Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works. Presentation by S.S.A. Bihar. CIVIL WORKS UNDER SSA BIHAR.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'existing staffing and supervisory arrangements for implementation of s.s.a. civil works' - adamdaniel


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Slide1 l.jpg

Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works

Presentation by S.S.A. Bihar


Civil works under ssa bihar l.jpg
CIVIL WORKS UNDER SSA BIHAR Implementation of S.S.A. Civil Works

  • Civil Works is a tool to provide access, retention and quality education to all the children of age group 6-14 years upto elementary level (class I to VIII) as per national norms.

  • Access

    • Additional Class Rooms (ACR).

    • New School Buildings (NSB).

    • Model Cluster Schools under national programme for education of girls at elementary level (NPEGEL).

    • Kasturba Gandhi Balika Vidyalaya (KGBV).


Civil works under ssa bihar3 l.jpg
CIVIL WORKS UNDER SSA BIHAR Implementation of S.S.A. Civil Works

  • Retention

    • Toilets (particularly girls toilets), Hand pump, Kitchen shed, Electrification and child friendly elements (Slide, See-Saw, Swing and Acrobatic bar etc).

  • Quality Education

    • A Block Resource Centre (BRC) in every Block for training of teachers.

    • Cluster Resource Centre (CRC) for 1 day recurring meeting in every month for every teacher.


  • Implementation of ssa in bihar l.jpg
    IMPLEMENTATION OF SSA IN BIHAR Implementation of S.S.A. Civil Works

    • All the civil construction works except BRC and KGBV is carried out by VIDYALAYA SHIKSHA SAMITI (V.S.S.).

    • The VSS is provided technical training and manuals before start of construction work.

    • BRC construction is carried out by BRC construction committee.


    Existing staffing and supervisory arrangements l.jpg
    Existing Staffing and Supervisory Arrangements Implementation of S.S.A. Civil Works

    • State Level Civil Works Management Structure is headed by Civil Works Manager (CWM).

    • CWM is assisted by one experienced Architect, one Assistant Engineer with additional support of State Resource Group Architect/Engineer Members.

    • Executive Engineer at district level with two Assistant Engineers and one Junior Engineer at every 50 Panchayat with additional support of District Resource Group Architect/Engineer members.


    Existing staffing and supervisory arrangements6 l.jpg
    Existing Staffing and Supervisory Arrangements Implementation of S.S.A. Civil Works

    • At sub-district level there is a team of Junior Engineers and Technical Supervisors.

    • The District Magistrate (D.M.) is Chairman of SSA in the district.

    • The additional support of Engineers (other than SSA) have also been provided by D.M. for SSA civil works.

    • One Technical Supervisor is engaged for each 20 construction sites.


    Existing staffing and supervisory arrangements7 l.jpg
    Existing Staffing and Supervisory Arrangements Implementation of S.S.A. Civil Works

    • At present 11 Executive engineers, 28 Assistant Engineers and 79 Junior Engineers are employed in all the districts.

    • The vacant post of A.Es. and J.Es. are in final stage of recruitment process.

    • In the second phase the vacant post of E.Es would be filled up.

    • At present 882 Technical Supervisors are engaged on per site Honorarium basis.


    Existing staffing and supervisory arrangements8 l.jpg
    Existing Staffing and Supervisory Arrangements Implementation of S.S.A. Civil Works

    • The work distribution for district engineering team have been prepared as per Administrative & Geographical condition of the district.

    • Recurrent trainings have been imparted to district engineers at state level.

    • Recurrent training have also been imparted to all the Technical supervisors at district level.


    Existing staffing and supervisory arrangements9 l.jpg
    Existing Staffing and Supervisory Arrangements Implementation of S.S.A. Civil Works

    • 225 nos. of applications were received for the vacant posts of A.Es. and 680 nos of applications received for the vacant post of J.Es.

    • The received applications for the post of A.Es and J.Es have been shortlisted.

