Pascor group
Download
1 / 14

PASCOR Group - PowerPoint PPT Presentation


  • 209 Views
  • Uploaded on

PASCOR Group. Industry Adviser : Craig Smit Product Engineer Faculty Adviser : Chien Wern, Ph.D. Team Members : Jeremie Bilisari Steve Greene Joe Hartley Robby Hoff Matt Smith. Overview. Background Mission Statement Project Objectives P roject D esign S pecifications

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'PASCOR Group' - Albert_Lan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Pascor group l.jpg

PASCOR Group

Industry Adviser: Craig Smit

Product Engineer

Faculty Adviser: Chien Wern, Ph.D.

Team Members: Jeremie Bilisari

Steve Greene

Joe Hartley

Robby Hoff

Matt Smith


Overview l.jpg
Overview

  • Background

  • Mission Statement

  • Project Objectives

  • Project Design Specifications

  • Final Design Selection

  • Performance Evaluation

  • What’s Left

  • Conclusion


Background l.jpg
Background

  • PASCOR – Pacific Air Switch Corporation


Background4 l.jpg
Background

  • Brazing Process


Background5 l.jpg
Background

  • Current Strip Forming System


Mission statement l.jpg
Mission Statement

  • The design team will develop a fully automated device to cut and form strips of silver. The device is required to produce strips quickly and accurately while being robust and portable.


Project objectives l.jpg

2”, 3”, 5” & 6.5”

1/4”

Tolerance

( +/- 1/16” )

R=1/4”

Project Objectives

  • Design and Build a Functional Prototype to Replace Current System.

  • Maintain Tolerances

  • Multiple Lengths

  • Quick


P roject d esign s pecifications l.jpg
Project Design Specifications

  • High Priority Criteria

    -Safety: Emergency Switch & Safety Guards

    - Performance: Adjustability, Tolerance & Parts/sec.

  • Medium Priority Criteria

    -Durable

    - Use of Replaceable Parts

    -Cost of Production < $5,000

  • Low Priority Criteria

    -Curvature of Strips



Performance evaluation l.jpg
Performance Evaluation

  • Targets Met:

    - Length Tolerance: 2” pieces within 1/32” (Goal was 1/16”)

    - Radius Curvature: 1/4” radius achieved

    - Length Curvature: Achieved

    - Multiple Lengths: Programs for all required lengths

    - Weight ~ 45 lbf (Goal was < 50 lbf)

    - Cost ~ $2500 (Budget Was $5000)

  • Targets Not Met:

    - Parts Per Time: 2” piece @ 1.8 sec.  6.5” piece @ 5 sec.


What s left l.jpg
What’s Left

  • Install Emergency Stop Switch

  • Install Photoelectric Sensor

  • Adjust Final Three Lengths to Tolerance

  • Encase Machine

  • Consider Ventilation of Electrical Parts

  • Incorporate High Speed Card



Special thanks l.jpg
Special Thanks

  • Mike Flaman @ PCC for Machining Help

  • Pacific Machinery & Tool Steel for material donations

  • Shawn Dunigan @ ABC Electric for PLC programming assistance



ad