An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EU DANEX 2006

  2. EU DANEX 2006Management toolsTime-line

  3. EU DANEX 2006Management tools: • Exercise Instructions (electronic ”paper” to be published) • Master chart (detailed plan with annexes)

  4. Weekend before the exercise: Situation reports to Danish authorities Situation report to the EU MIC DISTAFF is established (key functions) Request sent to the EU MIC Reception Centre is prepared Possible reception of assessment personnel Possible reception of EU experts and teams Time-line

  5. Monday 18 September 2006 Time-line • Reception of assessment personnel • Reception of EU experts and teams • Reception Centre procedures • Reception of observers • Entry into camp (Slagelse) • Establishing of OSOCC • Meeting with LEMA • Welcome dinner (Slagelse)

  6. BARSEBÄCK Nuclear accident COPENHAGEN REVINGE KASTRUP Contaminated passengers in aircraft REVINGE HQ / OSOCC 2 Ammonia accident Chemical war fare agents SLAGELSE KORSØR SLAGELSE HQ / OSOCC 1 KORSØR Natural gas fire Train in tunnel NÆSTVED

  7. Tuesday 19 September 2006 Time-line • Incidents in Korsør and Kastrup (CPH Airport) • Catering in the field • Reception of observers and VIP • Situation report to national authorities and the EU MIC • Request to the EU MIC (need for teams in Sweden)

  8. Wednesday 20 September 2006 Time-line • Incidents in Korsør and Kastrup (CPH Airport) • Lunch in the field • Situation report to national authorities and the EU MIC • Moving to Sweden – EU experts and teams, OSOCC and DISTAFF • Teams arriving in tent camp Revinge • Dinner (Revinge)

  9. Thursday 21 September 2006 Time-line • Incidents in Revinge and Barsebäck • Lunch in the field or in Revinge • Situation report to national authorities and the EU MIC • Closing dinner (Revinge)

  10. Friday 22 September 2006 Time-line • Evaluation Workshop – key personnel • Pack up – vehicles and equipment • Closing of tent camp • Lunch • Exercise farewell • Transport to home countries

  11. After the exercise: Time-line • Evaluation work group and evaluators contribute to the final report • Compilation of the Final Technical Report • Publishing of the Final Technical Report - to the Commission and all member countries