THE CORRUPT U.S. ARMY CONTRACTING COMMAND
This presentation is the property of its rightful owner.
Sponsored Links
1 / 2

Blog 45 USMC 20150725 Gansler Commission PowerPoint PPT Presentation


The Secretary of the Army established an independent Commission on Army Acquisition and Program Management in Expeditionary Operations to review the lessons learned in recent operations and provide forward-looking recommendations to ensure that future military operations achieve greater effectiveness, efficiency, and transparency. The following key failures encumber the Army acquisition system’s performance and have significantly contributed to the waste, fraud, and abuse in-theater by Army personnel. Specifically: Financial management , Civilian and military personnel, Contracting and Contract management, Training and education and Doctrine,regulations, and processes

Download Presentation

Blog 45 USMC 20150725 Gansler Commission

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Blog 45 usmc 20150725 gansler commission

THE CORRUPT U.S. ARMY CONTRACTING COMMAND

CHEATING U.S. VETERAN OWNED SMALL BUSINESSES

CHEATING SERVICE DISABLE VETERAN OWNED SMALL BUSINESSES

CHEATING U.S. SMALL BUSINESSES

Gansler Commission:

Dr. Jacques S. Gansler

David J. Berteau

David M. Maddox

David R. Oliver Jr.

Leon E. Salomon

George T. Singley III, :

The culture of corruption in Iraq and Kuwait.


Blog 45 usmc 20150725 gansler commission

Gansler

Commission_Report_Final_

Report_10-31-07.pdf

FRAUD TRIANGLE.pdf

THE SMOKE SCREEN THAT DUPED CONGRESS INTO CREATING THE ARMY CONTRACTING COMMAND. CAMP ARIFJAN AND ROCK ISLAND STILL HAVE AN

ONGOING CORRUPTION PROBLEM; CIRCUMVENTING THE COMPETITION IN CONTRACTING ACT BY BILLIONS OF DOLLARS A YEAR; CONCEALING

SOLICITATIONS; NOT RELEASING SOLICITATIONS WHEN REQEUSTED; CONCEALING AS-BUILT DRAWINGS; SHORT SUSPENSE SOLICITATIONS THAT ARE

DESIGNED TO STEER CONTRACTS TO PRE-SELECTED BIDDERS; AND HAVE A RECORD NUMBER OF CONTRACTING OFFICERS THAT HAVE GONE TO JAIL

AND HAVE BEEN TRANSFERRED, OR DISMISSED. THEY ARE STILL RELIANT ON CACI AND DON’T HAVE ANYMORE CONTRACTING OFFICERS NOW, THAN

WHEN MAJOR JOHN COCKERHAM WAS RUNNING HIS CRIMINAL ENTERPRISE AT THE 408THON CAMP ARIFJAN. THIS SITE WILL BE A PORTAL TO SHOW

THAT THE ARMY IS STILL AS CORRUPT IN KUWAIT NOW, AS IT WAS IN 2003, 2004, 2005, 2005, 2006, AND 2007. THE 408THWAS POSTING

SOLICITATIONS ON THE FEDERAL ACQUISITION REGULATIONS ONLY APPROVED GOVERNMENT POINT OF ENTRY BEFORE MAJOR COCKERHAM AND

STILL ARE NOT POSTING TO FEDBIZOPPS.

THIS REPORT OF DR. GANSLER’s RELIED ON INTERVIEWS 408THMEMBERS WHO AND ARMY OFFICIALS WHO DIDN’T WANT THEIR IMAGE TARNISHED. IT

RELIED ON CORPORATIONS WHO HAVE CONTRACTS IN KUWAIT. THIS REPORT DOESN’T MENTION ONE SINGLE CONTRACTING OFFICER FROM MAJOR

JOHN COCKERHAM’s CRIMINAL ENTERPRISE. THAT IS WHAT CAMP ARIFJAN WAS THEN, AND STILL IS NOW. FOR THIS REPORT TO NOT MENTION

COCKERHAM ONCE IS A SCAM ALL BY ITSELF.

ONE QUESTION TO THE US AIR FORCE’S OSI REGARDING 386 ECONS AT ALI AL SALEM. HOW COULD 23 CONTRACTING OFFICERS GO TO JAIL FROM

CAMP ARIJAN LOCATED JUST 40 MILES AWAY FROM ARIFJAN IN KUWAIT AND WHILE 386 ECONS DIDN’T POST SOLICITATONS FOR 7 YEARS AND DEALT

WITH THE VERY SAME CONTRACTORS THAT WERE PAYING BRIBES AND KICKBACKS AT ARIFJAN, THE AIR FORCE OSI HAVE FAILED TO REGISTER ONE

INVESTIGATION OR HAVE ONE CONVICTION. THIS SITE IS GOING TO UNCOVER WHAT THE OSI FAILED TO – A PATTERN OF AWARDING CONTRACTS TO

THE SAME CONTRACTORSAND CIRCUMVENTING THE COMPETITION IN CONTRACTING ACT.


  • Login