    • The state Executive committee held on 07.08.2009 decided to conduct written test for selection of A.Es and J.Es in September October, 2009.

    • The vacant posts of A.Es and J.Es. would be filled up very shortly.


    Role of technical supervisory for implementation of s s a civil works l.jpg
    Role of Technical Supervisory for implementation of S.S.A. Civil Works

    • To impart training to V.S.S./Ad hoc Committee members regarding all aspects construction work such as drawings and estimates etc.

    • To acquaint VSS/Ad hoc Committee members regarding purchase of quality building materials.

    • To ensure the maintenance of Cash Book, Muster roll, Stock Book, Receipt and Expenditure Register, Site Order Book etc, by V.S.S.


    Role of technical supervisory for implementation of s s a civil works11 l.jpg
    Role of Technical Supervisory for implementation of S.S.A. Civil Works

    • Entry of technical observations during construction work in site order book and its compliance by V.S.S. /Ad hoc committee.

    • To impart training to V.S.S./Ad hoc Committee regarding preparation of Statement of Expenditure (SOE) for expenditure incurred on building construction works

    • To enter measurement of the work done in Measurement Books.


    Supervisory arrangements for third party evaluation for implementation of s s a civil works l.jpg
    Supervisory Arrangements for Third Party Evaluation for Implementation of S.S.A. Civil Works

    • The national level tender published for Third Party Evaluation works.

    • Out of 9 agencies who applied for 27 district, 6 agencies have technically and financially qualified for 21 districts.

    • 6 agencies have been engaged for Third Party supervision, monitoring and quality evaluation in the 21 districts of Bihar for construction works under AWP&B 2008-09 and 2009 -10.

    • The Third Party Evaluators have started submitting site visit reports.


    Slide13 l.jpg

    Supervisory Arrangements for Third Party Evaluation for Implementation of S.S.A. Civil Works


    Slide15 l.jpg

    Supervisory Arrangements for Third Party Evaluation for Implementation of S.S.A. Civil Works


    Slide16 l.jpg

    The technical training of all E.E. /A.E. , BEPC (SSA) at SLO, Patna

    Inauguration by Sri Rajesh Bhushan, I.A.S., SPD, BEPC, Patna


    Slide17 l.jpg

    The technical training of all Technical Supervisors /J.E., BEPC at District Level Office

    Inauguration by D.M. of district


    Slide18 l.jpg

    The Technical Training of all Bhawan Nirman Samitee (Part of V.S.S. Members) BEPC (SSA)

    at Block Level Office Inauguration by DSE-cum-DPC. of District


    Slide19 l.jpg

    Photograph of School Building under Construction of V.S.S. Members) BEPC (SSA)

    M.S. Sansariya, Nautan Block,W. Champaran (4Room ACR)


    Photograph of school building under construction l.jpg
    Photograph of School Building under Construction of V.S.S. Members) BEPC (SSA)

    M.S. Madhubani District(4Room ACR)


    Photograph of brc constructed l.jpg
    Photograph of BRC Constructed of V.S.S. Members) BEPC (SSA)

    Block Resource Centre at Muzafarpur


    Photograph of crc constructed l.jpg
    Photograph of CRC Constructed of V.S.S. Members) BEPC (SSA)

    Cluster Resource Centre at Bhagalpur District


    Photograph of constructed school building under ssa l.jpg
    Photograph of Constructed School Building under SSA of V.S.S. Members) BEPC (SSA)

    M.S. Parvati Girls, Ram nagar Block, W. Champaran (3 Room ACR)


    Photographs of constructed kitchen shed l.jpg
    Photographs of Constructed Kitchen Shed of V.S.S. Members) BEPC (SSA)

    Kit. Shed at M.S. Parvati Girls, Ram nagar Block

    Kit. Shed at M.S.Segari Bahuari, Ram nagar Block


    Slide25 l.jpg

    THANK YOU of V.S.S. Members) BEPC (SSA)