Agenda. Overview Why TransCAD Challenges/tips Initiatives Applications. Overview. Transportation planning and policy guidance 3 C process Planning tools Travel demand modeling Project level forecasts. Role of Statewide Planning. Organizational Structure.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Agenda' - PamelaLan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Agenda l.jpg
Agenda

  • Overview

  • Why TransCAD

  • Challenges/tips

  • Initiatives

  • Applications



Role of statewide planning l.jpg

Transportation planning and policy guidance

3 C process

Planning tools

Travel demand modeling

Project level forecasts

Role of Statewide Planning



Model research and development team l.jpg

Technical service center for the branch

Provide expertise, research, and training in travel modeling

Advance travel modeling and analysis for the State of North Carolina

6 positions for advanced modeling

Model Research and Development Team


Planning groups l.jpg

MPO/RPO planning

17 MPOs

20 RPOs

Modeling for communities greater than 10,000 population

40 positions for planning/modeling

Planning Groups


Transcad modeling status l.jpg

3 regional models under development

Covering 9 MPOs

6 TransCAD MPO models currently in use

Developed ground up/converted

6 TransCAD MPO models in progress

Upgrades/new starts

10 non-MPO models

TransCAD Modeling Status


Ncdot modeling improvement goals l.jpg
NCDOT Modeling Improvement Goals

  • Develop “best modeling practices.”

  • Investigation of model improvements

  • New procedures to better address land use feedback

  • Tools to improve efficiency and reliability



Why ncdot decided to switch platforms l.jpg

Older platform no longer supported

Limited capabilities

Graphics, network size, TAZs

More GIS integration

Movement towards GIS based analysis

Compatible with ArcGIS

Ability to do spatial analysis

Why NCDOT Decided to Switch Platforms?


Why transcad diverse users l.jpg

Advanced developers

Developers

Advanced end users

Basic end users

Why TransCAD?Diverse Users


Why transcad general l.jpg

Windows based

Scenario manager for easy file management

Visualization

Data and database

GISDK

Why TransCAD?General


Why transcad gis capabilities l.jpg

Integration of GIS tools and technologies

Improved linkage between land use, transportation, and air quality

Development of database structures

Application batch files, GIS tools, and Graphical Users Interface

Why TransCAD?GIS Capabilities


Why transcad modeling process l.jpg

Data

Interface with ArcGIS

GIS database

Existing data sources (census, others)

Visualization

Why TransCAD?Modeling Process


Why transcad modeling process16 l.jpg

Networks

GIS database with unlimited attribute capabilities

GIS distances and shapes

Database linkages to other data sets

Why TransCAD?Modeling Process


Why transcad modeling process17 l.jpg

Trip generation

Robust cross classification model

GISDK programming for custom applications

Unlimited trip purposes

Multiple variables can be stored in TAZ land use data base or linked via parcel data base

Why TransCAD?Modeling Process


Why transcad modeling process18 l.jpg

Trip distribution

Geocode survey data to determine trip lengths

Visualize desire lines between zones or districts

Utilize curve functions for friction factors in place of lookup table

Why TransCAD?Modeling Process


Why transcad modeling process19 l.jpg

Mode choice

Built in procedures for streamlined transit analysis

Use GISDK to customize nested LOGIT model

Why TransCAD?Modeling Process


Why transcad modeling process20 l.jpg

Traffic assignment

Easy time of day analysis

User defined link volume-delay equation

Multiple assignment algorithms

Comparison tools for evaluating different assignments

Why TransCAD?Modeling Process


Why transcad modeling process21 l.jpg

Performance measures

Use database fields to easily query link types for evaluation

GISDK allows for consistent checking and reporting of model results

Visualization of results

Screenline analysis

User log available

Why TransCAD?Modeling Process



Challenges tips conversion process l.jpg

TIP: recommended for immediate use of TransCAD on existing models

TRIP: converted base is NOT ready to go

TIP: use performance measures to build confidence in converted model - will need to adjust for differences

TRIP: TransCAD recognizes real numbers - will account for differences

Challenges/tipsConversion Process


Challenges tips l.jpg

Think about things differently

File management

Dataview save

MAP save

Powerful computer

Challenges/tips



Initiatives l.jpg

Training

Standards

Users group

Applications

Initiatives



Slide28 l.jpg
GISDK Tools for Travel Demand ModelingModel Research & Development UnitNCDOT Statewide Planning Branch


Slide29 l.jpg

The Geographic Information System Developer’s Kit

(GISDK) provides you with a tool kit that you can use to get

outside the box and customize TransCAD in

any way you desire.


