Whitestown Utilities Water Update. February 26, 2007. It’s NOT Just Whitestown. Whitestown North Water System. Original Town Boundaries and then extended to Walker Farms Served by wells and existing water tower Water lines installed in early 1950’s

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'whitestown utilities water update' - Thomas


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Whitestown utilities water update l.jpg

Whitestown Utilities Water Update

February 26, 2007



Whitestown north water system l.jpg
Whitestown North Water System

Original Town Boundaries and then extended to Walker Farms

  • Served by wells and existing water tower

  • Water lines installed in early 1950’s

  • Original town water pipes undersized and need replacing

  • Walker Farms water lines are new and the proper size


Whitestown south water system l.jpg
Whitestown South Water System

Created by the purchase of BCU in July, 2004

  • Includes Anson and additional annexed areas

  • Water purchased from IWC (Indianapolis Water Company / Veolia Water)

  • Subject to IWC rate increases

  • Lines are appropriately sized to new construction standards


Recent updates to north system l.jpg
Recent Updates to North System

  • Increased the capacity of the water system

  • Eliminated use of ozone oxidation system – Sept 2006

  • Installed additional filters – Oct 2006

  • Completed Linville loop – Jan 2007

  • Chemically cleaned existing filters – Feb 2007

  • Maintaining flushing schedule


Upcoming improvements to north system l.jpg
Upcoming Improvements to North System

  • Preparing to change disinfection method to maintain a more uniform disinfection residual in the system

    • Reducing disinfection by-products (TTHM and HAA5)

  • Increasing production from the existing wells

  • Working to acquire additional well fields


Upcoming improvements to north system7 l.jpg
Upcoming Improvements to North System

  • Expand existing water plant

  • ‘Loop’ water line from Perry Worth School

  • Replacement of undersized water lines in Whitestown

  • Replacement of manually read water meters to digital read water meters


Proposed upcoming improvements to south system l.jpg
Proposed Upcoming Improvements to South System

Predicated by obtaining funding:

  • Add an additional 300,000 - 500,000 gallon water tower

  • Installation of a connection line between North and South Systems

  • Review of all construction plans to eliminate dead-ends


How are we going to pay for this l.jpg
How Are We Going To Pay For This?

  • We entered the funding process with the state and are requesting funding through the State Revolving Fund programs (SRF)

    • Hoping to receive funding in April “Pool” program

  • Researching grants to assist in the water line replacement

    • Awarded mid-summer


Other funding options l.jpg
Other Funding Options

  • Raise water rates

  • Raise connection fees

  • Raise capacity fees

  • Investigate other area rate structures – based on cost of providing service