Air Pollution Source Permitting. For Boat Manufacturers The Boat Manufacturing MACT  an EPA Workshop February 8, 2002 IBEX conference Ft. Lauderdale Convention Center. Nationwide Permitting…. A Boat Manufacturing facility that is subject to the NESHAP standard 40 CFR 63 Subpart VVVV

I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.

Download Presentation

Air Pollution Source Permitting

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Air pollution source permitting l.jpg

Air Pollution Source Permitting

For Boat Manufacturers

The Boat Manufacturing MACT

 an EPA Workshop

February 8, 2002

IBEX conference

Ft. Lauderdale Convention Center


Nationwide permitting l.jpg

Nationwide Permitting…

A Boat Manufacturing facility that is subject to the NESHAP standard 40 CFR 63 Subpart VVVV

  • is a major source of hazardous air pollutants (HAPs)

  • and should already have a Title V (Part 70) Permit.

    However, at this point in time, unless it is also

    a major source of volatile organic compounds

    (VOCs) there may not be much more than

    recordkeeping requirements in the permit.


Nationwide permitting cont d l.jpg

Nationwide Permitting (cont’d)…

  • Reopening of the Title V Permit for Cause when additional requirements become applicable.

    • Title V permits with expiration dates of August 22, 2004 or later, must be reopened and significantly modified by February 22, 2003 to include the NESHAP requirements.


Nationwide permitting cont d4 l.jpg

Nationwide Permitting (cont’d)…

  • Reopening of the Title V Permit for Cause when additional requirements become applicable (cont’d)…

    • Proceedings to reopen and reissue a permit

      • shall follow the same procedures as apply to initial permit issuance, and

      • shall affect only those parts of the permit for which cause to reopen exists.


Nationwide permitting cont d5 l.jpg

Nationwide permitting (cont’d)…

  • In order to escape complying with the NEHSAP regulations, an existing facility that is currently a major facility has until the compliance date of the NESHAP (August 23, 2004) to become permitted as a non-major (area) source.

  • If a facility uses the material consumption option described in

    Sec. 63.5686(b) to demonstrate that it is not a major source, the facility must start keeping records no later than

    August 23, 2003.


Florida permitting for area source boat manufacturers l.jpg

Florida Permitting for Area Source Boat Manufacturers

  • Permitting Options

    • Federally Enforceable State Operation Permit (FESOP)

    • Air Construction / Air Operation Permits

    • Non-Title V General Permit

  • Exemption


Florida permitting for area source boat manufacturers cont d l.jpg

Florida Permitting for Area Source Boat Manufacturers(cont’d)

  • Permitting Options (cont’d)

    • Federally Enforceable State Operation Permit (FESOP)

      • Good choice for a facility that is currently a major source and wants to become an area source

      • Good choice for an existing area source that has never had an air construction permit and can not qualify for a General Permit.


Florida permitting for area source boat manufacturers cont d8 l.jpg

Florida Permitting for Area Source Boat Manufacturers(cont’d)

  • Permitting Options (cont’d)

    • Air Construction / Air Operation Permits

      • Good for a new area source facility thatcan not qualify for a General Permit.


Florida permitting for area source boat manufacturers cont d9 l.jpg

Florida Permitting for Area Source Boat Manufacturers(cont’d)

  • Permitting Options (cont’d)

    • Non-Title V General Permit (GP) for “Polyester Resin Plastic Products Fabrication”

      • Good for most area sources.

      • Gap in material consumption applicability criteria for General Permit and applicability of NESHAP.

        • GP limit: 38 tons per year (tpy)

        • NESHAP limit: less than 50 tpy


Florida permitting for area source boat manufacturers cont d10 l.jpg

Florida Permitting for Area Source Boat Manufacturers(cont’d)

  • Permit Exemption (No Permit Required)

    • Generic Facility Exemption if the facility emits or has the potential to emit …

      • Less than 1 tpy of any hazardous air pollutant;

      • Less than 2.5 tpy of total hazardous air pollutants;

      • Less than 25 tpy of CO, NOX, and SO2;

      • Less than 1000 pounds per year of lead; and

      • Less than 10 tpy of any other regulated pollutant [example: Volatile Organic Compounds (VOCs)]

        …and there are no unit-specific applicable requirements.


For further information l.jpg

For further information

call…


Florida permitting authorities l.jpg

Florida Permitting Authorities

District Air ProgramsPhone #

West Palm Beach 561-681-6600

Ft. Myers941-332-6975

Orlando407-894-7555

Tampa813-744-6100

Jacksonville904-807-3300

Pensacola850-595-8300


Florida permitting authorities cont d l.jpg

Florida Permitting Authorities(cont’d)

Local Air ProgramsPhone #

Broward County954-519-1220

Dade County305-372-6925

Palm Beach County561-355-3070

City of Jacksonville904-630-4900

Orange County407-836-1447

Hillsborough County813-272-5530

Sarasota County941-378-6128


  • Login