Rural, Onsite & Small Community Wastewater & Waste Management. Facultative & Anaerobic Lagoons. Lagoon Systems. Objective Create an ideal environment for microorganisms to consume waste organic matter High strength waste - anaerobic lagoons Wastewater - Facultative lagoons

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'rural, onsite small community wastewater waste management' - Renfred


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Rural onsite small community wastewater waste management l.jpg

Rural, Onsite & Small Community Wastewater & Waste Management

Facultative & Anaerobic Lagoons


Lagoon systems l.jpg
Lagoon Systems Management

  • Objective

    • Create an ideal environment for microorganisms to consume waste organic matter

  • High strength waste - anaerobic lagoons

  • Wastewater - Facultative lagoons

    • AKA Stabilization ponds


Anaerobic lagoons l.jpg
Anaerobic Lagoons Management

  • Natural continuation of the breakdown of food in the body

  • Digestion without oxygen


Acid formers l.jpg
Acid Formers Management

  • Tough

  • Can produce organic acids over a wide range of environmental conditions

  • Organic acids

    • Lower pH of lagoon

    • Smell bad !!!


Methane formers l.jpg
Methane Formers Management

  • Delicate

  • Easily upset by

    • Low pH - below 6.7

    • High salt concentration (8mmhos/cm)





Startup l.jpg
Startup Management

  • Start in Summer

  • About 1/2 full of clean water

  • Slowly add waste at first

    • Design loading after 1 year


Loading l.jpg
Loading Management

  • Continuous

  • Check pH

    • Add lime if below 6.7


Pump out l.jpg
Pump out Management

  • Annually

  • Down to minimum treatment volume

  • Avoids salt buildup

    • If salts are over 8 mmhos/cm

    • Pump some out and add dilution water


Anaerobic lagoons12 l.jpg
Anaerobic Lagoons Management

  • Natural treatment system

  • No power required

  • Tend to be large

    • Dilution

    • Long treatment time

  • Low, but daily management


Stabilization pond l.jpg
Stabilization Pond Management

  • Sometimes called facultative lagoon

  • Digestion with oxygen

  • Used to treat wastewater


Stabilization pond14 l.jpg
Stabilization pond Management

  • Shallow basin

  • Microorganisms at natural concentration


Stabilization pond15 l.jpg
Stabilization Pond Management


Role of algae l.jpg
Role of Algae Management


Design l.jpg
Design Management

  • BOD loading

  • Hydraulic residence time

    • 3 to 12 months


Loading18 l.jpg
Loading Management

  • Can tolerate fluctuations in loading

  • Keep inlet below surface to control odors


Management l.jpg
Management Management

  • Maintain banks

    • Keep weeds from growing in water

    • Keep burrowing animals out

    • Keep trees from growing


Management20 l.jpg
Management Management

  • Maintain lnlet & Outlet Structures

    • Keep sludge from accumulating

    • Watch for signs of erosion

    • Exercise valves


Discharge l.jpg
Discharge Management

  • Ideal for irrigation systems

    • Appropriate level of treatment

    • Storage to maximize flexibility for operator


Sludge management l.jpg
Sludge Management Management

  • Debris may wash up on banks

    • Pretreat with screens

  • Small amounts of stabilized sludge can be entrained in irrigation system


Stabilization ponds l.jpg
Stabilization Ponds Management

  • Reduced management

    • No power requirement

    • Low labor time and training

    • Limited sludge management


Stabilization ponds24 l.jpg
Stabilization Ponds Management

  • Large

    • Treatment takes a long time

    • Affected by winter conditions


Relative size l.jpg
Relative Size Management

Fixed

Flim

1x

Lagoon

6x


Reduce the size l.jpg
Reduce the Size? Management

  • Stirring

    • Improves air transfer

    • Increases contact between micoorganisms and waste


Stirred pond l.jpg
Stirred Pond Management


Impact of stirring l.jpg
Impact of Stirring Management

  • Pond can be

    • Smaller

    • Deeper

    • Shorter residence time


Impact of stirring29 l.jpg
Impact of Stirring Management

  • Power required

  • More operator time & training

  • More sludge is generated


Readings l.jpg
Readings Management

  • Hammer & Hammer 413 - 419

  • MWPS 18 Section 7.1