slide1
Download
Skip this Video
Download Presentation
EU FP7 application for FAIR "preparatory phase" J. Eschke, FAIR JCT

Loading in 2 Seconds...

play fullscreen
1 / 8

EU FP7 application for FAIR preparatory phase J. Eschke, FAIR JCT - PowerPoint PPT Presentation


  • 109 Views
  • Uploaded on

EU FP7 application for FAIR "preparatory phase" J. Eschke, FAIR JCT. Resume FP6 Strategy for FP7: FAIR preparatory phase proposal. EU support for FAIR in FP6 : FAIR Construction of new Infrastructure (CNI) contract , FAIR Design Study , I3HadronPhysics, EURONS. SIS100/ SIS300. SIS18.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'EU FP7 application for FAIR preparatory phase J. Eschke, FAIR JCT' - adem


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

EU FP7 application for FAIR "preparatory phase"

J. Eschke, FAIR JCT

  • Resume FP6
  • Strategy for FP7: FAIR preparatory phase proposal
slide2

EU support for FAIR in FP6:

FAIR Construction of new Infrastructure (CNI) contract,FAIR Design Study, I3HadronPhysics, EURONS

SIS100/SIS300

SIS18

HADES* / CBM I3HadronPhysics

HESR

R3B

Super- FRS

GSI

Accelerator

Facilities

HADES*

PANDA(I3HadronPhysics)

  • Scope of FAIR CNI (DIRAC-Phase-1):
  • FAIR injector SIS18 intensity upgrade,

HADES upgrade + R3Bmagnet

EU-Support: 10,4 M€

  • Scope of FAIR Design Study (DIRAC-secondary-Beams):
  •  secondary beams (RIB and Antiprotons)

EU-Support: 9 M€

  • Integrated Infrastructure Initiatives (I3):
  • I3HadronPhysics: FAIR related EU-Support: 10,8 M€
  • EURONS: FAIR related EU-Support: 2 M€

R3B

NUSTAREURONS

CR

NESR

Total EU FP6 support of 32,2 M€ for FAIR in FP6

very important for the preparatory phase

of the FAIR project

eu fp7 preparatory phase proposal for fair
EU FP7 call for ESFRI roadmap projects

- Scope: support for preparatory phase of all ESFRI roadmap projects

- Total budget of this EU call: 130 M€ for 34 ESFRI project

- Up to 7 M€ EU support per project -- on average 4M€

- Contract duration: 1 – 4 years

- Deadline for submission of proposals: 2 May 2007

Intention and ultimate goal of this EU call

- "Implementation of project"

- Main milestone: signature of construction agreement between partner countries

Main focus of proposal

- Work on legal, organisational (project management), governance, strategic and

financial issues (technical work only under certain conditions)

- EU funding 100% (except for technical work)

It is mandatory to include ministries and / or funding agencies as participants in the proposal

EU FP7 Preparatory Phase proposal for FAIR
slide4

EU FP7 Preparatory Phase proposal for FAIR

  • Suggestion of European Commission for FAIR application
      • Apply for funding of FAIR Joint Core Team personnel and FAIR GmbH personnel
      • Duration of the contract should be two years. This would include also the first year of the FAIR GmbH until the FAIR project is successfully implemented
slide5

Draft: FAIR FP7 proposal in detail

  • Funding for Joint Core Team personnel

~ 38 FTE over two years plus overhead costs for JCT

(travel, committees, consumables,...)

 ~ 6,3 M€ for personnel plus 0,7 M€ for overheads

  • Our suggestion

Funding for JCT personnel

~ 22 existing FTE at GSI, 2 existing FTE at FZ Jülich for HESR

~ 15 FTE from other FAIR member countries

names already proposed from CBM, PANDA, NUSTAR, SPARC and FLAIR and HESR

Institutions and Funding Agencies/Ministries become consortium members

  • Status of draft proposal

- Draft definition of work packages (see overview workpackages)

- Application under preparation by FAIR EU management team

(H. Bokemeyer, J. Eschke, F. Weißbach)

- Proposal preparation in contact with EC liaison officer, C. Kurrer (coordinator of PP Call)

slide6

Overview Work packages

FAIR preparatory phase

EU proposal

slide7

Confirmed participation of Funding Agencies and Ministries

  • Ministry of Science and Higher Education of Poland
  • INFN Italy for the Ministry of Research and University
  • Swedish Research Council
  • Rosatom Russia
  • BMBF Germany
  • Ministry for Research France
  • Ministry for Education Austria
  • Helsinki Institute of Physics for the Ministry of Education of Finland
  • Romanian National Authority for Scientific Research for the Ministry of Research
  • Department of Science and Technology, India
  • Science and Technology Facilities Council, UK
  • Ministry for of Education and Science, Sain
slide8

Nominated international members of FAIR Joint Core Team

Link person country:

Z. Majka, Crakow, Poland

Link persons experiments:

PANDA: G. Boca, Pavia, Italy

S. Tomassini, Accelerator Division at LNF, Frascati, Italy

CBM: R. Karabowicz, Crakow, Poland

D. Dutta, BARC, Mumbai andAnand Kumar Dubey, VECC, India (1 FTE)

D. Cozma and M. Petris, NIPNE, Romania (1 FTE)

S. Belogurov, ITEP, Russia (?)

NUSTAR: Heikki Penttilä, UNIVERSITY OF JYVÄSKYLÄ, Finland

W. Korten, CEA, Saclay, France

C. Mihai and T. Sava, NIPNE, Romania (1 FTE)

C. Pardo, CSIC, Spain (?)

APPA (SPARC, FLAIR,..): M Czarnota, Institute of Physics, Kielce, Poland

Brian O\'Rourke, Belfast, UK

A. Hirtl, SMI, Vienna, Austria

Link persons accelerator:

HESR: B. Gålnander, TSL, Uppsala, Sweden

HESR: D. Prasuhn, COSY, FZ-Jülich, Germany

HESR: A. Lehrach, COSY, FZ-Jülich, Germany

ad