MODAPS PIP Report

MODAPS PIP Report. August 11, 2009. 1-877-711-1856 759461. Summary of MODAPS Production 8/11. Forward Processing C5, 5.1 and 4.1: Terra forward processing is as close to real time as possible; Aqua is 2 days behind

abby
Download Presentation

MODAPS PIP Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MODAPS PIP Report August 11, 2009 1-877-711-1856 759461

  2. Summary of MODAPS Production 8/11 • Forward Processing C5, 5.1 and 4.1: • Terra forward processing is as close to real time as possible; Aqua is 2 days behind • There was a delay in receiving the new PGE01 LUT for the Aqua maneuver on day 218 • We are reprocessing PGE41 (MCD12Q1), C5 Land Cover Quarterly processing for years 2002-2007 • Years 2002-2005 have completed • We have processed PGE87 (MCD12Q2), C5 Land Cover CMGs through year 2006 • We have completed production of PGE42 (MCD12C1) for years 2001-2007 • Collection 5.1 Burned Area Reprocessing • The leading edge for this reprocessing is at day 2003/198.

  3. Summary of PGE Deliveries to SDST (8/11) Collection 5 • Atmospheres: • A pre-delivery of the Terra Deep Blue PGEs was received on July 22. • We are expecting a new version of PGE69 for Aqua C5.1 Mandriva this week. • Work is continuing on a new version of PGE06 for Mandriva. • Land: • A new version of PGE11(LSR) for Mandriva was delivered. Collection 6 • Level 1: • A new version of PGE02 (L1b) for Terra and Aqua has been baselined. • Land: • We have received the collection 6 versions of PGE16 (LST), PGE75 (daily CMG), PGE21 (8-day Surface Reflectance), PGE90 (Aeronet Subsetter) and PGE11(LSR)

  4. Summary of Science Testing (8/11) • Atmospheres: • Results of science tests for PGE69 Terra Mandrake and Mandriva have been approved. • A science test for PGE69 Aqua Mandrake and Mandriva will be run in parallel with forward processing. • Land Science Testing: • A science test for PGE72 (for land water mask) is running. Nine of 12 16-day periods have completed. This is expected to complete by the end of this month. • We have completed generating a 1-year test data set of C6 PGE11(LSR) and PGE75(CMG) to be used for collection 6 science testing. • Test results for C6 PGE16 are under review by Dr Wan. • L1 Science Testing: • A second science test for C6 PGE01 was processed through LSR and control points and is under review. • Mandriva Science Testing: • PGEs 01, 02, 03, 07, 08, 43 and 44 have passed Mandriva testing. • PGEs 60 (C5) and 90 (C5 and C6) have completed science testing and are under review. • A chain test from L0 through the land dailies has completed and is under review. The LSR and L1b destriper codes are still being reviewed. • Land PGEs are being tested using inputs generated on the Mandrake system • PGE 33 is being reviewed by the developer • PGEs 3,7,8,11,12,13,14,15,22,43,44,46,75,80 and 84 were tested. • A second science test for PGE16 completed and failed. Test results have been forwarded to the developer. • Tests for 8- and 16-day PGEs completed; PGEs 21,45,31,58,25,35,29 and 34 passed, PGE72 failed. • Work is continuing on the atmospheres PGEs.