slide1
Download
Skip this Video
Download Presentation
Clarify and Validate Problem

Loading in 2 Seconds...

play fullscreen
1 / 1

Clarify and Validate Problem Cross-Functional Team ... - PowerPoint PPT Presentation


  • 719 Views
  • Uploaded on

EXAMPLE 1: 8-Step Problem Solving at Offutt AFB Improved Service Responses For Facilities Maintenance Activities Clarify and Validate Problem Develop Countermeasures Break Down Problem Determine Root Cause See Countermeasures Through Standardize Successful Processes Confirm Results

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Clarify and Validate Problem Cross-Functional Team ...' - Lucy


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

EXAMPLE 1: 8-Step Problem Solving at Offutt AFB

Improved Service Responses For Facilities Maintenance Activities

Clarify and Validate Problem

Develop Countermeasures

Break Down Problem

Determine Root Cause

See Countermeasures Through

Standardize Successful Processes

Confirm Results

Set Improvement Target

  • Cross-Functional Team (Maintenance, Manpower, and Abacus) Evaluated Current Process
  • Value Stream Mapping Identified Gaps Between the Inspection and Maintenance Steps
  • While Inspectors Were Able to Isolate Maintenance Needs and Issued Work Orders, Actual Maintenance Was Delayed Awaiting Parts and Labor.
  • Mapped Future State (New Process)
  • Successfully Deployed the DIN Concept to Other Air Force and DoD MEO and HPO Efforts
  • Streamlined Process to Reduce Lag Time Between Problem Identification and Resolution
  • Inspectors Provided With Standard Parts and Equipment to Perform Routine Actions Upon Discovery
  • Formal and Informal Work Zones
  • Reduce Lag Time Between Problem Identification and Mitigation
  • Increase “First Time Resolution” of Routine Maintenance Activities
  • Implemented a “Do It Now” (DIN) Process and Philosophy
  • Trained Process Owner and Workers
  • Verified Implementation During Phase-In and Initial Performance Periods
  • Implemented the New Process as a Part of the MEO. Realized a 54.6% Annual Savings, or $5.04M!
  • Incorporated Metric into Performance Dashboard Reporting (Management Tool)
  • Team Used Brainstorming and 5 Whys to Isolate Problem
  • Inspectors Had the Capability, but not the Tools and Parts to Perform Required Actions Upon Discovery
  • Labor Location and Availability Inefficient