Lean Six Sigma Methodology
Download
1 / 14

PowerPoint presentation - PowerPoint PPT Presentation


  • 273 Views
  • Updated On :

Lean Six Sigma Methodology http://www.tefen.com/industries.asp?pageInstanceId=150 Attributes of Lean Producers - they use JIT to eliminate virtually all inventory build systems to help employees produce a perfect part every time reduce space requirements

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'PowerPoint presentation' - Gabriel


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Slide1 l.jpg

Lean Six Sigma Methodology

http://www.tefen.com/industries.asp?pageInstanceId=150


Attributes of lean producers they l.jpg
Attributes of Lean Producers - they

  • use JIT to eliminate virtually all inventory

  • build systems to help employees produce a perfect part every time

  • reduce space requirements

  • develop close relationships with suppliers

  • educate suppliers

  • eliminate all but value-added activities

  • develop the workforce

  • make jobs more challenging

  • reduce the number of job classes and build worker flexibility


Waste in operations l.jpg
Waste in Operations

  • Overproduction

  • Waiting time

  • Transporting

  • Non-value added processing

  • Inventory

  • Defects

  • Underutilized talent

Fig. 15.1, p. 686


Slide4 l.jpg

Time Function Map

Receive product

Order Product

Customer

Process Order

Sales

Productioncontrol

Order

Wait

Order

Print

Plant A

Product

WIP

Wait

Wait

Wait

Warehouse

Product

WIP

Plant B

Extrude

Product

WIP

WIP

Transport

Move

Move

12 days

13 days

1 day

4 days

1 day

10 days

9 days

1 day

1 day


Production process flow diagram l.jpg
Production Process Flow Diagram

Customer

Purchasing

(order inks, paper, other supplies)

Customer sales representative

take order

Vendors

Prepress Department

(Prepare printing plates and negatives)

Receiving

Accounting

Printing Department

Warehousing

(ink, paper, etc.)

Gluing, binding, stapling, labeling

Collating Department

Information flow

Material flow

Polywrap Department

Shipping


5 whys example l.jpg
5 WhysExample

The Washington Monument is disintegrating.Why? Use of harsh chemicalsWhy? To clean pigeon poopWhy so many pigeons? They eat spiders and there are a lot of spiders at monumentWhy so many spiders? They eat gnats and lots of gnats at monumentWhy so many gnats? They are attracted to the light at dusk.Solution: Turn on the lights at a later time.


5 s philosophy l.jpg
5 S Philosophy

  • Seiri – Sort

  • Seiton – Set in Order

  • Seiso – Shine

  • Seiketsu – Standardize

  • Shitsuke – Sustain


Steps to reduce setup time l.jpg

90 min

Initial Setup Time

Separate setup into preparation, and actual setup, doing as much as possible while the machine/process is running (save 30 minutes)

Step 1

60 min

Move material closer and improve material handling (save 20 minutes)

Step 2

45 min

Standardize and improve tooling (save 15 minutes)

Step 3

25 min

Use one-touch system to eliminate adjustments (save 10 minutes)

Training operators and standardizing work procedures (save 2 minutes)

Step 4

Step 4

15 min

13 min

Step 5

Steps to Reduce Setup Time


Small versus large lots l.jpg
Small versus Large Lots

JIT produces same amount in same time if setup times are lowered

JIT Small Lots

C

A

A

B

B

B

C

A

A

B

B

B

Time

Small lots also increase flexibility to meet customer demands

Large-Lot Approach

C

A

A

A

A

B

B

B

B

B

B

C


Jit reduced waste at hewlett packard l.jpg
JIT Reduced Wasteat Hewlett-Packard

Waste Reduction (%)

Setup Time

20%

Scrap

30%

Finished Goods Inventory

30%

Space

40%

Lead Time

50%

Raw Material Inventory

50%

Work-in-Process Inventory

82%

0%

20%

40%

60%

80%

100%


Visible kanban control l.jpg
Visible Kanban (Control)

Production

Move

Production

Move

1- Card Kanban

2-Card Kanban

Visible Kanban



Kaizen continuous improvement l.jpg
Kaizen – Continuous Improvement

DMAIC

Define

Measure

Analyze

Improve

Control


Kaizen continuous improvement14 l.jpg
Kaizen – Continuous Improvement

PDSA

Plan

Do

Study

Act