MADHYA PRADESH JAL NIGAM MARYADIT. PRE-TENDER CONFERENCE 18.04.2013 FEED- BACK PROFORMA For Execution of Multi Villages Group Water Supply Schemes in M.P. AIM of CONDUCTING. PRE TENDER CONFERENCE. To aware our probable bidders about the – Scope of works in Jal Nigam.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' MADHYA PRADESH JAL NIGAM MARYADIT' - adanne


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

MADHYA PRADESH JAL NIGAM MARYADIT

PRE-TENDER CONFERENCE

18.04.2013

FEED- BACK PROFORMA

For

Execution of Multi Villages Group Water Supply Schemes in M.P.


AIM of CONDUCTING

PRE TENDER CONFERENCE

  • To aware our probable bidders about the –

  • Scope of works in Jal Nigam.

  • Range of works likely to come.

  • Eligibility criteria for bidders.

  • Conditions under the tenders.

  • And to obtain their valuable suggestions.



COST-WISE BREAKUP OF SCHEMES UNDER PHASE- I

  • Estimated cost V/S No. of Schemes

  • Up to Rs. 25 Cr. - 12

  • More then 25 Cr. up to 50 Cr. - 7

  • More then 50 Cr. up to 100 Cr. - 5

  • More then 100 Cr. up to 150 Cr. - 1

  • More then 150 Cr. up to 200 Cr. - 1

  • Above 200 Cr. - 1


  • Up to 10 - 6

  • > 10 to 25 - 12

  • > 25 to 50 - 6

  • > 50 to 100 - 1

  • > 100 to 150 - 1

  • Above 150 - 1


  • Up to 5 MLD - 18

  • > 5 MLD to 10 MLD - 4

  • > 10 MLD to 15 MLD - 2

  • > 15 MLD to 20 MLD - 1

  • > 20 MLD to 25 MLD - 1

  • Above 25 MLD - 1


Details of Pipes in the Schemes

Size and Length of pipelines

  • Largest and Smallest Diameters in a scheme -

  • Ductile Iron - 500 MM to 100 MM

  • HDPE - 200 MM to 90 MM

  • Maximum and Minimum Lengths of Pipe Lines in a scheme-

  • Ductile Iron - 539 Km to 11 Km

  • HDPE - 325 Km to 28 Km


SAMPLE TENDER

  • EPC contract on Turn-key Job basis giving Lump sum offer including Trial Run and O&M.

  • Execution from Intakewell, at source to House Service Connection up to Consumer-end.


Components of Works

  • Construction of -

  • Intakewell-cum-pump house at source (River or Dam)

  • Pumping equipments and arrangement of power.

  • D.I. Pumping Mains & Gravity Feeder Mains.

  • Water Treatment Plant.

  • Master Balancing Reservoir.

  • Elevated Service Reservoirs and Metallic / HDPE Distribution network in villages.

Cont.……….


Components of Works

  • SCADA

  • Miscellaneous development works including Staff quarters.

  • Trial run of 3 months and O&M for 10 Years.

Cont.……….




Eligibility Criteria

(A) Financial Criteria from 2009-10 to 2011-12

  • Average Turnover -

  • ≥75% of Estimated cost at 2011-12 level

  • Working capital -

  • Credit limit ≥25% of Estimated cost at 2011-12 level

  • Net Worth – Must be +ve

Cont.……….


Eligibility Criteria

(A) Financial Criteria from 2009-10 to 2011-12

  • Joint Venture / Consortium is admissible

  • Qualifications for JV –

  • Lead Partner - At least 51% of above

  • Other partner (s) - Remaining 49%

  • Individual Partner - At Least 26%

  • Firm/JV/Any Partner of JV should not have suffered loss in last three Financial years.

Cont.……….




Eligibility Criteria

(B) EXPERIENCE

  • River Intake work and/or civil engineering infrastructure

  • Projects ≥ 75% designed capacity in single contract.

  • Water Supply Pipe Line Works –

  • Half of the total length of largest dia.

  • Overall quantity laid ≥ Estimated total length of pipelines.

  • (iii) Water Treatment Plant –

  • ≥ 75% of Capacity in single contract.

  • (iv) Clear Water Reservoirs -

    • ≥ 75% of Desired largest Capacity in single contract.

Cont.……….


Eligibility Criteria

(B) EXPERIENCE

(v) Pump Motor Works

≥ 75% of desired Capacity i/c all works in single contract.

(vi) 33kv Electrical Substation –

Should have done in single contract.

Note :- (a) Therefore we are allowing JV of firms.

(b) Similar nature of work up to desired capacity at par or above the minimum requirement – if completed ≥ 75% of work may also be considered.

(c) The completion of work must have been done in stipulated time period.

Cont.……….




Eligibility Criteria

(C) Registration of Bidders

  • May Participate in Tendering Process –

  • - Registration as contractor in Govt. of M.P., PWD in respective class

  • Firms of Repute /contractors/ JV not registered in M.P. PWD will have to get themselves registered in M.P., PWD in respective class before drawl of agreement.

Cont.……….


Eligibility Criteria

(D) Verification of Documents

  • All documents must be get verified from originals.

  • At least a week before last day of issue of tender document




FINANCIAL CONDITIONS UNDER SAMPLE NIT

  • Price quoted shall be inclusive of all taxes & duties.

  • Validity of financial offer – 180 days.

  • No price escalation shall be payable.

  • Workers Welfare Tax @1% shall be deducted from RA Bills.

  • No any advance shall be payable.


FINANCIAL CONDITIONS UNDER SAMPLE NIT

  • Security Deposit @5% of cost of work including EMD shall be deposited in the form of FDR within 10 days from the date of LOA.

  • Refund of SD:- After 60 Months on successful completion, trial run & commissioning.

  • Excise Exemption certificate shall be issued as per GoI rules.




FINANCIAL CONDITIONS UNDER SAMPLE NIT

  • Agreement to be executed within 10 days from LoA.

  • Graduate Engineers & Diploma Engineers must be available at each work site during the execution activity.

  • Deduction @30,000/- p.m. or @20,000/- p.m. if no Graduate engineer or diploma engineer is available at site.

  • Bad work penalty @1% of that part of work for each day of rectification, not exceeding 10 days.


PRICE-BREAKUP SCHEDULE

  • Total offered cost shall be divided in different components of work as per agreement. (on the basis of Estimated cost)

  • Each component of work shall further be sub-divided on the basis of completion of different stages of that work.

  • O&M of scheme shall be 10 years after 3 months of successful trial run.

  • The O&M cost of 1st year shall be determined as one component of work.

  • The O&M cost shall not include cost of energy & chemicals.




PRICE-BREAKUP SCHEDULE

  • Energy charges shall be paid by MPJNM excluding penalties.

  • Cost of chemicals shall be reimbursed on the basis of actual consumption.

  • Rates of reimbursable chemicals shall be as below –

  • On MPLUN rates

  • If not in LUN then DGS&D rates.

  • If not as above then on Proof of actual payment.


PRICE-BREAKUP SCHEDULE

  • For each next year the cost of O&M of first year shall be determined by multiplying a factor as below -

  • After 1th year - 1.10

  • After 2th year - 1.21

  • After 3th year - 1.33

  • After 4th year - 1.46

  • After 5th year - 1.61




PRICE-BREAKUP SCHEDULE

  • After 6th year - 1.77

  • After 7th year - 1.95

  • After 8h year - 2.14

  • After 9th year - 2.35

  • All works & equipment's shall be handed over after 10 years in good running Conditions, duly finished & painted properly.