1 / 5

2014 AWA Experiments managed by Jing ---updated on 2/25/2014

2014 AWA Experiments managed by Jing ---updated on 2/25/2014. Experiment 1: 11.7GHz metallic PE @19MeV DL Experiment 2: 91GHz metallic PE @DL Experiment 3: 12GHz DPETS @WL Experiment 4: Pin cathode BD Study @ BDstand Experiment 5: 26GHz DPETS/TBA @DL.

adem
Download Presentation

2014 AWA Experiments managed by Jing ---updated on 2/25/2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2014 AWA Experiments managed by Jing ---updated on 2/25/2014 • Experiment 1: 11.7GHz metallic PE @19MeV DL • Experiment 2: 91GHz metallic PE @DL • Experiment 3: 12GHz DPETS @WL • Experiment 4: Pin cathode BD Study @BDstand • Experiment 5: 26GHz DPETS/TBA @DL

  2. Experiment 1: 11.7GHz metallic PE @19MeV DL Proposed starting date of experiment: 5/1 * This is a high level task assignment. Responsible person manages their own task to meet the deadline. Jing works on each responsible person to regularly get updates.

  3. Experiment 2: 91GHz metallic PE @DL Proposed starting date of experiment: 9/1 * This is a high level task assignment. Responsible person manages their own task, working with secondaries, if needed, to meet the deadline. Jing works on each responsible person to regularly get updates.

  4. Experiment 3: 12GHz DPETS @WL Proposed starting date of experiment: 4/1 * This is a high level task assignment. Responsible person manages their own task, working with secondaries, if needed, to meet the deadline. Jing works on each responsible person to regularly get updates.

  5. Experiment 4: Pin cathode BD Study @BD stand Proposed starting date of experiment: 2/26 * This is a high level task assignment. Responsible person manages their own task, working with secondaries, if needed, to meet the deadline. Jing works on each responsible person to regularly get updates.

More Related