunnels  . 25. 16.4.14. 31.3.13. 9.12.10. TBM Tunnels. 41. 1.6.12.

aelan
Download Presentation

2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BLUE – DESIGN RED - EXECUTION Duration in month 2017 2016 2014 2015 2013 2012 2011 2010 TASK NAME 31.8.17 1.9.10 Red Line project 84 21.9.11 21.10.12 3.10.10 Launching shafts for TBM tunnels   25 16.4.14 31.3.13 9.12.10 TBM Tunnels 41 1.6.12 1.10.14 9.12.10 46 NATM Tunnels 31.7.16 1.3.12 1.9.10 48 Underground Section: Stations and Boxes 1.7.12 1.10.15 1.9.10 70 At level sections 30.6.16 1.7.12 1.9.10 61 System and Rolling stocks 31.10.13 3.2.13 9 Operation and Maintenance tender 15.3.14 17.2.16 65 1.9.10 Rolling stocks   31.8.17 1.5.15 28 Testing and commissioning 1.5.15 31.5.16 Start of south end testing 13 1.5.16 31.8.17 Start of the underground Section testing 16

More Related