Project related procurement using project manufacturing
Download
1 / 12

Project Related Procurement using Project Manufacturing - PowerPoint PPT Presentation

Project Related Procurement using Project Manufacturing Atlanta OAUG Sachin M. Joshi, KPMG LLP. Purpose Elaborate functionality provided by project manufacturing from procurement perspective. Integration of Project Manufacturing module with Oracle Purchasing, Inventory and Order Entry

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha

Download Presentationdownload

Project Related Procurement using Project Manufacturing

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Project related procurement using project manufacturing l.jpg

Project Related Procurement using Project Manufacturing

Atlanta OAUG

Sachin M. Joshi, KPMG LLP.


Slide2 l.jpg

Purpose

  • Elaborate functionality provided by project manufacturing from procurement perspective.

  • Integration of Project Manufacturing module with Oracle Purchasing, Inventory and Order Entry

  • Setup considerations.


Functional requirements l.jpg

Functional Requirements

Stock the goods by projects to ensure availability of material at project site and reduce the delays.

  • Procure, Stock and Issue goods by project.

  • Interface the project inventory cost to Oracle Projects.


Project manufacturing and purchasing l.jpg

Project Manufacturing and Purchasing

  • Enter project related requisitions and purchase orders with destination type inventory.

  • Project information defaults from requisition to purchase orders to receipts.

  • Requisition and Purchase Orders are interfaced as commitments to Oracle Projects.


Project manufacturing and inventory l.jpg

Project Manufacturing and Inventory

  • Two segments Project and Task are added to stock locator flex field structure.

  • Segregate inventory by project or project/task.

  • Project to Project transfer of material.

  • Open stock to project transfer of material and vice versa.


Project manufacturing and inventory7 l.jpg

Project Manufacturing and Inventory

  • Misc. issue to the project and Misc. receipts from the project.

  • Cost collector transfers the cost of project related inventory transactions to Oracle Projects interface table


Project manufacturing and internal sales order l.jpg

Project Manufacturing and Internal Sales Order

  • Enter Internal Requisition and specify the project or project/task from which to issue the material.

  • Internal Sales Order created also has the project reference.

  • During pick release system picks the goods from project inventory.

  • Cost related to issue transaction is not interfaced to Oracle Projects.


Project manufacturing setup considerations l.jpg

Project Manufacturing Setup Considerations

  • Weighted average costing.

  • Project Control Level at project or project/task level.

  • Cost Groups.


Project manufacturing setup considerations10 l.jpg

Project Manufacturing Setup Considerations

  • Planning Groups.

  • Project Parameters.

  • Link expenditure types to cost sub elements.


Summary l.jpg

Summary

  • Functionality provided by project manufacturing from procurement perspective.

  • Integration of project manufacturing with other modules.

  • Setup consideration.


Project related procurement using project manufacturing12 l.jpg

Project Related Procurement using Project Manufacturing

Q & A


ad
  • Login