Conservation of the Lowland Savannas of Belize Darwin project 17-022 . Second Annual Meeting of Project Partners 14 th May 2010 Belmopan. Agenda. Introduction: purpose of project 17-022; Summary of activity Sept 09- May ’10 Activities scheduled for year 2

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Conservation of the ' - Donna


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Conservation of the lowland savannas of belize darwin project 17 022 l.jpg

Conservation of the Lowland Savannas of BelizeDarwin project 17-022

Second Annual Meeting of Project Partners

14th May 2010

Belmopan


Agenda l.jpg
Agenda

  • Introduction: purpose of project 17-022;

  • Summary of activity Sept 09- May ’10

  • Activities scheduled for year 2

  • Summary: status of project after 1 year


Project objectives l.jpg
Project Objectives

Scientific Baseline activities

Mapping of lowland savanna extent and structure from RS data

Develop a checklist of savanna species

Training and knowledge transfer

Build up savanna monitoring capacity

Build botanical curation capacity

Raise awareness of savanna ecosystem


New partners and collaborators l.jpg
New Partners and collaborators

New project Partners

BERDS,

Planet Action

Collaborations:

LIC; Lands & Surveys, BATSUB, Wildtracks

Darwin 17012 (Mammal Corridor project)

TIDE, YCT, BeFREE,

Consultations

APAMO, Belize & UK High Commissions


Slide5 l.jpg

Progress since first partner meeting (3rd September 2009)

September 2009 – May 2010


Rbge activity sept 09 may 10 l.jpg
RBGE Activity Sept 09 - May 10

  • 300 plant collections at 10 sites (4/9 – 13/10)

  • Database of 4,000 savanna plant records created

  • Draft checklist produced

  • First draft of colour photo-guide created

  • 15 person weeks of botanical training

    • Plant Taxonomy course run at Hillbank

    • Herbarium user course run at ERI




Ub activity sept 09 may 10 l.jpg
UB Activity Sept 09 - May 10

  • Dr Kay attended Darwin project partner meeting in Brazil and 4NR Meeting in Belize

  • ERI Inaugurated January 2010

  • Darwin botanist German Lopez hired 4th January

    • Contributing to botanical collecting and curation

    • Attended 3 training courses in Belize

    • Attended 4 week training in UK




Bbg activity may 10 l.jpg
BBG Activity - May 10

  • Design and planning of the savanna trail

  • Purchase and preparation of materials

  • Delivery of soil, grading and landscaping to create basis of savanna habitat (Oct-Dec 09)

  • Staff attend Hillbank training course (January)

  • Seed collecting (January)

  • Formulation of planting lists

  • Live plant collecting (May)





Uoe activity sept 09 may 10 l.jpg
UoE Activity Sept 09 - May 10

  • Project co-ordination and reporting

  • Maintaining http://www.eeo.ed.ac.uk/sea-belize

  • Acquisition & processing of ALOS + IKONOS imagery

  • Ground validation surveys (January 2010)

  • Mapping consultation in Belize (January 2010)

  • 3 person-weeks of GPS/GIS training (January 2010)

  • Production of savanna ecosystem mapping and pre-release to BERDS for evaluation (Feb-May 2010)


Slide18 l.jpg

Level 2

Patch Level

Level 1

Landscape-level

Broken Ridge

Gallery Forest

Forest

Forest Patches

Mixed

Savanna Woodland

“Savanna Landscape”

Pine Dominated

Savanna

Open Savanna

Seasonally inundated

savanna shrubland

Wetland

Wetland patches

Urban/Agro/Industry



Status of project activities after 1 year l.jpg
Status of project activities after 1 year

New map of savanna ecosystem of Belize nearing completion

Checklist of plant species – first draft created

Photo Guide – sample template created

Training activities completed as scheduled

Plant collecting slightly behind schedule


Achievements in year 1 l.jpg
Achievements in year 1

  • New nationwide mapping of the savanna ecosystem produced from SPOT imagery;

  • First comprehensive database created of savanna collections made in Belize

  • ‘Fledgling’ Darwin Savanna Trail created at Belize Botanic Gardens;

  • Darwin identity used to leverage a further £ 45,000 of funding and donations in kind from other organisations to support this project