ECO 203 UOP
This presentation is the property of its rightful owner.
Sponsored Links
1 / 8

ECO 203 Ash Material - eco203dotcom PowerPoint PPT Presentation


ECO 203 is an online course which provides you to get best results.

Download Presentation

ECO 203 Ash Material - eco203dotcom

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Eco 203 ash material eco203dotcom

ECO 203 UOP Material

ECO203dotcom


Eco 203 ash material eco203dotcom

ECO 203 UOP Material

ECO 203 Entire Course (All Labs and Quizzes) (Devry)

ECO 203 Lab 1 Using the Serial Communication

ECO 203 Lab 1 Using the Serial Communication Interface in a Microcontroller

ECO 203 Lab 2 Temperature Measuring System using a Microcontroller

ECO 203 Lab 3 Traffic Light Control Using Finite State Machines (FSM)

ECO 203 Lab 4 Servo Control Using Pulse Width Modulation (PWM)

ECO 203 Lab 5 Servo Motor Interfaces-Closed-Loop Motor Speed Control

ECO 203 Lab 6 Servo Motor Interfaces-Closed-Loop Motor Speed Control

ECO 203 Weeks 2-6 Quizzes

Lab 1 of 6: Using the Serial Communication Interface in a Microcontroller

Submit your assignment to the Dropbox located on the silver tab at the top of this page.

(See Syllabus section Due Dates for Assignments & Exams for due dates.)

L A B O V E R V I E W

Scenario/Summary

1. To use the built-in COM port and understand how it sends and receives serial data using the RS-232 communication standard


Eco 203 ash material eco203dotcom

ECO 203 UOP Material

ECO 203 Lab 2 Temperature Measuring

ECO 203 Lab 3 Traffic Light Control Using

Lab 2 of 6: Temperature Measuring System using a Microcontroller

Submit your assignment to the Dropbox located under the silver tab at the top of this page.

(See Syllabus section Due Dates for Assignments & Exams for due dates.)

Lab 3 of 6: Traffic Light Control Using Finite State Machines (FSM)

Submit your assignment to the Dropbox located under the silver tab at the top of this page.

See Syllabus section Due Dates for Assignments & Exams for due dates.

L A B O V E R V I E W

Scenario/Summary


Eco 203 ash material eco203dotcom

ECO 203 UOP Material

ECO 203 Lab 4 Servo Control Using Pulse

ECO 203 Lab 5 Servo Motor Interfaces-Closed-Loop

Lab 4 of 6: Servo Control Using Pulse Width Modulation (PWM)

Submit your assignment to the Dropbox located under the silver tab at the top of this page.

(See Syllabus section Due Dates for Assignments & Exams for due dates.)

Lab 5 of 6: Servo Motor Interfaces-Closed-Loop Motor Speed Control

Submit your assignment to the Dropbox located under the silver tab at the top of this page.

(See Syllabus section Due Dates for Assignments & Exams for due dates.)

L A B O V E R V I E W

Scenario/Summary


Eco 203 ash material eco203dotcom

ECO 203 UOP Material

ECO 203 Lab 6 Servo Motor Interfaces-Closed-Loop

ECO 203 Week 2 Quiz (Devry)

Lab 6 of 6: Servo Motor Interfaces-Closed-Loop Motor Speed Control

Submit your assignment to the Dropbox located under the silver tab at the top of this page.

See Syllabus section Due Dates for Assignments & Exams for due dates.

L A B O V E R V I E W

Scenario/Summary

The course project involves the design, debugging, and building of hardware and software for a wireless servo driven robot.

1. Question : (TCO #5) Identify the step size for an 8-bit analog-to-digital converter with Vref= 2.5 VDC?

Student Answer:

10 millivolts

25 millivolts

4.9 millivolts

5 volts

Comments:

2. Question : (TCO # 5) How many steps are available with a 10-bit ADC?


Eco 203 ash material eco203dotcom

ECO 203 UOP Material

ECO 203 Week 3 Quiz (Devry)

ECO 203 Week 4 Quiz (Devry)

1. Question : (TCO #3) Which interrupt is non-maskable?

Student Answer:

Software interrupt (SWI)

Interrupt from a device connected to IRQ pin of HCS12 microcontroller

Both A and B

Interrupt by multiple devices connected to IRQ pin of HCS12 microcontroller

1. Question : (TCO #1, 2, and 7) Select the header file in CodeWarrior for the Freescale MC9s12DG256.

Student Answer:

mc9s12dg256.h

mc9s12dg256.header

mc9s12dg256.asm

mc9s12dg256

Comments:

2. Question : (TCO #1, 2, and 7) _____ is part of the UNIX OS user layer.


Eco 203 ash material eco203dotcom

ECO 203 UOP Material

ECO 203 Week 5 Quiz (Devry)

ECO 203 Week 6 Quiz (Devry)

1. Question : (TCO #5) In an asynchronous data transfer _____.

Student Answer: the transmitter and receiver clock must be exactly the same all the time

the receiver clock must be exactly the same or multiple times the transmitter clock

it is not necessary to have a clock in the receiver

None of the above

1. Question : (TCO #6) How many 16-bit PWM channels are available in the Freescale 9S12DG256 microcontroller?

Student Answer:

Two

Four

Seven

Eight

Comments:

2. Question : (TCO #6) When concatenating the two 8-bit PWM Channels 3 and 2 to get a 16-bit PWM channel, _____ becomes the low-order byte.


Eco 203 ash material eco203dotcom

ECO 203 UOP Material


  • Login