Atp requirements ncm
This presentation is the property of its rightful owner.
Sponsored Links
1 / 12

ATP REQUIREMENTS NCM PowerPoint PPT Presentation


  • 138 Views
  • Uploaded on
  • Presentation posted in: General

ATP REQUIREMENTS NCM. ATP requirements include: minimum hour requirements, task & iterations identified in appropriate ATM’s & Commanders Task List, Readiness level progression, and annual proficiency and readiness test (APART).

Download Presentation

ATP REQUIREMENTS NCM

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Atp requirements ncm

ATP REQUIREMENTS NCM


Atp requirements ncm 1226878

  • ATP requirements include: minimum hour requirements, task & iterations identified in appropriate ATM’s & Commanders Task List, Readiness level progression, and annual proficiency and readiness test (APART).


Atp requirements ncm 1226878

  • The Aircrew Training Program consist of Qualification, Refresher, Mission & Continuation training. The goal of the program is to develop mission-ready crewmembers.


Atp requirements ncm 1226878

  • The training year is divided into two semi-annual training periods. The first training period starts the day following the end of their birth month and continues for six months.


Atp requirements ncm 1226878

  • The second period starts the first day of the seventh month and continues through the end of the crewmembers birth month.


Atp requirements ncm 1226878

  • The NCM ARNG flying hour requirements for a RL1 or RL2 D/N/NVG are, 1st semi-annual period: 12 hours, 5 hour of which will be flown using night vision devices. 2nd semi-annual period: 12 hours, 5 hours of which will be flown using night vision devices.


Atp requirements ncm 1226878

  • These flying hour requirements may be prorated or reduced if the following occur: TDY, Medical or Non-medical suspensions.


Atp requirements ncm 1226878

  • NCM currency requirements consist of Airframe and NVG. If 90 days have elapsed since the last flight in the airframe, the NCM will be administered a PFE as per the ATM. If 60 days have elapsed since the last NVG flight of at least 1 hour, the NCM will be administered a NVG PFE.


Atp requirements ncm 1226878

  • The CTL (Commanders Task List), specifies the task and the modes of flight that must be perform per task. At a minimum, each NCM must perform one iteration of each task listed on the CTL and in each mode designated. An iteration is defined as the number of times a task has to be performed annually.


Atp requirements ncm 1226878

  • The Readiness Level identifies the training phases and measures a NCM’s readiness. They also provide a logical progression of an individuals proficiency in base and mission flight task and academic progression.


Atp requirements ncm 1226878

  • A NCM returning to a flight status after not having flown within a 180 days, must be designated RL3 for refresher training. If returning prior to 180 days, a records review and possibly a PFE will be administered so that a RL can be determined.


Atp requirements ncm 1226878

  • Click on the Hyperlink for your quiz.

    http://ang.quizstarpro.com


  • Login