Meeting with hon ble chief minister punjab 09 00 am 15 th may 2010
Download
1 / 53

MEETING WITH HON’BLE CHIEF MINISTER, PUNJAB 09:00 AM 15 TH MAY, 2010 - PowerPoint PPT Presentation


  • 120 Views
  • Uploaded on

MEETING WITH HON’BLE CHIEF MINISTER, PUNJAB 09:00 AM 15 TH MAY, 2010. Subject : Strengthening of Health. Department. AGENDA. PRESENTATION BY HOSPITAL SERVICES CONSULTANCY CORP. REGARDING DESIGNS FOR VARIOUS HOSPITALS OVERALL REQUIREMENT OF FUNDS BUILDING WORKS NEW EQUIPMENT

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' MEETING WITH HON’BLE CHIEF MINISTER, PUNJAB 09:00 AM 15 TH MAY, 2010' - adia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Meeting with hon ble chief minister punjab 09 00 am 15 th may 2010
MEETING WITH HON’BLE CHIEF MINISTER, PUNJAB09:00 AM15TH MAY, 2010

Subject : Strengthening of Health

Department


Agenda
AGENDA

  • PRESENTATION BY HOSPITAL SERVICES CONSULTANCY CORP. REGARDING DESIGNS FOR VARIOUS HOSPITALS

  • OVERALL REQUIREMENT OF FUNDS

  • BUILDING WORKS

  • NEW EQUIPMENT

  • FUNDING PATTERN

  • PURCHASE OF MEDICINES

  • REQUIREMENT OF STAFF

  • DOCTORS RECRUITMENT - DEPARTMENTAL SELECTION COMMITTEE HEADED BY PGI FACULTY

  • SURPLUS LAND

  • CONTROL ROOM IN PHSC

  • DOCTORS OPD & POSTING MONITORING SYSTEM

  • EQUIPMENT MONITORING SYSTEM

  • BIO-METRIC ATTENDANCE SYSTEM


2. OVERALL REQUIREMENT

OF FUNDS




FUNDING PATTERN

The following funding pattern was tentatively approved.

Total Fund Requirement- 350.00 Crores





3. BUILDING WORKS

UPGRADATION OF EXISTING HOSPITALS

A. DISTRICT HOSPITAL

@Rs.17 lacs/bed



@ Rs. 5 Cr./CHC

C. UPGRADATION FOR EXISTING CHCs

D. UPGRADATION OF 204 PRIMARY HEALTH CENTRES-

UPGRADATION REQUIRED FOR 204 PHCs @ Rs. 17.0 lacs / PHC = 34.68 Crore

UPGRADATION GRAND TOTAL(A+B+C+D)=71.78 CRORES


CONSTRUCTION OF

NEW HOSPITALS


CONSTRUCTION OF NEW HOSPITALS

@Rs.17 lacs/bed

A. NEW DISTRICT HOSPITALS (PROPOSED)

@Rs.17 lacs/bed

B. NEW SUB-DIVISIONAL HOSPITALS (PROPOSED)


C. NEW CHCs (PROPOSED)

@Rs.5 Cr./CHC



LAND AVAILABILITY

FOR NEW INSTITUTIONS



MAJOR REPAIR

OF EXISTING HOSPITALS


A. MAJOR REPAIR OF DISTRICT HOSPITALS

B. MAJOR REPAIR REQUIRED FOR

22 NUMBERS SUB-DIVISIONAL HOSPITALS = Rs. 4.83 Cr.

(Dasuya, Garhshankar, Mukerian, Anandpur Sahib, Raikot, Samrala, Khanna, Jagraon, Mandi Gobindgarh, Kharar, Chamkour Sahib, Payal, Amloh, Bassi Pathana, Khamano, Dera Bassi, Pathankot).

C. MAJOR REPAIR REQUIRED FOR

31 NUMBER CHCs = Rs. 4.97 Crores

(Mand Mandher, Budha Bar, Hajipur, Tanda, Mahilpur, Sham Charuasi, Bhol Kalota, Nurpur Bedi, Banga, Mukandpur, Saroya, Gurusar Sudhar, Machhiwara, Sidhwan Bet, Sahnewal, Maloud, Pakhowal, Manupur, Dhudike, Bagha Purana, Kurali, Majitha, Narot Jaimal Singh, Jalalabad)

GRAND TOTAL(A+B+C)=14.68 CRORES


4. NEW EQUIPMENT




Major equipment for community health centres rs 20 46 crore
MAJOR EQUIPMENT FOR COMMUNITY HEALTH CENTRES RS.20.46 CRORE

