jsk incorporated
Download
Skip this Video
Download Presentation
JSK Incorporated

Loading in 2 Seconds...

play fullscreen
1 / 21

JSK Incorporated - PowerPoint PPT Presentation


  • 59 Views
  • Uploaded on

JSK Incorporated. Location Factors. Community Considerations (30%) Green attitude Size Middle-age and Families present Tax breaks on eco-friendly companies. Location Factors. Proximity to Supplier (25%) Compete on Quality Establish an efficient working relationship

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' JSK Incorporated' - abel-casey


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
location factors
Location Factors
  • Community Considerations (30%)
    • Green attitude
    • Size
    • Middle-age and Families present
    • Tax breaks on eco-friendly companies
location factors1
Location Factors
  • Proximity to Supplier (25%)
    • Compete on Quality
    • Establish an efficient working relationship
    • Eliminate unnecessary travel times- creating quick turn around time to customer
location factors2
Location Factors
  • Proximity to a University (20%)
    • Compete on innovation
    • Research resources available
    • Employment from graduating students
    • Help maintain employees
      • Growing community
      • Entertainment available
      • School for children of employees
location factors3
Location Factors
  • Quality of Life (15%)
    • Low crime rate
    • Good schools
    • Churches
    • Restaurants
    • Sports and Entertainment
location factors4
Location Factors
  • Price (10%)
    • Reasonable
    • Tax breaks
    • Upkeep
location site a
Location Site A

Location: 1254 S. Main Street

Cost: $250,000

Square Footage: 8,000 sq. ft

location site b
Location Site B

Location: 5247 N. Jacob Street

Cost: $250,000

Square Footage: 5,000 sq. ft

location site c
Location Site C

Location: 6987 East Georgia Avenue

Cost: $300,000

Square Footage: 8,000 sq. ft

value chain
Value Chain
  • Draft blueprint with dimensions for molds
  • Create mold for basic product
  • Negotiate contract with United Plastic Recycle
  • Financing
  • Green Education and Training
  • Product Advertising
  • Pi ck up raw materials for production

Pre-Production Production Post-Production

  • Create basic and custom product
  • Inspection and safety testing
  • Value and Productivity
  • Packaging
  • Transportation and Shipping Services
  • Warranty and Claim Services
  • Customer Reviews and Online Feedback
  • Warehouse and Inventory Management
supply chain
Supply Chain

Suppliers

Plant

Intermediaries

Customers

Petroleum

Injection

Molding

Product

Distribution

Customers

United Plastics

Molded, Tested/Completed Product

Finished Products

ORCO

Online Orders

Customizable Parts & Accessories

Other

Parts

SCM Process

Manage Supply

Plan Supply Chain/Produce Product

Distribution

Manage Orders/Feedback

selection process
Selection Process
  • Value Chain
    • Proximity to Supplier
      • Gain and maintain relationship
    • Proximity to Alabama State University
      • Research and Innovation
  • Supply Chain
    • Proximity to Supplier
      • Pick up Raw Materials
facility layout
Facility Layout
  • Hybrid Style Layout
    • Process line production
      • Flexibility of injection model machine allows
        • Online Individual customization from product design
    • Product line production
        • Retail Bulk Orders
facility layout1
Facility Layout
  • Product Layout
    • Layout calls for 5.25 min duration for each unit using 3 employees working 40hr/wk.
    • Equates to 11 units per hour (60min/5.25); 440 units a week (11units * 40hr/wk)
    • Breakeven analysis called for 257 units a week
just in time operations
Just In Time Operations

Benefits of JIT

  • Smaller Inventories
    • Reduced WIP
    • Reduced Space Requirements
  • Shorter Lead Times
  • Increased Quality
  • Increased Productivity
  • Increased Flexibility
  • Lower Production Cost

Five Lean/JIT Principles

  • Eliminate Waste
  • Increase Speed and Response
  • Improve Quality
  • Reduce Cost
  • Maintain respect for all workers

Increased Net Profit

just in time applied concepts
Just In Time Applied Concepts
  • Eliminate Waste
    • Requires good housekeeping by employee(s)
  • Minimal waste in assembly
    • Recycling of plastic shavings
    • Pre-portioned dye
  • Hybrid layout eliminates “people waste”
    • No wait time between jobs
    • No unnecessary material handling or stalled work flow
    • Layout reduces travel distances between jobs
just in time applied concepts1
Just In Time Applied Concepts
  • Improved Quality
    • Innovation
      • Research through Alabama State University
      • Online Customer Feedback
    • Goal- Zero Defects
      • Inspection Team before Packaging
      • Continuous Improvement
just in time applied concepts2
Just In Time Applied Concepts
  • Improve Flexibility
    • Flexible batch sizes to fit customers needs
    • Assures order times are accurate and efficient
    • Makes worker’s time more valuable because they are always working on paid orders
ad