1 / 8

Lean Office – Layout & Cells Superfactory Excellence Program™ www.superfactory.com

Lean Office – Layout & Cells Superfactory Excellence Program™ www.superfactory.com. Objectives of the Layout Strategy. Develop an economical layout which will meet the requirements of: product design and volume (product strategy) process equipment and capacity (process strategy)

Audrey
Download Presentation

Lean Office – Layout & Cells Superfactory Excellence Program™ www.superfactory.com

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lean Office – Layout & CellsSuperfactory Excellence Program™www.superfactory.com © 2005 Superfactory™. All Rights Reserved.

  2. Objectives of the Layout Strategy • Develop an economical layout which will meet the requirements of: • product design and volume (product strategy) • process equipment and capacity (process strategy) • quality of work life (human resource strategy) • building and site constraints (location strategy) © 2005 Superfactory™. All Rights Reserved.

  3. Six Layout Strategies • Fixed-position layout • large bulky projects such as ships and buildings • Process-oriented layout • deals with low-volume, high-variety production (“job shop”, intermittent production) • Office layout • positions workers, their equipment, and spaces/offices to provide for movement of information © 2005 Superfactory™. All Rights Reserved.

  4. Six Layout Strategies - continued • Retail/service layout • allocates shelf space and responds to customer behavior • Warehouse layout • addresses trade-offs between space and material handling • Product-oriented layout • seeks the best personnel and machine use in repetitive or continuous production © 2005 Superfactory™. All Rights Reserved.

  5. E.R.Triage room Patient A - broken leg E.R. Admissions Patient B - erratic pacemaker Surgery Laboratories Radiology E.R. beds Pharmacy Billing/exit Emergency Room Layout © 2005 Superfactory™. All Rights Reserved.

  6. Cellular Workplaces Includes Every Step Source Inspection Point of Use Storage Flexible Output Reduced Lot Size Simplified Handling Visual Goals & Metrics FG RM © 2005 Superfactory™. All Rights Reserved.

  7. Retail Layouts - Some Rules of Thumb • Locate high-draw items around the periphery of the store • Use prominent locations such as the first or last aisle for high-impulse and high margin items • Remove crossover aisles that allow customers the opportunity to move between aisles • Distribute what are known in the trade as “power items” (items that may dominate a shopping trip) to both sides of an aisle, and disperse them to increase the viewing of other items • Use end aisle locations because they have a very high exposure rate © 2005 Superfactory™. All Rights Reserved.

  8. 5 C 10 Min. 11 3 7 3 A B G F I 4 D 12 11 E H Precedence Diagram Example © 2005 Superfactory™. All Rights Reserved.

More Related