CARDIAC MONITORS WITH DEFIBRILLATOR

PULSE OXYMETER

ECG MACHINES

PHOTOTHERAPY UNITS

RADIANT WARMERS

OPERATION TABLES

MOBILE O.T LIGHTS

ELECTRIC CAUTERY

X-RAY MACHINES

LABORATORY EQUIPMENT

FOETAL DOPPLER

BOYLES APPARATUS

AUTOCLAVE (V)

HOSPITAL FURNITURE


Major equipment for primary health centres rs 10 18 crore
MAJOR EQUIPMENT FOR PRIMARY HEALTH CENTRES RS. 10.18 CRORE

PHOTOTHERAPY UNITS

RADIANT WARMERS

MOBILE O.T LIGHTS

FOETAL DOPPLER

DELIVERY TABLES

SUCTION MACHINES

SURGICAL INSTRUMENT KITS

BINOCULAR MICROSCOPES

OTHER MINOR EQUIPMENT

HOSPITAL FURNITURE

GRAND TOTAL(DH+SDH+CHC+PHC)=RS.66.72 CRORES


5. PURCHASE OF

MEDICINES


5 purchase of medicines
5.PURCHASE OF MEDICINES

MAJOR CHUNK OF MEDICINES ARE BEING PURCHASED FROM CENTRAL PUBLIC SECTOR UNDERTAKINGS.

TO BRING MORE REPUTED COMPANIES, MINIMUM TURNOVER CRITERIA HAS BEEN REVISED FROM RS.5 CR./ANNUM TO RS.15 CR./ANNUM.

MORE STRINGENT TESTING CLAUSES HAVE BEEN PUT

SAMPLES TO BE DRAWN BY PHSC

SAMPLES TO BE TESTED FROM SHRI RAM LAB, NEW DELHI OR NABL ACCREDITED LABS ONLY.


6. REQUIREMENT OF STAFF



6 requirement of staff paramedics
6. REQUIREMENT OF STAFF-PARAMEDICS

* Recruitment Process for 379 posts of Staff Nurses has already been started.



7. DOCTORS RECRUITMENT-

DEPARTMENTAL SELECTION

COMMITTEE HEADED BY

PGI FACULTY


7 doctors recruitment pgi
7. DOCTORS RECRUITMENT - PGI

ADVERTISEMENT FOR THE RECRUITMENT OF FOLLOWING POSTS OF DOCTORS HAS BEEN GIVEN IN VARIOUS NEWSPAPERS ON 02.05.2010 & 14.05.2010.

MEDICAL OFFICERS-SPECIALISTS……………………….128

MEDICAL OFFICERS-GENERAL……………………………214

MEDICAL OFFICERS-DENTAL………………………………..34

The matter regarding the Departmental Selection Committee has been discussed with Dr. K.K. Talwar, Director, PGI and he is of the opinion that already existing Committee headed by Prof. (Retd.) Dr. J.S.Chopra may be retained.


8. SURPLUS LAND











9. CONTROL ROOM

IN PHSC


9 control room in phsc
9. CONTROL ROOM IN PHSC

AT PHSC LEVEL, A CONTROL ROOM WILL BE SETUP TO RECEIVE SUGGESTION & COMPLAINTS 24X7 REGARDING HOSPITAL SERVICES.

CONTROL ROOM WILL BE EQUIPPED WITH

COMPUTERS  FAX  MOBILE  IVRS  INTERNET ETC.

COMPLAINT CAN BE REGISTERED THROUGH WEBSITE, MOBILE, FAX OR TELEPHONE.

HOSPITALS WILL MAINTAIN EQUIPMENT COMPLAINT REGISTERS.

CONTROL ROOM WILL START FUNCTIONING FROM 15.6.2010


10. DOCTORS OPD

&

POSTING MONITORING

SYSTEM


10 doctors opd posting monitoring system
10. DOCTORS OPD & POSTING MONITORING SYSTEM

POSTING OF DOCTORS DISPLAYED ON WEBSITE

DAILY OPD STATUS BEING UPLOADED

LEAVE/ ABSENT/ SPECIAL-DUTY/ TRAINING STATUS ALSO UPLOADED.


11. EQUIPMENT

MONITORING SYSTEM


11 equipment monitoring system
11. EQUIPMENT MONITORING SYSTEM

LIST OF ALL MAJOR EQUIPMENTS UPLOADED ON WEBSITE.

FUNCTIONAL STATUS ALSO BEING DEPICTED.

DAILY USAGE OF EQUIPMENT ALSO ON WEBSITE.


12. BIO-METRIC

ATTENDANCE

SYSTEM


12 bio metric attendance system
12. BIO-METRIC ATTENDANCE SYSTEM

TOTAL 161 INSTITUTIONS INSTALLED.

72 MACHINES MADE FUNCTIONAL.



ad