Tentative MICE schedule

Tentative MICE schedule . Optimism is…*. *delay. **delay. ***delay. *Elastic Funding Start!. Risk Limitation - Milestones. Muon Beam & Muon Beam Infrastructure Tracker development for 1 st MICE stages Finalise design work for focus coils & tracker R&D for Hydrogen system

abla
Download Presentation

Tentative MICE schedule

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tentative MICE schedule Optimism is…* *delay **delay ***delay *Elastic Funding Start!

  2. Risk Limitation - Milestones • Muon Beam & Muon Beam Infrastructure • Tracker development for 1st MICE stages • Finalise design work for focus coils & tracker • R&D for • Hydrogen system • safety/operational risk reduction • Cryocooler system • Heat leaks in high Tc Current leads • Absorber cooling model • RF System • Reuse of old equipment – is it ok? • Tracker & Focus Coils production in time with MICE stages

  3. WBS Structure • Top Level Sheet • Tasks Reflect Risk Limitation Milestones • Task Levels 1 down to 2 or 4 • Detailed project-sheet for each sub-task

  4. WBS

  5. WBS Information Capital: - Cost - Contingency Task Duration Task Work: - days - who  cost Task dependencies Gantt Chart Working Margin Project Contingency

  6. Documents for Review • Project Specification • Project Plan (including) • Risk Register • WBS spreadsheets • Technical Reference Document • Aim for 24th October