UK Norway Share Fair 2006 - BP Norway April 20th 2006, Aberdeen. Terje Ohrstrand - Supply Chain Management, BP Norge AS Kjell M. Madsen – SCM Lead, Skarv Project. Topics. BP Norway – Assets & Licenses How to become a supplier to BP Norway What we look for in a supplier Estimated spend 2006

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'BP NORGE - UK-Norway Share Fair 2006' - Philip


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Uk norway share fair 2006 bp norway april 20th 2006 aberdeen l.jpg

UK Norway Share Fair 2006- BP NorwayApril 20th 2006, Aberdeen

Terje Ohrstrand - Supply Chain Management, BP Norge AS

Kjell M. Madsen – SCM Lead, Skarv Project


Topics l.jpg
Topics

  • BP Norway – Assets & Licenses

  • How to become a supplier to BP Norway

  • What we look for in a supplier

  • Estimated spend 2006

  • Possible Contract Opportunities 2006

  • Valhall Re-Development Project

  • Skarv Development Project

  • Entry points to BP Norway


Key facts l.jpg
Key facts

  • BP Norge Exploration and production

    • 564 employees

    • Average daily production: 82 200 barrels of oil equivalents BP net

    • Turnover: NOK 16.2 billion

    • Result: NOK 8.1 billion

      Figures as pr. January 2006

  • BP Fuels & Lubricants

    • 57 employees

    • Turnover NOK 244 million


Activities on the norwegian shelf l.jpg
Activities on the Norwegian shelf

  • Participant in 16 licences

  • Operator for 12 of those

  • Operates

    • Ula & Tambar

    • Valhall & Hod

  • Projects

    • Valhall Re-Development

    • Skarv-Idun Development

  • Partner in the Draugen field


Valhall and hod l.jpg
Valhall and Hod

  • Valhall production started 1982

  • Production to 2050 +

  • Remaining reserves 750 millioner boe

  • Estimated 2006 production 105 000 boe/d

  • 200 beds

  • Hod production started 1990

  • Estimated 2006 production

  • 8 500 boe/d

  • Unmanned wellhead platform remotely controlled from Valhall


Ula and tambar l.jpg
Ula and Tambar

  • Tambar production started 2000

  • Estimated 2005 production

  • 20 500 boe/d

  • Remaining reserves 24.2 mill boe

  • Unmanned wellhead platform

  • remotely controlled from Ula

  • Ula production started in 1986

  • Production to 2028+

  • Remaining reserves 92.7 mill boe

  • Estimated 2006 production 22 000 boe/d

  • 169 beds


How to become a supplier to bp norway l.jpg
How to become a supplier to BP Norway

  • Identify and connect with customer (BP end user)

  • Registered in Achilles as approved supplier with updated info

    • HSE - Self assesment (NORSOK S-006)

    • Products/Services

    • Track Record of Documented Capabilities

  • Meet minimum HSEQ Req.

    • HSEQ System and Processes

    • HSE Performance

  • HSE matters for allocation of work!

We will not find you if your capabilities are not registered!


What we look for in a supplier l.jpg
What we look for in a supplier

BP’s SCM Strategy: STARS

Sector strategies – Clear strategies for each sector maximising value whilst ensuring security of supply, enabled by a deep understanding of both BP’s demand and the characteristics of the market

Transparency– Clarity on all major cost and performance elements within the supply chain and their comparability with industry benchmarks

Aggregation– Aggregating spend to the highest level feasible and to the extent that this increases value

Relationships– Distinctive relationships based on performance, market reality, and technology development – access intellectual capital

Supply Chain Management – BP’s role in the supply chain understood and optimised

  • Leadership in HSE .

  • Track Record of Documented Capabilities

    • The right Products / Services

    • Execution Ability

  • Desired Attributes

    • Better use of technology

      • Improved Ops Efficiency

      • Value Creation

    • Innovative, Creative, Proactive

    • Willing to Share Ideas



Estimated 2006 spend mill usd gross l.jpg
Estimated 2006 Spend (mill USD gross)


Possible contract opportunities 2006 l.jpg
Possible Contract Opportunities 2006

  • Drilling & Wells

  • Drilling Fluids (NCS+UKCS)

  • Directional/MWD Service (NCS+UKCS)

  • Slick Line Services (NCS+UKCS)

  • Logistics

  • Platform Support Vessels (NCS)

    • (Stand-By Boats)

  • Valhall Re-Development Project

  • Skarv Development Project

  • Operations

  • RE Maintenance (NCS+UKCS)

    • Compressors

    • Pumps

  • Vendor Based Maintenance Services (NCS)

    • Valves, Cranes & Lifting Eqm’t

  • Instrumentation FA’s (NCS)

  • Industrial gas FA (NCS)

  • Electrical Consumables FA’s (NCS)

  • Other Projects

  • Tambar Multi-Phase Pump

  • Ula Gas Upgrade

  • Valhall Flank De-Bottelnecking

  • Valhall Re-Development Sub-Sea Installation

  • Valhall DP Derrick De-Commissioning


Valhall re development new production hotel facility l.jpg
Valhall Re-Development – New Production & Hotel Facility

  • New Facility Design Life - 40 years

  • Hotel - 150 single bed cabins

  • Oil production capacity - 150 mbopd

  • Gas handling capacity - 5 million Sm3/day

  • Total liquid capacity - 250 mbpd (oil & water)

  • Weight topside + hotel ~13 000 tne Weight jacket ~ 5 000 tne

  • Power from Shore - 292 km HVDC cable

  • Oil Export - Future offshore loading/EOR


Valhall redevelopment preliminary schedule l.jpg
Valhall Redevelopment – Preliminary Schedule

ITTs will be issued either directly from BP or via Mustang in Houston

See Procurement plan at www.bp.no


Skarv project overview l.jpg
Skarv - Project overview

  • Export Pipeline :

    • 80 km, 26”, Water depth 300 - 400 m

  • ÅTS – Tie In

    • Gassco commence FEED April 06


  • Skarv fpso l.jpg
    Skarv FPSO

    • FPSO with subsea tie-backs.

    • FPSO Design Capacity : 85mbd & 670MMSCFD

    • Largest Harsh Water Gas Processing FPSO

    • Oil Export via shuttle tanker.

    • Design for 95% OperatingEfficiency

    • Timing:

      • FEED thru 4Q 2006,

      • PDO 1Q 2007

      • Operate 3Q 2010






    Bp norway pscm entry points l.jpg
    BP Norway PSCMEntry Points

    Supply Chain Manager

    Hans Ole Lørup

    [email protected]

    Valhall and Ula PUs

    Performance Management

    Terje Ohrstrand

    [email protected]

    Wells

    Ian Kerr Millar

    [email protected]

    Reidar Håland

    [email protected]

    Agreements/ Purchasing

    Jarl Iversen

    [email protected]

    Operations & Logistics

    Arnfinn Bærheim

    [email protected]

    Bjørn Landsvik

    Bjoern.Landsvik

    @no.bp.com

    Crawford Page

    [email protected]

    Skarv PSCM

    Kjell Magne Madsen

    [email protected]

    VRD PSCM

    Simon Bateson

    [email protected]

    Development Projects PU


    ad