commercial fire
Download
Skip this Video
Download Presentation
Commercial Fire

Loading in 2 Seconds...

play fullscreen
1 / 19

commercial fire - PowerPoint PPT Presentation


  • 197 Views
  • Uploaded on

Commercial Fire. 1820 S. Grand Ave. 8/15/09 1901 hrs. “Four Sides”. Construction. Size-Up. Heavy Smoke from these windows. What is your Size-up as the first-in Fire Company? Listen to Size-up from this fire. FIRE ATTACK “Heads Up” Action by E-10. “Read” smoke conditions (LISTEN)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'commercial fire' - Thomas


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
commercial fire

Commercial Fire

1820 S. Grand Ave.

8/15/09

1901 hrs

size up
Size-Up

Heavy Smoke from these windows

What is your Size-up as the first-in Fire Company?

Listen to Size-up from this fire

fire attack heads up action by e 10
FIRE ATTACK“Heads Up” Action by E-10
  • “Read” smoke conditions (LISTEN)
  • Good communication
  • Good Situational Awareness
  • Frequent updates to roof and IC
laddering7
Laddering

TALKING POINTS

  • Apparatus placement
    • Pre ’33
    • Large commercial
    • Are you throwing your aerial?
    • Anticipating heavy streams?
  • When is adjacent building an option?
  • How high do you want YOUR ladder?
  • Ladder for a ‘way off’ not just ‘way up’
ventilation9
Ventilation

TALKING POINTS

  • Your Truck Co. SOG’s on bowstring arch roof (arch truss)
  • Construction characteristics?
    • Lumber sizes for trusses
    • Truss spacing?
    • Rafter size and spacing?
  • Safe areas of roof?
  • Potential hazards?
  • What communication needs to take place between 2nd Truck and 1st Truck?
other hazards
Other Hazards

“Vent” along 13” Parapet

(used to release heat from URM buildings)

“Vent” along 13” Parapet

forcible entry
Forcible Entry

Locks or tabs cut and door raised with chain

forcible entry14
Forcible Entry

Tab cut and door opened

forcible entry15
Forcible Entry

TALKING POINTS

  • What is Forcible Entry?
  • What do you open?
  • Know where co’s are assigned to priortize your F.E. operation. (Listen)
  • What is YOUR operation for this building?
ad