Incorporating uncertainty analysis into forecasting
Download
1 / 6

Example: Forecast Build-up - PowerPoint PPT Presentation


  • 389 Views
  • Updated On :

Incorporating Uncertainty Analysis into Forecasting. Group Discussion AMPO Travel Modeling Work Group Chicago, Illinois October 1, 2009. Why Bother?. A new way of thinking about forecasting Insights, not just model mechanics Range of possible outcomes

Related searches for Example: Forecast Build-up

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Example: Forecast Build-up' - Sophia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Incorporating uncertainty analysis into forecasting l.jpg

Incorporating Uncertainty Analysis into Forecasting

Group Discussion

AMPO Travel Modeling Work Group

Chicago, Illinois

October 1, 2009


Why bother l.jpg
Why Bother?

A new way of thinking about forecasting

Insights, not just model mechanics

Range of possible outcomes

Another approach for quality control checks

Information for decision makers

Upper/lower bound, most likely

Honesty in presentation of forecasts

Predicted-versus-actual outcomes

AMPO Travel Modeling Work Group Meeting

2


Example forecast build up l.jpg
Example: Forecast Build-up

  • Series of forecasts for:

    • Today

    • Plus future transit network

    • Plus new transit behaviors

    • Plus future trip tables

    • Plus future highway congestion

    • Plus future parking costs

    • Plus alternative land use (?)

Choice riders

Park/ride etc.

Guideway effects

AMPO Travel Modeling Work Group Meeting


Example honolulu rail study l.jpg
Example: Honolulu Rail Study

Notes:

- Transit demand ’05a is the 2005 on-board survey.

- Bus speeds ’05+ are based on highway speeds from the assignment of 2005 person trips onto the 2030 highway network.

- Highway speeds ’30- are from the assignment of 2030 person trips onto the 2005 highway network.

AMPO Travel Modeling Work Group Meeting


Example specifications l.jpg
Example Specifications

AMPO Travel Modeling Work Group Meeting


Discussion points l.jpg
Discussion Points

Model documentation

Assessment of model plausibility

What it does/does not know well

Markets, modes, behaviors

Results of forecast tests

Consistency with similar projects

Key drivers of the forecasts

Demographic/network inputs

Alternative assumptions

AMPO Travel Modeling Work Group Meeting

6