Bay area toll authority san francisco oakland bay bridge east span seismic replacement project l.jpg
Advertisement
This presentation is the property of its rightful owner.
1 / 37

IBTTA April 19 PowerPoint PPT Presentation

Loma Prieta Earthquake (1989) New East Span of San Francisco-Oakland Bay Bridge ... ZPMC - Shanghai, China. ZPMC - Shanghai, China. ZPMC Fabrication Facilities ...

Download Presentation

IBTTA April 19

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Bay area toll authority san francisco oakland bay bridge east span seismic replacement project l.jpg

Bay Area Toll AuthoritySan Francisco-Oakland Bay Bridge East Span Seismic Replacement Project

IBTTA

April 19, 2009


Slide2 l.jpg

Loma Prieta Earthquake (1989)


Slide3 l.jpg

New East Span of San Francisco-Oakland Bay Bridge


Self anchored suspension span sas l.jpg

Self Anchored Suspension Span (SAS)


A long history l.jpg

A long history….

  • Extensive Public Input

  • Multiple Design Alternatives

  • Multiple Administrations

  • September 11

  • Single Bid


On the right track l.jpg

Accountable Project Delivery

AB 144 established the Toll Bridge Program Oversight Committee, composed of Director of the California Department of Transportation (Caltrans), and the Executive Directors of the California Transportation Commission (CTC) and the Bay Area Toll Authority (BATA), to be accountable for delivering the seismic project.

On the right track….

WILL KEMPTON

Director

California Department of

Transportation

STEVE HEMINGER

Executive Director

Bay Area Toll Authority

Bimla Rheinhart

Executive Director

California Transportation

Commission


Zpmc shanghai china l.jpg

ZPMC - Shanghai, China

2.25 miles


Zpmc shanghai china9 l.jpg

ZPMC - Shanghai, China

ZPMC Fabrication Facilities


Slide10 l.jpg

Shop Drawing Preparation

Sub-Assemblies Fabrication

Segment Assembly

Blast, Paint & Fit Up

Ready To Ship


Steel roadway decks l.jpg

Steel Roadway Decks

Steel Roadway Boxes Under Fabrication


Roadway deck fabrication shop l.jpg

Roadway Deck Fabrication Shop

Steel Roadway Boxes Under Fabrication


Steel roadway decks13 l.jpg

Steel Roadway Decks

Steel Roadway Boxes Under Fabrication


Slide14 l.jpg

Steel Roadway Boxes Ready for Fit-up


Slide15 l.jpg

Tower Leg Fabrication


Slide16 l.jpg

Tower Leg Fabrication


Slide17 l.jpg

Tower Leg in Rotating Jig


Slide18 l.jpg

Fabrication Inspection


Slide19 l.jpg

1,700 Ton Shear-leg Crane Barge Undergoing testing


Slide20 l.jpg

Shear-leg Crane Barge Arrival in San Francisco Bay


Temporary supports l.jpg

Temporary Supports

Temporary Support Structures


Temporary support truss looking east l.jpg

Temporary Support Truss Looking East

Temporary Support Structures


Slide23 l.jpg

Yerba Buena Island Detour Construction


Slide24 l.jpg

Stage 1 - Skid Beams and Temporary Support


Slide25 l.jpg

Stage 2 – Construct New Roll-in Truss


Slide26 l.jpg

Stage 3 – Complete Roll-in Truss


Slide27 l.jpg

Stage 4 – Close Bridge and Cut Loose Roll-out Truss


Slide28 l.jpg

Stage 5 – Roll-out Existing Truss


Slide29 l.jpg

Stage 6 – Roll-in New Truss


Slide30 l.jpg

Stage 7 – Open Detour to Traffic


Slide31 l.jpg

Yerba Buena Island Detour Construction


Slide33 l.jpg

Oakland Touchdown Under Construction


Slide34 l.jpg

Completed Skyway


Skyway 2007 l.jpg

Skyway (2007)

Completed Skyway


Slide37 l.jpg

http://bata.mtc.ca.gov