1 / 1

ICPV (Research, Design and Testing Institute for Railcars), IRS Group – Arad, Romania ASTRA VAGOANE (Freight cars), IRS

ICPV (Research, Design and Testing Institute for Railcars), IRS Group – Arad, Romania ASTRA VAGOANE (Freight cars), IRS Group – Arad, Romania. Railway tank car . Company Tradition in design and testing over 35 years One of the biggest railway freight wagons plant in Southern Europe (ASTRA)

Pat_Xavi
Download Presentation

ICPV (Research, Design and Testing Institute for Railcars), IRS Group – Arad, Romania ASTRA VAGOANE (Freight cars), IRS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICPV (Research, Design and Testing Institute for Railcars), IRS Group – Arad, RomaniaASTRA VAGOANE (Freight cars), IRS Group – Arad, Romania Railway tank car • Company • Tradition in design and testing over 35 years • One of the biggest railway freight wagons plant in Southern Europe (ASTRA) • Challenge • Migrate from 2D to 3D design • Large assemblies management • Verified interferences and colisions between moving parts • Apply design changes in a easy manner using initial design • SolidWorks Benefits: • Reduced design time by 25-30% • Eliminate errors from design stage • Modular flexible design of wagons using existing parts and subassembly library • Import 3D model for structural analysis “Using different assembly configurations we can create different wagon versions. Today, using SolidWorks, we can easely change dimensions, starting from initial project, keeping project integrity”  - Dr. Cornel Raicov, General Manager ICPV

More Related