Model team goal process improvement l.jpg
Model Team Goal: Process Improvement

Through the development of applications tools for streamlining the model development process


Meeting the process improvement goal l.jpg
Meeting the Process Improvement Goal

  • Data management tool

  • Trip generation tool

  • Performance management tool

  • Miscellaneous tools



Old way of managing model data l.jpg
Old Way of Managing Model Data

  • Create separate fields for attribute data:

    • Travel time, capacity, ADT, facility type, functional classification, etc.

  • Enter data using TransCAD interface

  • Create multiple geographic files for different alternatives


Disadvantages of the old way l.jpg
Disadvantages of the Old Way

  • Manual recalculation of travel times and other attribute data

  • Current data entry approach is time consuming and prone to errors

  • Maintaining multiple geographic files is cumbersome and requires more disk space

  • Maintaining multiple geographic files increases the chance of introducing errors in the files



Model data management tools36 l.jpg
Model Data Management Tools

  • TransCAD GISDK script

  • Select data values automatically calculated

    • Travel time, 1-way attributes, facility type, etc

  • Easy user interface for entering data

  • Provides a data management system for multiple model alternatives

  • Alternatives managed from master file


Benefits of using data management tools l.jpg
Benefits of Using Data Management Tools

  • Reduced errors

  • Increased efficiency

  • Eliminates duplicated data

  • Requires less disk space

  • Maintains the consistency of the model data

  • Standardizes model data management


Calculate travel time tool l.jpg
Calculate Travel Time Tool

Calculates travel time, 1-way capacity, 1-way ADT, facility code and functional classification code automatically every time data is changed


Enter base data tool l.jpg
Enter Base Data Tool

Provides a GUI (graphic user interface) to enter or modify base model data for single or multiple links


Build base network tool l.jpg
Build Base Network Tool

Builds the base network from the master line layer


Identify new link tool l.jpg
Identify New Link Tool

Identifies the future links that are not in the base network


Enter alternative data tool l.jpg
Enter Alternative Data Tool

Provides a GUI to enter or modify alternative network data for single or multiple links


Build network alternative tool l.jpg
Build Network Alternative Tool

Builds the network alternative from the master line layer



Ncdot trip generation procedure l.jpg
NCDOT Trip Generation Procedure

  • Average trip rate per household

  • Percentage applied to total trips to determine trips by trip purpose

  • Accounts for CV trips and non-home based trips by non-residents

  • Data input in ASCII format and executed in C+ program


Disadvantages of the old way46 l.jpg
Disadvantages of the Old Way

  • Data input methodology is cumbersome and prone to data entry error

  • No ability to visualize data

  • User cannot easily interpret the data


Benefits of using trip generation tool l.jpg
Benefits of Using Trip Generation Tool

  • Reduced errors

  • Increased efficiency

  • Eliminates duplicated data

  • TransCAD data file facilitates visualization of data






Model calibration and validation l.jpg
Model Calibration and Validation

  • Iterative process

  • Based on observed data and reasonableness checking

  • GOAL: model performing within acceptable standards

  • Resources

    • Http://tmip.Fhwa.Dot.Gov/clearinghouse/docs/mvrcm

    • Http://ntl.Bts.Gov/docs/377cas.Html


Benefits of using performance management tool l.jpg
Benefits of Using Performance Management Tool

  • Standardization

  • Increased efficiency

  • Process is automated

  • Reduced user error

  • Great reporting tool