Series patch evolution from el puma
Download
1 / 9

SERIES - PowerPoint PPT Presentation


  • 266 Views
  • Updated On :

SERIES Patch Evolution from El Puma. A Preliminary Report by Nelson D. Sherry Adrian Marchetti Philippe Juneau. Tully Departure. El Puma Departs. + Fe. + Fe. Light Depths vs. Mixed-layer. El Puma Patch Survey #1. El Puma Patch Survey #2. July 28, 2002 Patch day 19.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'SERIES' - Angelica


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Series patch evolution from el puma l.jpg

SERIESPatch Evolution from ElPuma

A Preliminary Report by

Nelson D. Sherry

Adrian Marchetti

Philippe Juneau


Slide2 l.jpg

Tully Departure

El Puma Departs

+ Fe

+ Fe



Slide4 l.jpg

ElPuma Patch Survey #1


Slide5 l.jpg

ElPuma Patch Survey #2

July 28, 2002

Patch day 19

Chlorophyll – green

Nitrate - contours

Chlorophyll – green

Sigma-T - contours


Slide6 l.jpg

Tully Departs

El Puma Departs

2nd + Fe


Size fractionated pp l.jpg
Size Fractionated PP

Tully Departs

2nd + Fe

2nd + Fe

Tully Departs

1% Light

100% Light

PP (mg C m-3 d-1)

0.1% Light

10% Light

July 2002 Day



Conclusions l.jpg
Conclusions

  • Rapid and small initial response

  • The bloom peaked:

    • Physiologically on ~July 21st (day 12).

    • PP peaked on July 24th (day 15)

    • Chlorophyll peaked on July 24-26 (days 15-17)


ad