Slide1 l.jpg
This presentation is the property of its rightful owner.
Sponsored Links
1 / 59

STEEPLECHASE TOOL AND DIE ESTIMATING PowerPoint PPT Presentation


  • 267 Views
  • Updated On :
  • Presentation posted in:

STEEPLECHASE TOOL AND DIE ESTIMATING. MODEL LC22 ESTIMATING LAYOUT. FLAT BLANK LAYOUT FROM FASTBLANK SOFTWARE. STEEPLECHASE TOOL AND DIE DESIGN FULL SOLID MODEL DESIGN MASTERCAM VER.”X2” WITH DYNA-FORM 3-D SIMULATION WITH LS-DYNA SOLVER. INITIAL PART DESIGN. PART PROCESS LAYOUT.

Related searches for STEEPLECHASE TOOL AND DIE ESTIMATING

Download Presentation

STEEPLECHASE TOOL AND DIE ESTIMATING

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Steeplechase tool and die estimating l.jpg

STEEPLECHASE TOOL AND DIEESTIMATING


Slide11 l.jpg

MODEL LC22 ESTIMATING LAYOUT


Slide12 l.jpg

FLAT BLANK LAYOUT FROM FASTBLANK SOFTWARE


Slide13 l.jpg

STEEPLECHASE TOOL AND DIEDESIGNFULL SOLID MODEL DESIGNMASTERCAM VER.”X2”WITH DYNA-FORM3-D SIMULATION WITH LS-DYNA SOLVER


Slide14 l.jpg

INITIAL PART DESIGN


Slide15 l.jpg

PART PROCESS LAYOUT


Slide16 l.jpg

COMPLETED DESIGN SOLID MODELING

LOWER DIE


Slide17 l.jpg

COMPLETED DESIGN SOLID MODELING

UPPER HALF OF DIE


Slide18 l.jpg

COMPLETED 3-D SOLID MODELING DESIGN


Steeplechase tool and die computer aided programing l.jpg

STEEPLECHASE TOOL AND DIECOMPUTER AIDEDPROGRAMING


Slide20 l.jpg

CNC PROGRAMING VERIFICATION


Steeplechase tool and die cnc machining with 4th axis capabilities l.jpg

STEEPLECHASE TOOL AND DIE CNC MACHININGWITH 4TH AXISCAPABILITIES


Slide27 l.jpg

20,000 SQ FT ASSEMBLY & TRYOUT AREA WITH 4 TRYOUT PRESSES WITH COIL HANDELING UP TO 72” WIDTH FOR LINE, PROGRESSIVE, AND TRANSFER TOOLING.


Steeplechase quality and cmm department l.jpg

STEEPLECHASE QUALITY ANDCMM DEPARTMENT


Examples of tooling l.jpg

EXAMPLES OF TOOLING


Slide34 l.jpg

YEAR 2008

LC22 CHALLENGER UPPER DOOR PANEL R & LH

CAR POSITION


Slide35 l.jpg

YEAR 2008

LC22 CHALLENGER

UPPER DOOR PANEL R & LH


Slide36 l.jpg

MODEL GMT 345 (2007 H3 HUMMER) ENGINE SHIELD 4.50 THK ALUMINUM


Slide38 l.jpg

YEAR 2007 MODEL MK74

TROUGH LIFTGATE DRAIN R & LH

CAR POSITION


Slide39 l.jpg

YEAR 2007 MODEL MK74 8 STATION TRANSFER COMPLETE RIGHT AND LEFT HAND.

TROUGH LIFTGATE DRAIN RIGHT AND LEFT HAND


Slide41 l.jpg

YEAR 2007 MODEL JK TRANSFER REINF.-”B” PILLAR R & LH

CAR POSITION


Slide42 l.jpg

YEAR 2007 MODEL JK 8 STATION DOUBLE TRANSFER COMPLETE. REINF.-”B” PILLAR RIGHT AND LEFT HAND


Slide44 l.jpg

YEAR 2007 MODEL JK

CROSSMEMBER R & LH

CAR POSITION


Slide45 l.jpg

YEAR 2007 MODEL JK 10 STATION PROG. DIE CROSSMEMBER R & LH


Slide47 l.jpg

YEAR 2005 MODEL KJ

REINF. HOOD LATCH SUPPORT

CAR POSITION


Slide48 l.jpg

YEAR 2005 MODEL KJ REINF. HOOD LATCH SUPPORT. 10 STATION PROG. COMPLETE


Slide50 l.jpg

MODEL GMX 245 Z06 CORVETTE

UPPER AND LOWER CROSSOVER “X” PIPE

CAR POSITION

1.20 MM THICK STAINLESS STEEL STOCK


Slide51 l.jpg

MODEL GMX 245

UPPER AND LOWER CROSSOVER “X” PIPE

6 STATION INTERCHANGEABLE TRANSFER


Slide53 l.jpg

MODEL GMX 381

MARTINCITE MATERIAL 2.50 MM THK

DOOR BEAM UPPER AND LOWER

“3” DIFFERENT TUBE DIAMETERS


Slide54 l.jpg

MODEL GMX 381

DOOR BEAM TUBES

INTERCHANGEABLE WALKING BEAM TRANSFER FOR “3” DIFFERENT DIAMETER TUBES


Slide56 l.jpg

MODEL GMX 211-IMPALA

REINF.-FLOOR PNL #3 C/BAR

2.50 MM THICK HR270 HIGH STRENGTH


Slide57 l.jpg

MODEL GMX 211-IMPALA

REINF.-FLOOR PNL #3 C/BAR

8 STATION TRANSFER COMPLETE


Slide59 l.jpg

MODEL GMX 384 REAR TRUNK GUTTER ASSEMBLY


  • Login